About this opportunity

The Department of Transportation's Federal Highway Administration is seeking a small business contractor to replace the Veterans Lake Trail Bridge within the Chickasaw National Recreation Area in Murray County, Oklahoma. The project involves constructing a new 130-foot-long and 6-foot-wide prefabricated steel truss pedestrian bridge with a timber deck, repairing existing abutments, and removing the original bridge structure that was damaged by a tornado in April 2024. Construction staging will occur in existing parking lots, with access provided via the existing trail, and the project is anticipated to be advertised in Spring 2025 with construction beginning in Summer 2025. While specific evaluation criteria are not detailed in the pre-solicitation notice, contractors should be prepared to demonstrate capability in bridge construction, site restoration, and adherence to National Recreation Area environmental standards. The response deadline for this opportunity is April 10, 2025.

The contract is designated as a Total Small Business set-aside, which means only small businesses can compete for this opportunity. The estimated project cost ranges between $2,000,000 and $5,000,000, with a projected completion date of June 2026. Principal work items include removing the existing steel truss pedestrian bridge, removing concrete from abutments, installing reinforcing steel, and implementing a pre-fabricated modular steel pedestrian bridge. The project has specific seasonal work restrictions, with no onsite work permitted from early March to early May due to weather considerations. The contract falls under NAICS category 237310 for Highway, Street, and Bridge Construction, and will require specialized construction expertise in pedestrian bridge replacement and restoration within a national recreation area.

Notice text

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

PROJECT NUMBER:  OK ERFO NP CHIC 2024-1(1)

PROJECT NAME:  Veterans Lake Trail Bridge

PROJECT DESCRIPTION: 

The project is located along Veterans Lake Trail within the Chickasaw (CHIC) National Recreation Area (NRA) in Murray County, Oklahoma. The proposed improvement is to replace a pedestrian trail bridge that was removed by a tornado April 2024.  The existing bridge has been found in Veterans Lake and will need to be removed as well.  The existing abutments are intact; however, some of the anchor bolts are bent and the south abutment is cracked.

SCOPE OF THE WORK: 

Constructing the new bridge includes repairing the existing abutments that would be reused to support the replacement bridge, repairing the minor masonry structure, and installing an approximately 130-foot-long and 6-foot-wide prefabricated pedestrian bridge. The replacement bridge would be a prefabricated steel truss bridge with a timber deck, similar in appearance to the original structure. Construction staging would occur at the existing parking lot at the north end of the dam and access provided via the existing trail.

Removal of the existing bridge from Veterans Lake would likely involve floating the structure to the parking lots on the east side of the lake and lifting it via crane. The bridge would then be appropriately disposed of. Two parking lots would be utilized as staging areas and provide access for the bridge removal process. 

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Bridge (Steel Truss Pedestrian Bridge)
  • 1 CUYD of Removal of concrete (Abutment)
  • 200 lbs Reinforcing steel
  • 1 (LPSM) Pre-Fabricated Steel Bridge (Modular steel pedestrian bridge)
  • 1 CUYD Concrete

It is anticipated this project will be advertised in Spring 2025 and be under construction in the Summer of 2025.  The project has an estimated completion date of June 2026.

Due to weather, no onsite work is to occur from early March to early May.

ESTIMATED COST RANGE: 

The estimated price range of the project work is between $2,000,000 and $5,000,000.

Notice history

Notice Type Posted
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Award Award Notice
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Latest solicitation Solicitation
This notice Pre-Solicitation
OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements Tishomingo, Oklahoma 73460, United States · NAICS 237310 Federal Highway Administration Total Small Business
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors