This file is related to a federal pre-solicitation for repair projects on two sections of roadway in Walla Walla, Washington and Umatilla, Oregon. The solicitation number is 69056724B000006 and is being issued by the Department of Transportation Federal Highway Administration for the OR FS ERFO 2020(1)-14(1), Walla Walla South – Umatilla Repairs 2020, Phase 1 project and the WA ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1 project. The pre-solicitation file attached is a 16MB set of project plan drawings. No further details on required products or services, response dates, or pricing terms are provided in the available information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
e (max) =
V =
ADT (2041) =
ADT (2021) =
0.060
20 mph
<100
<100
APPROVED:
DATE
reconstruction and drainage aggregate surfacing, road
Bank stabilization, embankment, FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
Matthew Miller
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
Western Federal Lands Highway Division
Chief of Engineering, R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
N
PROJECT LOCATIONS
for details
See Sheets A.4 and A.5
OR FS ERFO 2020(1)-14(1)
UMATILLA REPAIRS 2020, PHASE 1
WALLA WALLA SOUTH
OREGON
UMATILLA AND UNION COUNTIES
UMATILLA NATIONAL FOREST
LENGTH 0.67 MILES
PENDLETON
Stanton
Helix
Bade
Adams
Athena Bringham Springs
Gibbon
Thornhollow
Duncan Elgin
Looking Glass
Rondowa
Milton- Freewater
F R A N K L I N
U M A T I L L A
McKay
Reservoir
W A L L A W A L L A
C O L U M B I A
G A R F I E L D
A S O T I N
N E Z
P E R C E
L E
W I
S
I D A H O
W A L L O W A
R E C A R E A
N A T I O N A L
C A N Y O N
H E L L ' S
Maxville
Wallowa
Ring
Walla Walla
Dayton
Waitsburg
Dodge
Turner
Eurika
Prescott
126 LEWISTON
Clarkston
Flora
Webb
Waha
00 0 00
Scale in miles
SCALE IN MILES
10 20 3010
PARK
NATIONAL
CASCADES
NORTH
u n d o S t e g u
P
P A
C I F I C
O C
A E
N tS raitof Juan de Fuca
OC
LU
MBIA
R
IV
ER
A S N
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
PARK
NATIONAL
OLYMPIC
N.P.
RAINIER
MOUNT
MON.
NAT'L VOLC.
ST. HELENS
MOUNT
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P A
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K
E R I V
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
20 20
395197
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
OREGON KEY MAP
Grants Pass
MEDFORD
WA ERFO FS UMATL614 2020-1(1)
UMATILLA REPAIRS 2020, PHASE 1
WALLA WALLA NORTH
WASHINGTON
COLUMBIA COUNTY
UMATILLA NATIONAL FOREST
LENGTH 55 FEET
WASHINGTON
OREGON
:3
A
M
M a y
T it le
S h e e t c p w w o r k
\d
\O R
F
S
E R
F O ti tl e .d g n
PROJECT
NUMBER
SHEET
A.1
WA ERFO FS UMATL614 2020-1(1)
OR ERFO 2020(1)-14(1)
PRELIMINARY - NOT FOR CONSTRUCTION
a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D
C p w w o r k d S h e e t
A .2 .d g n
P
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
S H E E T I N D E X
A. GENERAL INFORMATION
B. SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
D. PLAN-PROFILE
E. EROSION CONTROL
F. DRAINAGE
G. TEMPORARY TRAFFIC CONTROL PLAN
H. PERMANENT TRAFFIC CONTROL PLAN
A.1
A.2
A.3
C.6
D.1
E.1
F.1
G.1
G.2
G.3
H.1
H.2
TITLE SHEET
EROSION CONTROL DETAILS
PERMANENT SIGN DETAIL(S) - (NOT INCLUDED)
WORK ZONE DETAILS - (NOT INCLUDED)
INCLUDED)
INFORMATIONAL AND PROJECT LIMIT SIGNING - (NOT
TABULATION OF QUANTITIES - (NOT INCLUDED)
STANDARD DRAWINGS AND DETAILS
F.2-5
F.10-12 AQUATIC ORGANISMS PASSAGE DETAILS
INCLUDED)
PERMANENT PAVEMENT MARKING DETAIL(S) - (NOT
E.2
E.3-8
TABULATION OF QUANTITIES - (NOT INCLUDED)
TABULATION OF QUANTITIES
SURVEY CONTROLD.2
D.3-16
D.17-18 PLAN
PLAN-PROFILE
C.1-5 TYPICAL SECTIONS
SUBEXCAVATION AND BACKFILL
BANK STABILIZATION DETAILSC.7-10
C.11 SPECIAL ROCK EMBANKMENT DETAIL
SECTION PLAN - (NOT INCLUDED)
TABULATION OF QUANTITIES - (NOT INCLUDED)
SUMMARY OF QUANTITIES - (NOT INCLUDED)
F.6-9 (NOT INCLUDED)
VICINITY MAP(S)
STAGING AREA(S)A.6-8
A.4-5
PLAN SYMBOLS AND ABBREVIATIONS
SHEET INDEX
B.1-2
WA
OR
ERFO FS UMATL614 2020-1(1)
FS ERFO 2020(1)-14(1)
SHEET INDEXPRELIMINARY - N
OT FOR CONSTRUCTION
BH
TP
EL. 1234.56
BH
TP
EL. 1234.56
W west
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
E e
El. 94.16 ft elev.
emb.
EP
EQ or eq.
ER
EW
exc.
exp. jt.
east superelevation rate elevation with number elevation embankment edge of pavement equation edge of road edge of water excavation expansion joint diameter design hourly volume diameter diagonal diaphragm distance drawing(s) ga.
galv.
gage (gauge) galvanized hdwl.
hex.
HW
headwall hexagon high water fin.
flg.
ft2 ft3 ftg.
finish flange square foot cubic foot (feet) footing
ID
jt.
inside diameter joint
L lam.
lat.
LNFT
long.
LPSM
Ls
lt. or LT
LW
length of curve lamination latitude linear foot (feet) longitudinal lump sum length of spiral left low water
N
NC
north normal crown
o. c.
o. to o.
OD
OG
on center out to out outside diameter original ground
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement
R
R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway reinforcement required right route
T
T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection yd2 yd3 square yard cubic yard(s)
S
SADT
SC
sec.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
SS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
sym.
south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical
CUFT
culv.
CUYD
cubic foot (feet) culvert cubic yard(s) matl.
max.
MGAL
min.
mon.
material maximum thousand gallon minimum monument
CP GPS
JH
36 31
6 1
36 31
6 1
SEC.
SEC.
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
1.
Property Line w/Found Property Corner
16 Section Corner (Found, Projected)
16 Section Line
4 Section Corner (Found, Projected)
4 Section Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
∆c Ø θs total central angle curve central angle diameter spiral central angle abutment average daily traffic ahead approach abut.
ADT
AH
appr.
back bench mark balance point bridge bearing
BK
BM
BP
br.
brg.
cc or c. to c.
clr.
CMP
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers main line mile post
M.L.
M.P.
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, UP = transformer or junction box, WF = water fountain
Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)
- no symbol -
EXISTING PROPOSED
Top of Cut
Toe of Fill
Transition wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
PLAN SYMBOLS
AND ABBREVIATIONS
W west
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
E e El. 94.16 ft elev.
emb.
EP
EQ or eq.
ER
EW
exc.
exp. jt.
east superelevation rate elevation with number elevation embankment edge of pavement equation edge of road edge of water excavation expansion joint diameter design hourly volume diameter diagonal diaphragm distance drawing(s) ga.
galv.
gage (gauge) galvanized hdwl.
hex.
HW
headwall hexagon high water fin.
flg.
ft2 ft3 ftg.
finish flange square foot cubic foot (feet) footing
ID
jt.
inside diameter joint
L lam.
lat.
LNFT
long.
LPSM
Ls
lt. or LT
LW
length of curve lamination latitude linear foot (feet) longitudinal lump sum length of spiral left low water
N
NC
north normal crown
o. c.
o. to o.
OD
OG
on center out to out outside diameter original ground
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement
R R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway reinforcement required right route
T T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection yd2 yd3 square yard cubic yard(s)
S
SADT
SC
sec.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
SS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
sym.
south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical
CUFT
culv.
CUYD
cubic foot (feet) culvert cubic yard(s) matl.
max.
MGAL
min.
mon.
material maximum thousand gallon minimum monument
CP GPS
JH
36 31
6 1
36 31
6 1
SEC.
SEC.
E
RIP
G GW W
DI
T T
NOTE:
NO SCALE
Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
1.
Property Line w/Found Property Corner
16 Section Corner (Found, Projected)
16 Section Line
4 Section Corner (Found, Projected)
4 Section Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
∆c Ø θs total central angle curve central angle diameter spiral central angle abutment average daily traffic ahead approach abut.
ADT
AH
appr.
back bench mark balance point bridge bearing
BK
BM
BP
br.
brg.
cc or c. to c.
clr.
CMP
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers main line mile post
M.L.
M.P.
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, UP = transformer or junction box, WF = water fountain
Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)
- no symbol -
EXISTING PROPOSED
Top of Cut
Toe of Fill
Transition wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
:2 p ri l
D e fa u lt p w
-w o rk
\d \O
R F
S E
R F
O (1
(1 p la n s y m b o ls
.d g n
STATE PROJECT
NUMBER
SHEET
A.2ERFO FS UMATL614 2020-1(1)WA
Roughened Toe Riprap
DIDI
:2 p ri l
D e fa u lt p w
-w o rk \d
\O
R
F S
E
R F
O
(1
(1 p la n s y m b o ls .d g n
PROJECT
OR FS ERFO 2020(1)-14(1)
A.3
PRELIMINARY - N
a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer
SCALE IN MILES
1 32 41 yr d n u o B n oit a vr e s e R n ai d nI alliti m
U
Bingham Springs
Umitilla River
Bar M Ranch
Guard Station
Corporation
Campground
Umatilla Forks
F
N
Gibbon
Meachan Creek Rd
To Pen dle ton
App rox . 30 .5 m iles A p p r o x . 3 m ile s
T o E lg in
South Fork Umatilla River
NF-31
FS 3200 MP 1.26
FS 3200 MP 1.30 - 1.36
FS 3200 MP 1.38 - 1.44
FS 3200 MP 1.52 - 1.69
FS 3200 MP 1.96 - 2.00
FS 3200 MP 2.02 - 2.14
FS 3200 MP 2.54
FS 3200 MP 3.08
FS 3200 MP 3.23FS 3200 MP 3.53
FS 3200 MP 4.87
FS 3200 MP 5.58
FS 3200 MP 6.00
FS 3738 MP 8.35
See sheet A.7
Staging Area
Andies Prairie
See sheet A.8
Sundance Pit
See sheet A.6
Ruckle Pit
See sheet A.6
Secure Staging Area
WILDERNESS
UMATILLA
NATIONAL FOREST
UMATILLA
OREGON PROJECT SITES
:2
M a y
V ic in it y M a p
O F p w w o r k \d
\O
R F
S E
R F
O V ic in it y m a p .d g n
SITES
VICINITY MAP - OREGON PROJECT
PROJECT
A.4 a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
GARFIELD CO
COLUMBIA CO
NF-4620
NFD RD 050
Little Tucannon River
Cow Canyon
Watson Lake Mountian Rd
Maloney
Skyline Rd
Kendall
N F
N F -4
N
To Dayton Approx. 25 m iles dR titaP
Campground
Panjab
Campground
Ladybug to B lu e w o o d
C o w C a n y o n
SCALE IN MILES
2 1 1 3
Tucannon Rd
N F-
FS 4712 MP 0.87FS 4713 MP 0.55
River Tucannon
Panjab Creek
WILDERNESS
UMATILLA
NATIONAL FOREST
UMATILLA
C O
L U
M B
IA
C
O
G A
R F
IE
L
D
O
[1]
:3
M a y
V ic in it y M a p
O F p w w o r k \d
\O
R F
S E
R F
O V ic in it y m a p .d g n
PROJECT SITES
VICINITY MAP - WASHINGTON
PROJECT
A.5
Secured Staging Area
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
Ruckle Pit
:4
M a y
S e c u r e S ta g in g A r e a a n d R u c k le
P it
M a te r ia l S o u r p w w o r k
\d
\o r e f s ta g in g
.d g n
RUCKLE PIT MATERIAL SOURCE
SECURED STAGING AREA AND
PROJECT
A.6
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer
Completed set by a.rosemanhanauer
Andies Prairie Staging Area
:4
M a y
A n d ie s P r a ir ie S ta g in
A r a p w w o r k
\d
\o r e f s ta g in g
.d g n
ANDIES PRAIRIE STAGING AREA
PROJECT
A.7
Sundance pit
:2
S e p te m b e r
B a s e .B
.U
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
SUNDANCE PIT MATERIAL SOURCE
PROJECT
A.8
LC
grade.
match existing profile
Finished grade to
Unclassified borrow
Umatilla River
LC
Existing roadway
Existing ground
See Bank Stabilization Details
2'2'
Shoulder
Shoulder
Travel way
C o n s tr u c ti o n L im it
Variable
L im it
C o n s tr u c ti o n
1:4
Existing Ground
2%
1300+00 - 1301+34
FS 3200 MP 1.26
FS 3200 MP 4.87
FS 3200 MP 5.58
FS 3200 MP 6.00
100+00 - 101+63
1100+00 - 1101+77
1200+00 - 1201+93
1:4
1.5:1
Remove debris
14'
4'
2-inch compacted depth
Roadway aggregate, method 1, 2%
FS 3200 MP 1.30 - 1.36
2'2'
Shoulder
Shoulder
Travel way
C o n s tr u c ti o n
L im it
Variable
L im it
C o n s tr u c ti o n
1:4
2-inch compacted depth
Roadway aggregate, method 1, 2%2%
FS 3200 MP 1.38 - 1.44
200+00 - 201+98
300+00 - 303+36
14'
4'
NO SCALE
:0
M a y
T y p ic a l
S e c ti o n s o f p w w o r k \d
\O
R F
S E
R F
O p ln ty p .d g n
SHEET 1 OF 5
TYPICAL SECTIONS
PROJECT
C.1
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
Rejected set by a.rosemanhanauer
Umatilla River
Existing Ground profile grade
Finish grade to match existing
See Bank Stabilization Details
Umatilla River
LC
Existing Ground
Profile grade
See Bank Stabilization Details
FS 3200 MP 1.52 - 1.69
2'2'
Shoulder Shoulder
C o n s tr u c ti o n L im it
Variable L im it
C o n s tr u c ti o n
1:4
2%2%
400+00 - 451+85
Unclassified borrow
4'
14'
Travel way
2-inch compacted depth
Roadway aggregate, method 1, FS 3200 MP 1.96 - 2.00
3'3'
Shoulder
Shoulder
C o n s tr u c ti o n L im it
Variable
L im it
C o n s tr u c ti o
1:4
2%2%
FS 3200 MP 3.53
1000+00 - 1002+58
500+00 - 501+65 800+00 - 802+00
Unclassified borrow
600+00 - 606+54
FS 3200 MP 2.02 - 2.14
4'
FS 3200 MP 3.08
14'
Travel way
2-inch compacted depth
Roadway aggregate, method 1, NO SCALE
:2
M a y
T y p ic a l
S e c ti o n s o p w w o r k
\d
\O R
F
S
E R
F O p ln ty p .d g n
SHEET 2 OF 5
TYPICAL SECTIONS
PROJECT
C.2 a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer
Umatilla River
Existing Ground
Profile grade
See Bank Stabilization Details FS 3200 MP 3.23
2'2'
Shoulder
Shoulder
C o n s tr u c ti o n L im it
Variable L im it
C o n s tr u c ti
1:4
1:
1.
2%2%
900+00 - 901+75
Unclassified borrow
Variable
14'
Travel way
2-inch compacted depth
Roadway aggregate, method 1, NO SCALE
:0
M a y
T y p ic a l
S e c ti o n s o p w w o r k
\d
\O R
F
S
E R
F O p ln ty p .d g n
SHEET 3 OF 5
TYPICAL SECTIONS
PROJECT
C.3
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
Profile grade. See Sheet D.10
Install AOP culvert. See Sheet F.10.
:1 .7
AND BACKFILL" detail on Sheet C.6
See "3738 MP 8.38 SUBEXCAVATION
LC
Finish grade to match existing profile grade
FS 3200 MP 2.54
2'2'
Shoulder
Shoulder
Travel way
L im it
C o n s tr u c ti n s tr u c ti o n
L im it
1:4
Existing Ground
Variable
1:
1.
2%2%
1:4
1:1
Variable
700+00 - 704+99
Unclassified borrow
14'
2-inch compacted depth
Roadway aggregate, method 1, 2' 2'
4'
FS 3738 MP 8.35
15' Travel way
Existing Ground
C o n s tr u c ti o n
L im it
Variable
C o n s tr u c ti o n
L im it
Variable
1:4
1:
1.
2%2%
300+00 - 300+50
ShoulderShoulder
2-inch compacted depth
Roadway aggregate, method 1, NO SCALE
:2
M a y
T y p ic a l
S e c ti o n s o p w w o r k
\d
\O R
F
S
E R
F O p ln ty p .d g n
SHEET 4 OF 5
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
C.4 a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer Sticky Note Rejected set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
3-inch compacted depth
Roadway aggregate, method 1, compacted depth
Unclassified borrow, 12-inch minimum
See Special Rock Embankment Details
LC
4% Crown 4% Crown
See Special Rock Embankment Details
NO SCALE
Existing ground
4% Crown 4% Crown
Profile grade
Traveled lane
8'
Traveled lane
8'
FS 4713 MP 0.55
C o n s tr u c ti o n l im it
10'
C o n s tr u c ti o n l im it
10'
Existing ground
Profile grade
Traveled lane
7'
Traveled lane
7'
FS 4712 MP 0.87
compacted depth
Unclassified borrow, 12-inch minimum
3-inch compacted depth
Roadway aggregate, method 1, C o n s tr u c ti o n l im it
10'
C o n s tr u c ti o n l im it
10'
:2
M a y
T y p ic a l
S e c ti p w w o r k
\d
\w a e f u m a tl c a .d g n
SHEET 5 OF 5
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
C.5 a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
NOTE:
4.
3.
2.
1.
C o ll e c to r p ip e
PLAN VIEW
DEEP PATCH AREA
D e e p p a tc h l im it
D e e p p a tc h l im it or Outlet pipe
D it c h li n e
P r o f il e g r a d e
Deep patch trench
COLLECTOR AND OUTLET PLAN
DEEP PATCH AND BACKFILL
COLLECTOR AND OUTLET PIPE DETAIL
0.5% (min.)
point of the deep patch.
Slope all Outlet Pipes a minimum of 0.5% to drain at the low
All drainage work associated with the deep patch is subsidary.
100-foot spacing.
Provide solid outlet pipes at all low points and at maximum
Staking Report Data Listing.
Construct slope across bottom of deep patch as shown in the
:1
1:1.75 1:
Select borrow
1:1.75
LC
d e p th S u b e x c a v a ti o nExisting ground
Trench Detail below
See Subexcavation against cut and under subexcavation geotextile, class 1, type B (woven), Separation-stabilization
4713 MP 0.55
4712 MP 0.87
SUBEXCAVATION BACKFILL
SUBEXCAVATION TRENCH DETAIL
Bottom of subexcavation
18" geotextile, class 1, type B (woven)
Separation-stabilization
Stabilization geogrid
0.5% (min.)
6" collector pipe
6" outlet pipe
6" outlet pipe
.5 m in per Section 703.03
Granular backfill geogrid at 9" vertical spacing (typ.)
Subsequent layers, place stablilization at 12" vertical spacing (typ.)geogrid
1st and 2nd layer of stabilization
:2
J a n u a r y
S u b e x c a v a ti o n a n d B a c k f il l p w w o r k
\d
\o r e f s u b e x
.d g n
SUBEXCAVATION AND BACKFILL
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
C.6 a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
Completed set by a.rosemanhanauer
SECTION A-A
BANK STABILIZATION DETAIL "A"
streambed material
Place conserved
[2] Cuttings, willow pole
Water table
Control Point
Riprap Top
Control Point
Riprap Toe
1.5:1
:1
Placed riprap, method B, Class 6
LC
Unclassified borrow class 1, type B, nonwoven
Geotextile filter, Existing ground
2-yr WSE
100-yr WSE
Roughened toe, boulder clusters
Channel Width (Varies)
[3] Seeding and mulching, hydraulic method the finish grade.
the water table. Leave a minimum of 1' of pole plantings exposed above between logs. Embed ends of pole plantings a minimum of 1' below
Pole Planting: Willow live cutting bundles, random spacing 9 per SQYD[2] flow from bank line.
Maximize trunk embedment, but allow the rootwad end to project into[1]
FOOTNOTE:
amendment and tackifier.
of native seed, mulch, compost, fertilizer, biotic soil
Seeding and mulching consists of hydraulic application[3]
NOT TO SCALE
200+14 to 201+98
FS 3200 MP 1.30 - 1.36
0+40 to 400+7040
FS 3200 MP 1.52 - 1.69
300+20 to 303+40
FS 3200 MP 1.38 - 1.44
00+00 to 602+406
FS 3200 MP 2.02 - 2.14
00+20 to 901+299
FS 3200 MP 3.23
:2
S e p te m b e r
B a s e .B
.M
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
BANK STABILIZATION DETAIL A
PROJECT
NUMBER
C.7
WA ERFO FS EMATL614 2020-1(1)
BANK STABILIZATION DETAIL "B"
streambed material
Place conserved
[1] Mitigation, root wad
Mitigation, log barrier
[2] Cuttings, willow pole
Water table
Control Point
Riprap Top
Control Point
Riprap Toe
1.5:1
:1
Placed riprap, method B, Class 6
LC
Unclassified borrow class 1, type B, nonwoven
Geotextile filter, to log barrier with rebar
Pin mitigation root wad
Existing ground
100-yr WSE
2-yr WSE
Channel Width (Varies)
[3] Seeding and mulching, hydraulic method
FOOTNOTE:
the finish grade.
the water table. Leave a minimum of 1' of pole plantings exposed above between logs. Embed ends of pole plantings a minimum of 1' below
Pole Planting: Willow live cutting bundles, random spacing 9 per SQYD[2] flow from bank line.
Maximize trunk embedment, but allow the rootwad end to project into[1] amendment and tackifier.
of native seed, mulch, compost, fertilizer, biotic soil
Seeding and mulching consists of hydraulic application[3]
NOT TO SCALE
303+15 to 303+35
300+00 to 300+20
FS 3200 MP 1.38 - 1.44
400+70 to 402+07
FS 3200 MP 1.52 - 1.69
:2
S e p te m b e r
B a s e
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
BANK STABILIZATION DETAIL B
PROJECT
NUMBER
C.8
1.5:1
Water table
Placed riprap, method B, Class 6
1.5:1
:1
Unclassified borrow
Existing ground
Placed riprap, method B, Class 5 class 1, type B, nonwoven
Geotextile filter, Mitigation, log barrier
SECTION A-A
[3] Untreated timber pole
Control Point
Riprap Toe
2-yr WSE
100-yr WSE
[1] Mitigation, root wad pole and log barrier with rebar
Pin mitigation root wad to timber streambed material
Place conserved
[2] Cuttings, willow pole
Control Point
Riprap Top
:1
BANK STABILIZATION DETAIL "C"
Channel Width (Varies)Vegetated Floodplain Bench (Varies)
[4] Seeding and mulching, hydraulic method for details
See sheets F.6 and F.7
Tree plantings per
Untreated timber pole: Cut conical pile shoe into log pole if required.[3] the finish grade.
the water table. Leave a minimum of 1' of pole plantings exposed above between logs. Embed ends of pole plantings a minimum of 1' below
Pole Planting: Willow live cutting bundles, random spacing 9 per SQYD[2] flow from bank line.
Maximize trunk embedment, but allow the rootwad end to project into[1]
FOOTNOTE:
amendment and tackifier.
of native seed, mulch, compost, fertilizer, biotic soil
Seeding and mulching consists of hydraulic application[4]
450+00 to 451+85
FS 3200 MP 1.52 - 1.69
603+60 to 606+00
02+40 to 603+006
FS 3200 MP 2.02 - 2.14
500+00 to 501+65
FS 3200 MP 1.96 - 2.00
01+29 to 901+959
FS 3200 MP 3.23
000+00 to 1002+491
FS 3200 MP 3.53
NOT TO SCALE
:2
S e p te m b e r
B a s e
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
BANK STABILIZATION DETAIL C
PROJECT
NUMBER
C.9
Water table
LC
Unclassified borrow
Existing ground
100-yr WSE
2-yr WSE
BANK STABILIZATION LOG JAM DETAIL "D"
1.5:1
Existing ground deflector rootwad (typ.)Mitigation, [2] Cuttings, willow pole streambed material
Place conserved deflector log (typ.)Mitigation, pole and log barrier with rebar
Pin mitigation root was to timber
[3] Untreated timber pole
Place course woody debris (min. 1' over logs)
Vegetated Upland Bench/Log Jam (Varies) Channel Width (Varies)
Control Point
Riprap Top
Placed riprap, method B, Class 6 class 1, type B, nonwoven
Geotextile filter, for details
See sheets F.6 and F.7
Tree plantings per
[4] Hydraulic method
Seeding and mulching, FOOTNOTE:
the finish grade.
the water table. Leave a minimum of 1' of pole plantings exposed above between logs. Embed ends of pole plantings a minimum of 1' below
Pole Planting: Willow live cutting bundles, random spacing 9 per SQYD[2] flow from bank line.
Maximize trunk embedment, but allow the rootwad end to project into[1] Untreated timber pole: Cut conical pile shoe into log pole if required.[3] amendment and tackifier.
of native seed, mulch, compost, fertilizer, biotic soil
Seeding and mulching consists of hydraulic application[4]
NOT TO SCALE
606+00 to 606+54
03+00 to 603+606
FS 3200 MP 2.02 - 2.14
499+48 to 500+00
FS 3200 MP 1.96 - 2.00
00+50 to 900+208
FS 3200 MP 3.23
002+40 to 1002+581
FS 3200 MP 3.53
200+00 to 200+14
FS 3200 MP 1.30 - 1.36
451+85 to 452+25
400+00 to 400+40
FS 3200 MP 1.52 - 1.69
801+50 to 802+00
99+79 to 800+307
FS 3200 MP 3.08
:2
S e p te m b e r
B a s e
U s e rs
\S te p h e n
.C h a p m a n
\O n e D ri v e
D O
T O
S T
\C A
D D
\c e ll s \F
L H
-C e ll s .c e l
BANK STABILIZATION DETAIL D
PROJECT
NUMBER
C.10
FOOTNOTE:
Assumed temporary cut slope ratio. Adjust slope ratio based on site conditions and safety needs.
NO SCALE
LC
V :1 .2
H ty p
1.25 minimum compacted depth
Unclassified borrow, 12-inch
(min.)
4' class 1, type A (non-woven)
Geotextile filter, 1:2 mechanically-placed
Special rock embankment, structure excavation
Limit of
SPECIAL ROCK EMBANKMENT SECTION
FS 4713 MP 0.55
FS 4712 MP 0.87
(min.)
4'
Top of subgrade
1.25
:2
M a y id e f c f .d g p w
-w o rk \d
\W
A
E F
U
M A
T L
-1 (1 d d .d g n
DETAIL
SPECIAL ROCK EMBANKMENT
PROJECT
NUMBER
SHEET
WA ERFO FS EMATL614 2020-1(1)
C.11 a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer a.rosemanhanauer
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
21101 757552.176 8792914.238 2463.792 5/8" ir w/fhwa alum cap 21401 750099.502 8788333.830 2379.876 5/8" ir w/fhwa alum cap
21102 757436.306 8792586.750 2467.420 5/8" ir w/fhwa alum cap 21402 749898.377 8788283.655 2382.077 5/8" ir w/fhwa alum cap
21103 757232.897 8792470.840 2471.029 5/8" ir w/fhwa alum cap 21403 749615.834 8788184.532 2385.836 5/8" ir w/fhwa alum cap
21104 757074.168 8792417.840 2480.288 H&T 21404 749411.308 8788201.722 2392.019 5/8" ir w/fhwa alum cap
21105 756763.531 8792358.802 2474.129 PK nail 21405 749022.068 8788293.401 2397.326 5/8" ir w/fhwa alum cap
21106 756523.579 8792283.355 2476.324 H&T 21406 748703.254 8788212.156 2400.252 5/8" ir w/fhwa alum cap
21107 756154.751 8792168.478 2484.293 PK nail 21407 748469.698 8788119.102 2401.054 5/8" ir w/fhwa alum cap
21108 755861.463 8792142.833 2493.624 5/8" ir w/fhwa alum cap
21109 755724.434 8792136.356 2494.227 5/8" ir w/fhwa alum cap 21501 747952.093 8788339.175 2622.237 5/8" IR W/FHWA ALUM CAP
21110 755666.646 8791970.828 2493.635 H&T 21502 747792.289 8788336.387 2621.988 5/8" IR W/FHWA ALUM CAP
21111 755561.345 8791813.380 2495.478 H&T 21503 747501.002 8788189.089 2624.137 5/8" IR W/FHWA ALUM CAP
21112 755317.670 8791689.556 2498.678 5/8" ir w/fhwa alum cap 21504 747304.859 8788215.212 2627.417 5/8" IR W/FHWA ALUM CAP
21113 755046.324 8791582.474 2508.003 5/8" ir w/fhwa alum cap
FORKS1 757554.788 8792764.600 2462.149 3" alum cap 21601 742221.836 8790919.244 2756.520 5/8" IR W/FHWA ALUM CAP
21602 742070.421 8790935.159 2757.637 5/8" IR W/FHWA ALUM CAP
21201 754717.073 8790563.647 2469.781 5/8" ir w/fhwa alum cap 21603 741865.824 8790980.383 2765.580 5/8" IR W/FHWA ALUM CAP
21202 754499.560 8790452.819 2477.147 5/8" ir w/fhwa alum cap
21203 754441.114 8790228.690 2481.680 H&T 21697 740641.248 8793756.855 2893.213 5/8" IR W/FHWA ALUM CAP
21204 754459.127 8789954.498 2484.754 H&T 21698 740513.291 8793884.815 2888.424 5/8" IR W/FHWA ALUM CAP
21205 754241.937 8789528.850 2499.044 PK Nail 21699 740388.086 8794051.016 2888.144 5/8" IR W/FHWA ALUM CAP
21206 754113.410 8789455.758 2501.799 5/8" ir w/fhwa alum cap 21700 740238.432 8794201.864 2894.720 5/8" IR W/FHWA ALUM CAP
21207 753866.753 8789348.899 2496.779 5/8" ir w/fhwa alum cap
21701 739475.262 8795565.327 2925.019 5/8" IR W/FHWA ALUM CAP
21301 752853.417 8788685.263 2550.911 5/8" ir w/fhwa alum cap 21702 739337.770 8795644.717 2931.290 5/8" IR W/FHWA ALUM CAP
21302 752687.403 8788729.747 2552.145 5/8" ir w/fhwa alum cap 21703 739169.144 8795745.128 2937.441 5/8" IR W/FHWA ALUM CAP
21303 752452.124 8788838.591 2560.211 5/8" ir w/fhwa alum cap 21704 738966.748 8795837.265 2949.824 5/8" IR W/FHWA ALUM CAP
21304 752069.090 8789030.836 2588.570 5/8" ir w/fhwa alum cap
21305 751875.760 8788903.378 2603.347 5/8" ir w/fhwa alum cap
MP 1.26-1.69
MP 1.96-2.14
MP 3.08-3.23
MP 2.54
MP 6.87
MP 5.5
MP 4.87
MP 3.53
PROJECT : Walla Walla South-Umatilla Repairs 2020 phase 1 DATE OF FIELD WORK : Spetember/October 2021
PROJECT UNITS : International foot COORDINATE SYSTEM : Assumed VERTICAL DATUM : Assumed
PROJECT COORDINATES PROJECT COORDINATES
C
M yF ile s\
Pr oj ec ts
_2
1\ O re go n\ U m at ill a_
ER
FO
\p w
O
R _F
S_
ER
FO
_2
0(
1) -1
4( 1)
_c on tr ol sh ee t_ 2.
xl sx
]S he et 1-
M ar
-2
:5
A M
W
FL
H D
S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.2
SHEET
NUMBER
FS ERFO 2020(1)-14(1)OR
SURVEY CONTROL
P 2
I
R W F
H W
A A
L U
M C
A P
N
Edges of aggregate "MAIN01" Line to be constructed
Existing ground
Profile grade
BEGIN WORK SITE
END WORK SITE
e = ___
'163.00L =
'81.63T =
'1,200.00R =
(LT)07°46'58"Δ =
100+81.63PI
.0
T
99+50 100+00 100+50 101+00 101+50
2,474 2,474
2,476 2,476
2,478 2,478
2,480 2,480
+3.00
-1.59%
.1
.6
' VC140
31K =
'305SSD =
,4
.7
,4
.8
MP 1.26 100+00
MP 1.26 101+63
:3
M a y
M
A
IN
P la n
S h e t] p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 1.26
PLAN AND PROFILE
PROJECT
NUMBER
D.3
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
"MAIN02" Line to be constructedEdges of aggregate
Profile grade
Existing ground
BEGIN WORK SITE
END WORK SITE
S05°1 5'05"
W
S23°10'27"W e = ___
'109.48L =
'55.19T =
'350.00R =
(RT)17°55'22"Δ =
200+68.89PI
e = ___ '6.74L = '3.37T =
'1,000.00R =
(LT)00°23'11"Δ =
201+94.63PI
.2
.6
.1
0 2
199+50 200+00 200+50 201+00 201+50
2,470 2,470
2,472 2,472
2,474 2,474
2,476 2,476
-0.43% +1.41%
-0.43%
+1.41%
.8
.3
L
' VC25
14K =
'2380HLSD =
,4
.3
,4
.7
MP 1.30-1.36 200+00
MP 1.30-1.36 201+98
:3
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 1.30-1.36
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.4 a.rosemanhanauer
"MAIN03" Line to be constructed Edges of aggregate
Existing ground
Profile grade
BEGIN WORK SITE
END WORK SITE
S12°55'42"W S26°14'42"W S10°54'32"W e = ___
'46.48L =
'23.35T =
'200.00R =
(RT)13°19'00"Δ =
301+33.67PI
e = ___ '40.15L = '20.20T = '150.00R =
(LT)15°20'09"Δ =
301+81.58PI
.3
.5
PC
.8
299+50 300+00 300+50 301+00 301+50 302+00 302+50 303+00
2,474 2,474
2,476 2,476
2,478 2,478
2,480 2,480
2,482 2,482
2,484 2,484
2,486 2,486
2,488 2,488
2,490 2,490
+2.10%
+2.10%
+3.7 3%
.0
.0
' VC20
12K =
'INFHLSD =
,4
.9
,4
.7
MP 1.38-1.44 300+00
MP 1.38-1.44 303+36
:2
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 1.38-1.44
PLAN AND PROFILE
PROJECT
D.5
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
I
R W F
H W
A A
L U
M C
A P
N
"MAIN04.5" Line to be constructed
Edges of aggregate
Existing ground
Profile grade
BEGIN WORK SITE
END WORK SITE
S32°37'59"W
S05° 14'47
"W e = ___
'129.06L =
'65.79T =
'270.00R =
(LT)27°23'12"Δ =
450+71.81PI
449+50 450+00 450+50 451+00 451+50
2,500 2,500
2,502 2,502
2,504 2,504
2,506 2,506
+3.6 3%
+3.6 3%
,5
.6
,5
.3
MP 1.69 450+00
MP 1.69 451+85
:3
M a y
M
A
IN
.5
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 1.69
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.7 a.rosemanhanauer
CP
5/8
" IR
W/
FHWA A
LUM C
AP
CP
H&T
N
"MAIN05" Line to be constructed
Edges of aggregate
Profile grade
Profile grade
BEGIN WORK SITE
END WORK SITE
S81°26'34"W
S81°26'34"W e = ___
'63.11L =
'31.92T =
'170.00R =
(RT)21°16'16"Δ =
500+31.92PI
e = ___ '50.45L = '25.23T = '1,000.00R =
(RT)02°53'26"Δ =
501+39.78PI
.1
C
499+50 500+00 500+50 501+00 501+50
2,476 2,476
2,478 2,478
2,480 2,480
2,482 2,482
+2.40
+1.10%
+2.40
.0
.0
' VC50
38K =
'855SSD =
,4
.1
,4
.4
MP 1.96-2.00 500+00
MP 1.96-2.00 501+65
:4
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 1.96-2.00
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.8 a.rosemanhanauer a.rosemanhanauer Sticky Note Accepted set by a.rosemanhanauer a.rosemanhanauer
I
R W F
H W
A A
L U
M C
A P
C P 2
I
R W F
H W
A A
L U
M C
A P
N
"MAIN10" Line to be constructed
Edges of aggregate
Profile grade
BEGIN WORK SITE END WORK SITE
S26°26'45"W
S26°26'45"W e = ___
'27.79L =
'14.08T =
'70.00R =
(RT)22°44'33"Δ =
1000+14.08PI
.7
998+50 999+00 999+50 1000+00 1000+50 1001+00 1001+50 1002+00 1002+50
2,614 2,614
2,616 2,616
2,618 2,618
2,620 2,620
2,622 2,622
2,624 2,624
2,626 2,626
2,628 2,628
2,630 2,630
+0.57%
+0.57%2 ,6
.1
,6
.6
MP 3.53 1000+00 MP 3.53 1002+58
:4
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 3.53
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.13
I
R W
F
H W
A A
L U
M C
A P
C P
I
R W
F
H W
A A
L U
M C
A P
N
"MAIN11" Line to be constructed
Edges of aggregate
Existing ground
Profile grade
BEGIN WORK SITE
END WORK SITE
S19°5 9'41"E
S04°00'39"E e = ___
'142.27L =
'71.60T =
'510.00R =
(RT)15°59'01"Δ =
1101+00.94PI
.6
1099+50 1100+00 1100+50 1101+00 1101+50
2,752 2,752
2,754 2,754
2,756 2,756
2,758 2,758
2,760 2,760
+0.70%
+2.25
+0.70%
+2.25
.8
.0
' VC80
52K =
'INFHLSD =
,7
.9
,7
.1
MP 4.87 1100+00
MP 4.87 1101+77
:4
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 4.87
PLAN AND PROFILE
PROJECT
D.14
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
/8
IR
W /F
H W
A A
LU
M C
A P
C P
/8
IR
W /F
H W
A A
LU
M C
A P
N
"MAIN12" Line to be constructed
Edges of aggregate
Profile grade
Existing ground
BEGIN WORK SITE END WORK SITE
S55°11 '29"E
S39°21'16"E
S49°05'05"E e = ___
'27.64L =
'13.91T =
'100.00R =
(RT)15°50'13"Δ =
1200+59.49PI
e = ___ '16.98L = '8.51T = '100.00R =
(LT)09°43'49"Δ =
1201+30.23PI
C 1
PT
.2
1200+00 1200+50 1201+00 1201+50
2,884 2,884
2,886 2,886
2,888 2,888
2,890 2,890
-0.90%
-0.90%
+1.77%
.8
.3
L
' VC90
34K =
'350HLSD =
,8
.0
,8
.9
MP 5.58 1200+00 MP 5.58 1201+93
:4
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 5.58
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.15 a.rosemanhanauer
/8
I
R W /F
H W
A A
L U
M C
A P
C P
/8
I
R W /F
H W
A A
L U
M C
A P
N
"MAIN13" Line to be constructed Edges of aggregate
Existing ground
Profile grade
BEGIN WORK SITE
END WORK SITE
S31°50'51" E S21°27'05"E e = ___
'36.29L =
'18.20T =
'200.00R =
(RT)10°23'47"Δ =
1300+73.94PI
1299+00 1299+50 1300+00 1300+50 1301+00
2,930 2,930
2,932 2,932
2,934 2,934
2,936 2,936
2,938 2,938
+2.10%
+3.2 0%
+2.10%
.1
.0
' VC20
18K =
'989SSD =
,9
.1
,9
.2
MP 6.00 1300+00
MP 6.00 1301+34
:4
M a y
M
A
IN
P la n
S h e p w
-w o rk \d
\o r-e f-
-1
-1
-1 p ln p p .d g n
FS 3200 - MP 6.00
PLAN AND PROFILE
PROJECT
NUMBER
SHEET
WA ERFO FS UMATL614 2020-1(1)
D.16 a.rosemanhanauer
Repair 50' of roadway
BEGIN WORK SITE END WORK SITE
Edges of aggregate
MP 8.35 1400+00 MP 8.35 1400+50
LEGEND:
Adjust to fit field conditions determined by the CO.
1. Site not surveyed. Horizontal alignment is a representation.
Deep Patch
NOTE
:0
M a y
M
A I N
P la n
S h e p w w o r k
\d
\o r e f p ln p p
.d g n
FS 3738 - MP 8.35
PLAN
PROJECT
D.17
Edges of aggregate
Remove and replace existing 36" D x 30' L culvert
Edges of aggregate
BEGIN WORK SITE
BEGIN WORK SITE
END WORK SITE
END WORK SITE
N
N
Repair 25' of roadway
Repair 30' of roadway
Special rock embankment
Legend
Adjust to fit field conditions determined by the CO.
1. Site not surveyed. Horizontal alignment is a representation.
NOTE
FS 4712 MP 0.87 1500+00 FS 4712 MP 0.87 1500+30
FS 4713 MP 0.55 1600+00 FS 4713 MP 0.55 1600+25
:2
M a y
M
P
.8
U p p e r T u c a n n p w
-w o rk
\d \W
A E
F U
M A
T L
-1
(1 p la n s h e e ts
.d g n
FS 4713 - MP 0.55
FS 4712 - MP 0.87
PLAN
PROJECT
D.18
NOTE:
12" min.
DETAIL APPROVED FOR USE 01/2011
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Flow
12" min.
L im it
C le a r in g
S ta k e
S lo p
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
uphill side of fiber roll
Place excavated material on
STATE PROJECT
NUMBER
SHEET
A
M N C
F L D
P I T D r a w in g s F P F P
D e ta il s C .d g n
U s e r A n g e la .J o h n s o n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
AT CULVERT OUTLET
FIBER ROLL
flared end section
Culvert inlet with
AT CULVERT INLET
FIBER ROLL
flared end section
Culvert outlet with Flow
D ire c tio n o f ru n o ff
Flow
FIBER ROLL LAPPING DETAIL
Stagger joints (typ.)
FIBER ROLL JOINT DETAIL
FIBER ROLL SLOPE LAYOUT
spacing table See Fiber Roll along contours
Install fiber rollsWood stakes
Fiber Roll
Slope
Fiber Roll
Pay Limits
Pay Limits overlap 12" (min.)
Fill slope
C157-55 side of fiber roll material on uphill
Place excavated
Flow Flow
54" or larger
Culvert Size
24" or smaller
30" to 48"
9" Ø Fiber Roll length (ft)
FIBER ROLLS AT CULVERTS*
needed due to project-specific conditions.
top of the culvert inlet only. Adjust length as
*Approximate length shown for rolls across the
See note 6 control runoff culvert as needed to
Install fiber rolls below
6.
5.
4.
3.
2.
1.
disturbance.
and all water entering the culvert is crossing the disturbance is on both the road and around the culvert
Place fiber rolls all the way around the inlet when the under it.
water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact
For fiber rolls on bare soil, construct trenches parallel
Expose stakes 2" above top of fiber roll.
Drive stakes into undisturbed soil at least 12" deep.
from each end.
2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and
Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.
section of fiber roll, do not allow the fiber roll to
Install fiber rolls along slope contours. For any 20' to installation.
Repair all rills or gullies and properly compact prior
A A
Trench 2" min.
See no te 3
See no te 3
2" min.
Trench table for length requirements
See Fiber Rolls at Culverts culvert inlet
Install fiber rolls around table for length requirements
See Fiber Rolls at Culverts culvert outlet
Install fiber rolls around
Flow
Fiber roll roll 2" min.
Trench fiber
REVISED: 12/2017
Flow
NO SCALE
1V:4H or flatter
Slope Gradient
1V:2H or steeper
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
Between 1V:4H and 1V:3H
Between 1V:3H and 1V:2H
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
1.
Step 1: Excavate trench Step 2: Install bales
(plan view of bales)
Step 3: Tightly pack straw between bales Step 4: Backfill soil against bales
Varies
Varies packed between bales
Loose straw tightly
PLAN
ELEVATION
Flow
PLANELEVATION
PROPERLY STAKED AND ENTRENCHED STRAW BALES
BALE BARRIER AT TOE OF FILL
INSTALLATION OF A STRAW
Direction of runof f from distur bed area s is placed horizontal that string binding
Orient bale so each other or overlapping bales tightly abutting with ends of adjacent
Install bales in trenches the previously placed bale.
point of first stake towards least 2 stakes. Angle the
Secure each bale with at
Existing ground (typ.)
Backfilled and compacted soil water from flowing around the barrier
Provide sufficient length to prevent straw bale
Stake and entrenchpreviously placed bale
Angle stake towards from disturbed areas
T o e o f s lo p e
Butt bales together
Existing ground
Limits of clearing
Fi ll slo pe
Direction of Runoff
Runoff
See Note 1
INSTALLATION OF A STRAW BALE BARRIER IN DITCH
157-3
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
U.S. DEPARTMENT OF TRANSPORTATION
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
STRAW BALES
Bale width + 2" 12" min.
4"
NOTE:
conditions and when specified on the Erosion Control Plans.
Use straw bales in drainage ditches only for low flow
Overlap edges with at least 2 stakes
Secure each bale
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer stones from embankment fill material.
Remove vegetative matter, other organic material, and large mat before constructing Sediment Trap.
Clear, grub, and remove all vegetative matter including root
SEDIMENT TRAP (TYPE B) PIPE OUTLET
SEDIMENT TRAP (TYPE A) RIPRAP OUTLET
ELEVATION
CROSS SECTION
WITH SLIT PERFORATIONS IN RISER
CONCRETE BASE
WITH HOLE PERFORATIONS IN RISER
STEEL PLATE BASE
CROSS SECTION THROUGH SPILLWAY
2 1
Barrel
BarrelBarrel
Geotextile
Geotextile wrapped with geotextile hardware cloth wire then been stabilized against erosion.
grading and seeding when the upslope drainage area has
Remove the Sediment Trap and stabilize the location by
Make repairs as required.
accumulated sediment and especially after each storm event.
Inspect Sediment Trap regularly for damage and sediment reaches half the design water storage of the trap.
Remove sediment from Sediment Trap when accumulated or permanent vegetation within 7 days of construction.
Seed the soil embankment and all cut slopes with temporary equipment for compaction of each layer.
waterlight connection
Continuous weld
2 1
"dry" storage
Embankment
Concrete or tamped earth
Stone, gravel, Sediment cleanout point
157-4
REVISED:
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SEDIMENT TRAP
Compact embankment in 8-inch layers using construction
Do not use sediment traps for drainage areas over 5 acres.
min.
4' m a x min.
3' m a x min.
4'
12" Freeboard min.
4' m a x
12" Freeboard
67 cubic yards/acre ''dry'' storage
67 cubic yards/acre ''wet'' storage
"2 1" to 4
1Riser wrapped with
(min.)
6" typ.
6" min.
" x 6" slits2
6" min. (typ.)
6" min.
m in min.
12"
9" min.
6" min. (typ.)
6" min.
6" min.
(min.)
6" typ.
" steel plate (min.)4
67 cubic yards/acre ''wet'' storage
67 cubic yards/acre
Min. 24" + diameter
1" Ø hole
NOTE:
8.
7.
6.
5.
4.
3.
2.
1.
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
5.
4.
3.
2.
1.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
using one of the methods listed in Subsection 204.11(a).
temporary culvert. Compact temporary culvert backfill channel through the roadway embankment with
When specified replace the portion of the diversion liner. Bury the upstream edge of the liner a minimum of
Do not construct with longitudinal joints if using a plastic
Construct channel at a minimum grade of 0.5 percent.
width of the temporary diversion channel.
Use plastic liner or riprap along the entire length and diameter, riprap class, channel dimensions and quantities.
See Erosion Control Section for temporary culvert
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
STATE PROJECT
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
DIVERSION CHANNELS
TEMPORARY
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
(S)
CHECK DAM SPACING
DITCHV DITCH
TRAPEZOIDAL DITCH
PROFILE VIEWCROSS SECTION
CROSS SECTION
SPACING
CHECK DAM
6%
5%
4%
3%
2%
2% or above 6% ditch grades.
* Do not use Check Dams below
(G)
GRADE
DITCH*
Class 1 riprap
Class 1 riprap
1V:1.2H (typ.)
Ponded water
Class 1 riprap
:2 ty p.
DITCH GRADE (G)
157-6
REVISED: 6/2007
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
CHECK DAM
S (ft)
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
6.
5.
4.
3.
2.
SLOPE DRAINS
WATERWAY
PLASTIC LINED
TOE-OF-FILL SLOPE BERM
CUT SLOPE BERM
PLAN PLAN
SECTION C-C
SECTION B-BSECTION A-A
FLOW
FLOW
FLOW
Berm at top of fill slope
FLOW FLOW
Berm at top of fill slope
Toe of slopeToe of slope
FLOW
FLOW
B
B
CC
A
A
Graded roadbed Graded roadbed
FLOW
Slope drain may be end dumped
Temporary riprap may be end dumped
Temporary riprap
End section temporary riprap stabilized area or on
Discharge in drainage ditch, to direct into end section contain surface drainage and
Berm, length as required to temporary riprap stabilized area or on
Discharge in drainage ditch, End section to direct into end section contain surface drainage and
Berm, length as required to
Fill slope
Flow line
Original ground
Slope rounding
Cut slope
Berm
Roadway
(See Note 3)
Plastic liner
Fill slope
Waterway
Berm
Original ground
Silt fence
(when required)
Toe of fill ditch compacted with wheel or track (typ.)
Plastic liner or riprap protected slopeflexible tubing
Berm
157-7
REVISED:
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
or as directed
5' ± radius or as directed
5' ± radius m in
9" min.
Temporary 1' Ø
Berm, 4' width x 2' height, m in m in min.
6"
2' min.
AND LINED WATERWAYS
BERMS, SLOPE DRAINS,
TEMPORARY EROSION CONTROL
NOTE:
Use Class 2 temporary riprap.
immediately after berm construction.
Seed and mulch all cut slope berms and toe-of-fill berms from disturbed areas.
Use toe-of-fill slope berms to divert offsite runoff away
Plastic liner is not required for rock embankments.
Do not use transverse or longitudinal joints in plastic liner.
runoff velocity when existing grades are steep.
designated by the CO. Use check dams to reduce the slopes as shown on the Erosion Control Plans or as
Construct temporary berms at the top of all erodible cut
Use slope drains until the slopes are permanently stabilized.
Place all slope drains at the end of each work shift.
on the Erosion Control Plans or as designated by the CO.
the embankment is constructed. Use spacings as shown
Use temporary slope drains (berms, drains, and riprap) as fill surface intermediate
Subgrade or fill surface intermediate
Subgrade or
PRELIMINARY - N
OT FOR CONSTRUCTION
a.rosemanhanauer
3.
2.
1.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
STATE PROJECT
A u g u s t
U m y fi le s p w p r o d u c ti o n d m s S td
.d g n
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8…