Quality Assurance Materials Testing Laboratory for the Moose Creek Dam Safety Modification Project North Pole, Alaska
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911KB21R0053
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541380 Testing Laboratories and Services
- Place of performance
- North Pole, Alaska 99705, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to establish and operate a quality assurance materials testing laboratory at the Moose Creek Dam project site in North Pole, Alaska to support construction of a partial-depth barrier wall through approximately 4.5 miles of the dam embankment. The Department of the Army Corps of Engineers Engineering District Alaska requires the laboratory to independently monitor the soil-cement-bentonite and soils work for the duration of the project through field inspections, materials sampling, and testing in accordance with ASTM standards. The contractor must establish the physical laboratory structure, required equipment, validated processes, and quality assurance programs by the established deadline of May 1, 2022. The proposal due date was September 14, 2021 with questions due by September 7, 2021.
There is no set-aside designation for this opportunity. The NAICS code is 541380 and PSC code is R425. The contractor will establish the laboratory at the project staging area to provide testing services from notice to proceed through January 2024 under the base contract with options to extend performance through October 2025. The laboratory must support the dam safety modification project through staffing, equipment, facilities, utilities, and specified materials testing for soil-cement-bentonite and soils throughout the duration of construction activities. Pricing will be on a firm-fixed-price basis for line items including mobilization, management, facility maintenance, and individual test methods.
Notice text
4 versions
Update #4 · Latest ·
Perform Quality Assurance (QA) duties on the construction of a partial-depth barrier wall through approximately 4.5 miles of the Moose Creek Dam (MCD) embankment consisting of soil-cement-bentonite material in North Pole, AK. This contract is to establish a validated material testing laboratory at the MCD Safety Modification project staging area to support field inspections, perform material sampling and perform testing required to independently monitor the soil-cement-bentonite and soils work for the duration of the project. Contractor will supply all labor, equipment and materials to perform the services described herein. The general scope of services to be provided must include, but not limited to, establishment of the physical structure for the QA materials testing laboratory and office including site preparation and temporary utilities, materials testing laboratory development to include equipment, QA processes, QA manual, and successful lab validation by the US Army Corps of Engineers, Engineering Research and Development Center (ERDC).
Update 12 August 2021: Included Amendment 1 to change the due date for proposals from 28 September 2021 to 14 September 2021
Update 2 September 2021: Included Amendment 2 and questions from offerors.
Update 8 September 2021: Included Amendment 3 and Potential Offeror Questions- revised 8Sep21.
Update #3 ·
Perform Quality Assurance (QA) duties on the construction of a partial-depth barrier wall through approximately 4.5 miles of the Moose Creek Dam (MCD) embankment consisting of soil-cement-bentonite material in North Pole, AK. This contract is to establish a validated material testing laboratory at the MCD Safety Modification project staging area to support field inspections, perform material sampling and perform testing required to independently monitor the soil-cement-bentonite and soils work for the duration of the project. Contractor will supply all labor, equipment and materials to perform the services described herein. The general scope of services to be provided must include, but not limited to, establishment of the physical structure for the QA materials testing laboratory and office including site preparation and temporary utilities, materials testing laboratory development to include equipment, QA processes, QA manual, and successful lab validation by the US Army Corps of Engineers, Engineering Research and Development Center (ERDC).
Update 12 August 2021: Included Amendment 1 to change the due date for proposals from 28 September 2021 to 14 September 2021
Update 2 September 2021: Included Amendment 2 and questions from offerors.
Update #2 ·
Perform Quality Assurance (QA) duties on the construction of a partial-depth barrier wall through approximately 4.5 miles of the Moose Creek Dam (MCD) embankment consisting of soil-cement-bentonite material in North Pole, AK. This contract is to establish a validated material testing laboratory at the MCD Safety Modification project staging area to support field inspections, perform material sampling and perform testing required to independently monitor the soil-cement-bentonite and soils work for the duration of the project. Contractor will supply all labor, equipment and materials to perform the services described herein. The general scope of services to be provided must include, but not limited to, establishment of the physical structure for the QA materials testing laboratory and office including site preparation and temporary utilities, materials testing laboratory development to include equipment, QA processes, QA manual, and successful lab validation by the US Army Corps of Engineers, Engineering Research and Development Center (ERDC).
Update 12 August 2021: Included Amendment 1 to change the due date for proposals from 28 September 2021 to 14 September 2021
Update #1 ·
Perform Quality Assurance (QA) duties on the construction of a partial-depth barrier wall through approximately 4.5 miles of the Moose Creek Dam (MCD) embankment consisting of soil-cement-bentonite material in North Pole, AK. This contract is to establish a validated material testing laboratory at the MCD Safety Modification project staging area to support field inspections, perform material sampling and perform testing required to independently monitor the soil-cement-bentonite and soils work for the duration of the project. Contractor will supply all labor, equipment and materials to perform the services described herein. The general scope of services to be provided must include, but not limited to, establishment of the physical structure for the QA materials testing laboratory and office including site preparation and temporary utilities, materials testing laboratory development to include equipment, QA processes, QA manual, and successful lab validation by the US Army Corps of Engineers, Engineering Research and Development Center (ERDC).
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Quality Assurance Materials Testing Laboratory for the Moose Creek Dam Safety Modification Project North Pole, Alaska | Award Notice | |
| This notice | Solicitation | |
| Quality Assurance Materials Testing Laboratory for the Moose Creek Dam Safety Modification Project North Pole, Alaska | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity