GFI-4.pdf
PDF 62 KB Posted
- Solicitation number
- W911KB21R0053
About this file
This document outlines requirements for a quality assurance materials testing laboratory to support a dam safety modification project. The U.S. Army Corps of Engineers, Engineering District Alaska is soliciting proposals for a contractor to establish a validated materials testing laboratory at the Moose Creek Dam project staging area near North Pole, Alaska. The selected contractor must supply all labor, equipment, and materials to perform quality assurance testing and inspection required to independently monitor the soil-cement-bentonite and soils work for the duration of the project. Specifically, the contractor will be responsible for site preparation and temporary utilities for the laboratory facility, developing the materials testing laboratory to include required equipment and processes, creating a quality assurance manual, and obtaining validation of the laboratory by the U.S. Army Corps of Engineers Engineering Research and Development Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
Driller's Name:
Borehole Logger's Name:
COR(s):
Hole Diameter (in):
Actual Depth of VB Hole (ft)1:
CT #:
AT #:
Depth Min. (ft) Max. (ft) Run QA QC
Top 1/3
Middle 2/3
Bottom 3/3
Date: Date:
Depth: Depth:
OPTV CCTV
Northing:
Bottom of Wall (EL):
Run (ft)
Core Sample Depth (ft.)Core Samples Locations Ranges (ft)
Top of Wall (EL):
Ground Elevation (ft):
Station:
Easting:
Center of Panel, Overlap, or Joint:
Panel Completion Date:
Panel Number(s):
Verification Boring Number:
Mechanical Breaks Depths (ft.)3
Pits, Vugs, Rod drops, Water Loss, Change in drill water color, etc.)
Planned Depth of VB Hole (ft):
Depth to Bottom of Wall (ft):
Depth to Top of Wall (ft):
Descriptions
Decommisioned Date:
Saturation of Borehole
Falling Head Test
End Date, Time, Water Depth (ft):
Start Date, Time, Water Depth (ft):
Start Time:
Easting:Total Vector Deviation: Northing:
RQD Rec.
Drill Time
End Time:
Start Time:
Verification Drilling and Field Permeability Testing QA Form
Automatic Cutoff Wall Reading2:
Manual Cutoff Wall Reading:
Manual Water Depth (top of casing) at End (ft):
Manual Water Depth (top of casing) at Start (ft):
End Date & Time:
Start Date & Time:
End Time:
File details come from the government source that posted it. Updated .