The provided document appears to be a project description for two Federal Highway Administration repair projects, OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1), located 28 miles east of Pendleton, Oregon. The projects consist of 0.67 miles of excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, and subexcavation work. The estimated price range is between $5 and $10 million, with a tentative fixed completion date of Spring/Summer 2027. The required work includes construction survey and staking, contractor quality control and assurance, contractor sampling and testing, construction schedules, soil erosion and sediment control, and various earthwork, slope reinforcement, aggregate, and incidental construction activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FS ERFO 2020(1)-14(1), Walla Walla South Umatilla Repairs 2020, Phase 1 & WA

ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1

This work consists of: excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation.

Project Location: 28 Miles East of Pendleton, Oregon.

Project Length: 0.67 Miles

Estimated Price Range: Between $5 and $10 Million

Tentative Fixed Completion Date: Spring/Summer 2027

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

O n e S ch ed u le

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes

153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion & Sediment Control Temporary Stream Diversion Silt Fence Fiber Roll

ALL

12,150 LNFT

420 LNFT

158 Watering for Dust Control ALL

DIVISION 200 – Earthwork

201 Clearing and Grubbing 1.6 ACRE

203 Removal of Structures and Obstructions Removal of Pipe Culvert 3 EACH

204 Excavation & Embankment Roadway Excavation Subexcavation Unclassified Borrow

960 CUYD

220 CUYD

9,400 CUYD

205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No e S ch ed

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap Placed Riprap, Method B, Class 4 Placed Riprap, Method B, Class 5 Placed Riprap, Method B, Class 6

160 CUYD

3,200 CUYD

7,700 CUYD

252 Rockery, Special Rock Embankment, and Rock Buttress 2,100 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate Roadway Aggregate, Method 1 440 CUYD

303 Road Reconditioning Ditch Reconditioning Aggregate Surface Reconditioning

4,100 LNFT

4,000 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments

DIVISION 500 – Rigid Pavement

DIVISION 550 – Bridge Construction

551 Driven Piles Untreated Timber Piles, In Place 160 EACH

DIVISION 600 – Incidental Construction

602 Culverts & Drains 24-Inch Pipe Culvert 36-Inch Pipe Culvert 144-Inch Pipe Culvert

30 LNFT

32 LNFT

70 LNFT

621 Monuments & Markers (construction survey & staking) (yes/no) No

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

625 Turf Establishment 1.5 ACRE

626 Plants, Trees, Shrubs, Vines, and Groundcovers ALL e S ch ed

635 Temporary Traffic Control ALL

647 Mitigation Log Barrier Root Wad Fish Passage Boulder Bank Stabilization (Boulder Cluster) Streambed Material

100 EACH

200 EACH

15 EACH

60 EACH

160 EACH