A-3 SF 30 S-10-0383.pdf
PDF 33 KB Posted
- Attached to
- RECOVERY-CNF Wastewater Improvements Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0383
About this file
Amendment 3 SF 30
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9702-S-10-0383
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
VALLEJO CA 94592
1323 CLUB DRIVE
EROC SOUTHWEST
USDA FOREST SERVICE
VALLEJO CA 94592
1323 CLUB DRIVE
EROC SOUTHWEST
USDA FOREST SERVICE
CIM-05-02F05/27/2010000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/11/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The work consists of the Installation of four separate septic systems at the El Cariso Hot
Shot Camp and the Replacement of the existing septic tank at the Silverado Fire Station.
This project is funded by the American Recovey & Reinvestment Act (ARRA).
RECOVERY (ARRA)- The purpose of this Amendment 3 is to 1) Revise and Replace the Schedule of Items (Att 1), 2) add Specification Section 01505 - Mobilization (ATT 2);
Specification Section 02050 - Demolition (Att 3); Specification Section 03100 - Concrete
Formwork (Att 4); and Specification Section 03200 - Concrete Reinforcement (Att 5) of this
Amendment, add to the Request for Quote Documentation; and 3) Answers to Vendor's Questions that follow:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
GEORGE MORRISSEY
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-9702-S-10-0383/000003
Q)Can you tell me how the material testing and special inspections will be handled for the
Recovery Cleveland National Forest Wastewater
Improvements Project? Via the owner or the
Contractor?
A)All material testing and special inspections and quality control will be the responsibility of the contractor.
Q)Are your requiring cleanouts every 50 feet?
A)Cleanouts will be required to be installed AS
SHOWN ON
CONTRACT DRAWINGS and where the Uniform Plumbing
Code 2006 with California amendments, requires they be installed for this type of sewer installation.
BID SUBMITTAL DATE IS CHANGED FROM: June 2, 2010, 2:00 PM Pacific Time TO: June 4, 2010, 2:00 PM
Pacific Time
PLEASE FOLLOW SECTION L BID SUBMITTAL
INSTRUCTIONS IN THE REQUEST FOR QUOTE PACKAGE.
THE ONLY INFORMATION CHANGE IS THE BID SUBMITTAL
DATE. BE SURE AND SUBMIT AMENDMENTS 1-3 SIGNED
AND DATED WITH YOUR BID PACKAGE DOCUMENTS.
Period of Performance: 06/15/2010 to 08/20/2010
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .