About this opportunity

The Department of the Interior National Park Service is soliciting proposals for the rehabilitation of the water distribution system and water storage tank at Hurricane Ridge in Olympic National Park, Washington. The project involves replacing the existing water storage and distribution system with new DR11 high-density polyethylene pipe, upgrading water system controls, and rehabilitating a 100,000-gallon dual-chamber underground concrete reservoir. The work includes installing new electrical conduits, control panels, and fire hydrant assemblies, with optional components for demolishing obsolete surface water infrastructure and installing remote monitoring capabilities. Proposals will be evaluated based on technical capability (including project experience, technical approach, key personnel, and schedule), past performance, and price, with technical and past performance factors being approximately equal to price in importance. The final deadline for proposal submission is June 16, 2025, at noon Pacific Standard Time, with questions due by June 11, 2025, and a mandatory site visit was conducted on May 29, 2025.

This is a 100% small business set-aside opportunity under NAICS code 237110 for Water and Sewer Line and Related Structures Construction, with no specific incumbent contractors mentioned in the documentation. The contract is structured as a firm-fixed-price construction contract with a performance period of 365 days, running from June 23, 2025, to June 22, 2026, though specific award values are not disclosed in the available materials. The work must be completed within 200 calendar days after receiving notice to proceed, with critical demolition work required between August 1 and Labor Day during the dry season. The project location is at Hurricane Ridge, approximately 17 miles south of Port Angeles, Washington, in an environmentally sensitive subalpine meadow environment where contractors must maintain park operations, visitor access, and protect cultural resources throughout the construction period. Seven companies attended the site visit, indicating strong interest from potential contractors including J&A Contracting, RJS Construction, and other regional construction firms.

Notice text

5 versions

Update #5 · Latest ·

Olympic National Park - REHAB HURRICANE RIDGE WATER: Purpose of Amendment 0004 is to provide FINAL responses to contractor questions

Update #4 ·

Olympic National Park - REHAB HURRICANE RIDGE WATER: Purpose of Amendment 0003 is to provide responses to contractor questions, and extend the RFP FROM; 6/12/2025 TO: 6/16/2025

Update #3 ·

Olympic National Park - REHAB HURRICANE RIDGE WATER: Purpose of Amendment 0002 is to provide missing specification information. Questions and responses from site visit.

Update #2 ·

Olympic National Park - REHAB HURRICANE RIDGE WATER: Purpose of Amendment 0001 is to add dates to the SF-1442

Update #1 ·

Olympic National Park - REHAB HURRICANE RIDGE WATER

Files

File Type Posted
Sol_140P8325R0005_Amd_0004.pdf PDF
Final_Questions_NPS_Responses_0004.xlsx XLSX spreadsheet
Sol_140P8325R0005_Amd_0003.pdf PDF
B09_questions_1_7-_6_5_25_0003.docx DOCX document
Sol_140P8325R0005_Amd_0002.pdf PDF
A06_Specifications_OLYM_PMIS_306966-307067_Signed_100__Final_0002.pdf PDF
B11_Site_Visit_Sign-in_0002.docx DOCX document
B11_Site_Visit_Q_A_0002.docx DOCX document
Sol_140P8325R0005_Amd_0001.pdf PDF
B08_2024_Construction_RFP_Clauses_5_13_2025_0001.pdf PDF
Sol_140P8325R0005.pdf PDF
A06_Attachment_C_-_Fire_Hydrant_Assembly.pdf PDF
B08_Project_Experience_Questionnaire_Attachement__7.docx DOCX document
B08_Limitations_on_Subcontracting_Worksheet_Attachment_8.xlsx XLSX spreadsheet
B08_Offeror_s_representations_and_certificates_to_be_provided_with_proposal_Attachment__9.pdf PDF
B03_WA20250044_01_03_2025_SAM_Attachment_4.pdf PDF
A03_-_Construction_Contract_Administration_attachment___5.docx DOCX document
A07_Plans_OLYM_PMIS_306966-307067_22x34_Signed_100__Final_attachment_2.pdf PDF
B08_Hurricane_Ridge_Water_Rehab_Photos_attachment.pdf PDF
B08_PAST_PERFORMANCE_QUESTIONNAIRE_Attachememt___6.docx DOCX document
A06_Specifications_OLYM_PMIS_306966-307067_Signed_100__Final_attachment_1.pdf PDF
B08_Contract_Price_Schedule_OLYM_Final_attachment_3.pdf PDF
Show all 22

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Olympic National Park REHAB HURRICANE RIDGE WATER Pre-Solicitation
Olym - rehab hurricane ridge water Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
HAVO 326181 Rehabilitate Rainshed&Water Treatment NAICS 237110 National Office No set-aside
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business
YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod NAICS 237110 — No set-aside
Oconaluftee Waterline Replacement Cherokee, North Carolina 28719, United States · NAICS 237110 Forest Service Total Small Business
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Mc Kinnon, Wyoming 82935, United States · NAICS 237110 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors