The provided document appears to be a project description for two Federal Highway Administration repair projects, OR FS ERFO 2020(1)-14(1) and WA ERFO FS UMATL614 2020-1(1), located 28 miles east of Pendleton, Oregon. The projects consist of 0.67 miles of excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, and subexcavation work. The estimated price range is between $5 and $10 million, with a tentative fixed completion date of Spring/Summer 2027. The required work includes construction survey and staking, contractor quality control and assurance, contractor sampling and testing, construction schedules, soil erosion and sediment control, and various earthwork, slope reinforcement, aggregate, and incidental construction activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR FS ERFO 2020(1)-14(1), Walla Walla South Umatilla Repairs 2020, Phase 1 & WA
ERFO FS UMATL614 2020-1(1), Walla Walla North – Umatilla Repairs 2020, Phase 1
This work consists of: excavation, borrow, grading, aggregate surfacing, drainage, riprap, rock embankment, stream bank stabilization, subexcavation.
Project Location: 28 Miles East of Pendleton, Oregon.
Project Length: 0.67 Miles
Estimated Price Range: Between $5 and $10 Million
Tentative Fixed Completion Date: Spring/Summer 2027
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
O n e S ch ed u le
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control Temporary Stream Diversion Silt Fence Fiber Roll
ALL
12,150 LNFT
420 LNFT
158 Watering for Dust Control ALL
DIVISION 200 – Earthwork
201 Clearing and Grubbing 1.6 ACRE
203 Removal of Structures and Obstructions Removal of Pipe Culvert 3 EACH
204 Excavation & Embankment Roadway Excavation Subexcavation Unclassified Borrow
960 CUYD
220 CUYD
9,400 CUYD
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No e S ch ed
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap Placed Riprap, Method B, Class 4 Placed Riprap, Method B, Class 5 Placed Riprap, Method B, Class 6
160 CUYD
3,200 CUYD
7,700 CUYD
252 Rockery, Special Rock Embankment, and Rock Buttress 2,100 CUYD
DIVISION 300 – Aggregate and Base Courses
302 Minor Crushed Aggregate Roadway Aggregate, Method 1 440 CUYD
303 Road Reconditioning Ditch Reconditioning Aggregate Surface Reconditioning
4,100 LNFT
4,000 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction
551 Driven Piles Untreated Timber Piles, In Place 160 EACH
DIVISION 600 – Incidental Construction
602 Culverts & Drains 24-Inch Pipe Culvert 36-Inch Pipe Culvert 144-Inch Pipe Culvert
30 LNFT
32 LNFT
70 LNFT
621 Monuments & Markers (construction survey & staking) (yes/no) No
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
625 Turf Establishment 1.5 ACRE
626 Plants, Trees, Shrubs, Vines, and Groundcovers ALL e S ch ed
635 Temporary Traffic Control ALL
647 Mitigation Log Barrier Root Wad Fish Passage Boulder Bank Stabilization (Boulder Cluster) Streambed Material
100 EACH
200 EACH
15 EACH
60 EACH
160 EACH