OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF25SS0003
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Sulphur, Oklahoma, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking qualified prime contractors for the replacement of a pedestrian trail bridge within the Chickasaw National Recreation Area in Murray County, Oklahoma. The project involves removing an existing bridge located in Veterans Lake that was damaged by a tornado in April 2024 and installing a new 130-foot-long, 6-foot-wide prefabricated steel truss bridge with a timber deck. Interested contractors must submit specific documentation by February 7, 2025, at 2 p.m. local Denver time, including a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter demonstrating capacity, and a list of comparable road construction projects. Contractors must be certified in the System for Award Management (SAM) and adhere to Small Business Administration guidelines regarding business size and affiliation. The evaluation will focus on contractors' qualifications, bonding capabilities, and prior experience with similar infrastructure projects.

The procurement does not have a specific set-aside designation but encourages participation from small businesses, including HUBZone, woman-owned, 8(a), and service-disabled veteran-owned small businesses. The project's estimated cost range is between $2 million and $5 million, with anticipated advertisement in Spring 2025 and construction scheduled for Summer 2025. The project timeline includes an estimated completion date of June 2026, with no onsite work permitted from early March to early May due to weather constraints. Principal work items include bridge removal, concrete and reinforcing steel work, and installation of a prefabricated modular steel pedestrian bridge. The project will utilize two parking lots as staging areas and will involve carefully removing the existing bridge from Veterans Lake, likely using floating and crane techniques to transport and dispose of the structure.

Notice text

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.  Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:  Laura Vallejos) for receipt by close of business (2 p.m. local Denver time) on February 7, 2025.

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and

(4) Provide a list of road construction projects of equal or greater value and scope to the OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge project in which you performed project in which you performed work similar in scope.   DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

Project Details: OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge

The project is located along Veterans Lake Trail within the Chickasaw (CHIC) National Recreation Area (NRA) in Murray County, Oklahoma. The proposed improvement is to replace a pedestrian trail bridge that was removed by a tornado April 2024.  The existing bridge has been found in Veterans Lake and will need to be removed as well.  The existing abutments are intact; however, some of the anchor bolts are bent and the south abutment is cracked.

Constructing the new bridge includes repairing the existing abutments that would be reused to support the replacement bridge, repairing the minor masonry structure, and installing an approximately 130-foot-long and 6-foot-wide prefabricated pedestrian bridge. The replacement bridge would be a prefabricated steel truss bridge with a timber deck, similar in appearance to the original structure. Construction staging would occur at the existing parking lot at the north end of the dam and access provided via the existing trail.

Removal of the existing bridge from Veterans Lake would likely involve floating the structure to the parking lots on the east side of the lake and lifting it via crane. The bridge would then be appropriately disposed of. Two parking lots would be utilized as staging areas and provide access for the bridge removal process. 

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Bridge (Steel Truss Pedestrian Bridge)
  • 1 CUYD of Removal of concrete (Abutment)
  • 200 lbs Reinforcing steel
  • 1 (LPSM) Pre-Fabricated Steel Bridge (Modular steel pedestrian bridge)
  • 1 CUYD Concrete

It is anticipated this project will be advertised in Spring 2025 and be under construction in the Summer of 2025.  The project has an estimated completion date of June 2026.

Due to weather, no onsite work is to occur from early March to early May.

ESTIMATED COST RANGE:

The estimated price range of the project work is between $2,000,000 and $5,000,000.

           

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Award Award Notice
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Latest solicitation Solicitation
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Pre-Solicitation
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity