RECAPITALIZE RUNWAY 1-19 at U. S. COAST GUARD BASE ELIZABETH CITY, NC.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 70Z04725RPCNI0001
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Elizabeth City, North Carolina 27909, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Coast Guard is seeking design-build services for the recapitalization of Runway 1-19 at its Base in Elizabeth City, North Carolina, through an exclusive solicitation for contractors on the current DHS/USCG National Multiple Award Construction Contract III (NMACC III), Pool 1. The base contract requires restoring the 4,518-foot by 150-foot runway and associated Taxiways Kilo and Golf to operational conditions, including installing FAA-compliant LED edge lighting, guidance signs, and lighting system components. An optional scope involves constructing a North Turnaround Pad compatible with HC-130 aircraft operations. Evaluation criteria will focus on the offeror's airfield design and construction experience, key personnel qualifications, and relevant past performance, with a best value tradeoff approach between non-price factors and price. Request for Information (RFI) submissions were due by January 6, 2025, with proposals due by March 14, 2025, at 4:30 PM local time in Norfolk, VA.
The contract is not set aside for any specific small business category and is open only to current NMACC III, Pool 1 contractors. The project is estimated to be valued between $45-55 million, with a performance period of 731 calendar days from award. The work will take place at the U.S. Coast Guard Base located at 1449 Weeksville Road in Elizabeth City, North Carolina 27909. Construction will include full demolition and reconstruction of failed runway pavements, restoration of certain pavements through substrate repairs and asphalt resurfacing, and installation of new airfield infrastructure. The project aims to restore the runway to its original operational status, supporting civilian and military aircraft operations, including critical search and rescue missions and flight training programs. Contractors must comply with FAA standards, UFC 03-260-01 requirements, and various technical specifications outlined in multiple amendments to the original solicitation.
Notice text
11 versions
Update #11 · Latest ·
Amendment 0010 for Solicitation 70Z04725RPCNI0001
- Submission Instructions Reminder
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #10 ·
Amendment 0008 for Solicitation 70Z04725RPCNI0001
- RESPONSES TO FOLLOW-ON RFI QUESTIONS;
- Per RFI Question #242, SFRL 4027990 CAD Files provided via DODSafe 3/4/2025.
- E-City Architectural CAD Record Dwg
- E-City Civil CAD Record Dwg
- E-City Elec Record Drawings
- E-City Structural CAD Record Dwg
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #9 ·
Amendment 0008 for Solicitation 70Z04725RPCNI0001 - Additional Clauses Updates
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #8 ·
Amendment 0007 for Solicitation 70Z04725RPCNI0001 - Clause Update
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #7 ·
Amendment 0006 for Solicitation 70Z04725RPCNI0001 - Delete PLA Rquirement form Section III. SUBMISSION INSTRUCTIONS of the Task Order Announcement
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #6 ·
Amendment 0005 for Solicitation 70Z04725RPCNI0001 - Extend Proposal Due Date
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #5 ·
Amendment 0004 for Solicitation 70Z04725RPCNI0001 - RFI responses, C-100_REV 23JAN25 (.pdf), and C-003 (.pdf)
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #4 ·
Amendment 0003 for Solicitation 70Z04725RPCNI0001 - RFI responses, Final EA for ReOpening of Runway ECity_Dec2023 with signatures (.pdf), USCG Base Elizabeth City - Final Submittal Drawings (Previous Project) (.pdf), and USCG Base Elizabeth City - Runway 2-28 Project Design (.pdf)
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #3 ·
Amendment 0002 for Solicitation 70Z04725RPCNI0001 - RFI due date extended, Proposal due date extended, Site Visit Log attached
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #2 ·
Amendment 0001 for Solicitation 70Z04725RPCNI0001 - Site Visit Information
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Update #1 ·
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
Files
Show all 24
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECAPITALIZE RUNWAY 1-19 at U. S. COAST GUARD BASE ELIZABETH CITY, NC. | Award Notice | |