Northwest District Carpet Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 70Z03326QSEAT0055
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238330 Flooring Contractors
- PSC
- 7220 Floor Coverings
- Place of performance
- Seattle, Washington 98174, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Coast Guard seeks removal and installation of approximately 760 square feet of commercial carpet tile and 160 linear feet of cove base at its Northwest District Command Center in Seattle, with proposals due August 19, 2026. The procurement is set aside for small business and will be awarded as a firm fixed price purchase order.
Place of performance is USCG Northwest District Command Center, 915 2nd Avenue, 35th Floor, Room 3544, Seattle, Washington 98174. Period of performance is estimated at August 24 through September 4, 2026, subject to change closer to award. The NAICS code is 238330, Flooring Contractors; PSC is 7220, Floor Coverings.
The contractor must remove existing worn carpet tiles and baseboards, prepare the Vinyl Composition Tile substrate by scraping and removing adhesive residue, then supply and install new glue-down commercial carpet tiles and 4-inch black commercial rubber cove base to manufacturer specifications. The contractor shall provide carpet samples of appropriate pattern and color for Coast Guard selection prior to installation. All work must comply with manufacturer specifications to ensure durability in a Command Center environment.
A mandatory site visit is required for all offerors; scheduling requests must be submitted to Michelle Myhra at Michelle.M.Myhra2@uscg.mil and copied to OS1 Morgan Custer at Morgan.D.Custer@uscg.mil no later than August 4, 2026 at 12 p.m. PST. The site visit is scheduled for August 5, 2026 at 10:00 a.m.
All contractor personnel must comply with Coast Guard physical security and access protocols, obtain security background clearances, be escorted at all times per COMDTINST M5510.23B, leave portable electronic devices outside the Command Center, and ensure facility sanitization of all Controlled National Security Information before work begins. The contractor bears responsibility for confirming measurements and off-site disposition of removed materials in accordance with local and federal environmental disposal regulations. Davis-Bacon prevailing wage rates apply per King County, Washington determinations.
Notice text
3 versions
Update #3 · Latest ·
Amendment to Solicitation 2nd Edit:
The amendment to this soliciation is for the following changes:
Updated section 4.3 "Carpet Tiles" and "Cove Base" to define requirements based on questions.
To extend the deadline for proposals to 08/19/2026 3pm (PST) due to the posting of questions.
To add Construction Wage rates, clauses and provisions
All other requirements remain the same.
Amendment to Solicitation:
The amendment to this soliciation is to extend the deadline for proposals to 08/17/2026 3pm (PST) to allow more time for techincal authority to respond to questions. All other requirements remain the same.
DESCRIPTION OF REQUIREMENT:
The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to remove old flooring and baseboards, prepare the sub-surface, and install approximately 760 square feet of new commercial carpet tile and 160 linear feet of new cove base board. Contractor shall provide Coast Guard Northwest District with carpet samples of appropriate pattern/color that can be selected at time of award.
Place of Performance:
USCG Northwest District Command Center RIC
915 2nd Avenue
35th Floor, Room 3544
Seattle, WA. 98174
Period of Performance:
08/24/2026 – 09/04/2026
This is an estimated period of performance and subject to change closer to award.
Classification:
This acquisition is set aside for small business. The NAICS code is 238330 Flooring Contractors. The contract type will be firm fixed price purchase order.
Site Visit and Location:
A site visit shall be mandatory for all interested offerors. Each offeror is required to visit the site to be able to provide the government with an accurate and competitive proposal. All interested offerors must arrive no later than five minutes prior to the start time. To schedule site visit, provide list of attendees via E-mail to Michelle Myhra at Michelle.M.Myhra2@uscg.mil and copy OS1 Morgan Custer at Morgan.D.Custer@uscg.mil no later than 08/04/2026, 12pm (PST) any offers that request after specified date will not be allowed to attend site visit. There will be no more site visits scheduled after date specified.
Site Visit Date: 08/05/2026
Site Visit Start Time: 1000
Site Visit Escort: OS1 Morgan Custer
Location:USCG Northwest District Command Center RIC 915 2nd Avenue 35th Floor, Room 3544 Seattle, WA. 98174
Special Site Visit Access Requirements:
In accordance with Coast Guard Information Management Program instructions contractors shall follow the requirements to gain access to the area
.
- Contractors shall be always escorted within the space.
- All portable electronic devices (PEDS) must be left outside of the Command Center. The Command Security Officer (CSO) shall be notified of any video or photo requests.
- Escorts will ensure contractors are signed into the visitor log with date and time annotated.
- Ensure the Command Center is sanitized of all CNSI (i.e.; SIPRNET, hard copy form, discussion, etc.)
Questions:
E-mail all questions regarding to this solicitation shall be submitted in writing to the Contract Officer Michelle Myhra at Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT00055 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the units technical authority for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors. No more questions will be answered after 08/10/26, 3pm (PST).
Proposal submission:
Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.
All quotes shall be required to be on SF 1442 with a detailed breakdown of all costs along that have been requested. Submit quotes to the following E-mail Address Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT0055 in the subject line. Date of offers is due 08/17/26 at 3pm (PST). All offers that are submitted late (by day and time zone) and quotes that do not include a breakdown of cost will not be considered in award determination.
A complete submission shall consist of the following two parts:
Part 1: Price Proposal
- A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
- Mobilization and Site Prep
- Itemization List of Materials
- Installation by Tasks
- Labor Rate
Part 2: Technical Proposal
The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:
- Technical Approach: A step-by-step description of how the quoter will perform the work, including inspection, repair, and removal or any and all materials.
- Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including demobilization and site cleanup, will be completed within the required Period of Performance, with a completion date of September 29, 2026. Milestones should be shown in terms of days from the NTA.
Award:
The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. The award will be given to the lowest priced, responsible quoter, whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically. If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on. Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractors to be registered in SAM shall result in Contracting Officer proceeding with next successful registered offeror. Website: www.sam.gov
Update #2 ·
Amendment to Solicitation
The amendment to this soliciation is to extend the deadline for proposals to 08/17/2026 3pm (PST) to allow more time for techincal authority to respond to questions. All other requirements remain the same.
DESCRIPTION OF REQUIREMENT:
The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to remove old flooring and baseboards, prepare the sub-surface, and install approximately 760 square feet of new commercial carpet tile and 160 linear feet of new cove base board. Contractor shall provide Coast Guard Northwest District with carpet samples of appropriate pattern/color that can be selected at time of award.
Place of Performance:
USCG Northwest District Command Center RIC
915 2nd Avenue
35th Floor, Room 3544
Seattle, WA. 98174
Period of Performance:
08/24/2026 – 09/04/2026
This is an estimated period of performance and subject to change closer to award.
Classification:
This acquisition is set aside for small business. The NAICS code is 238330 Flooring Contractors. The contract type will be firm fixed price purchase order.
Site Visit and Location:
A site visit shall be mandatory for all interested offerors. Each offeror is required to visit the site to be able to provide the government with an accurate and competitive proposal. All interested offerors must arrive no later than five minutes prior to the start time. To schedule site visit, provide list of attendees via E-mail to Michelle Myhra at Michelle.M.Myhra2@uscg.mil and copy OS1 Morgan Custer at Morgan.D.Custer@uscg.mil no later than 08/04/2026, 12pm (PST) any offers that request after specified date will not be allowed to attend site visit. There will be no more site visits scheduled after date specified.
Site Visit Date: 08/05/2026
Site Visit Start Time: 1000
Site Visit Escort: OS1 Morgan Custer
Location:USCG Northwest District Command Center RIC 915 2nd Avenue 35th Floor, Room 3544 Seattle, WA. 98174
Special Site Visit Access Requirements:
In accordance with Coast Guard Information Management Program instructions contractors shall follow the requirements to gain access to the area
.
- Contractors shall be always escorted within the space.
- All portable electronic devices (PEDS) must be left outside of the Command Center. The Command Security Officer (CSO) shall be notified of any video or photo requests.
- Escorts will ensure contractors are signed into the visitor log with date and time annotated.
- Ensure the Command Center is sanitized of all CNSI (i.e.; SIPRNET, hard copy form, discussion, etc.)
Questions:
E-mail all questions regarding to this solicitation shall be submitted in writing to the Contract Officer Michelle Myhra at Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT00055 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the units technical authority for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors. No more questions will be answered after 08/10/26, 3pm (PST).
Proposal submission:
Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.
All quotes shall be required to be on SF 1442 with a detailed breakdown of all costs along that have been requested. Submit quotes to the following E-mail Address Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT0055 in the subject line. Date of offers is due 08/17/26 at 3pm (PST). All offers that are submitted late (by day and time zone) and quotes that do not include a breakdown of cost will not be considered in award determination.
A complete submission shall consist of the following two parts:
Part 1: Price Proposal
- A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
- Mobilization and Site Prep
- Itemization List of Materials
- Installation by Tasks
- Labor Rate
Part 2: Technical Proposal
The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:
- Technical Approach: A step-by-step description of how the quoter will perform the work, including inspection, repair, and removal or any and all materials.
- Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including demobilization and site cleanup, will be completed within the required Period of Performance, with a completion date of September 29, 2026. Milestones should be shown in terms of days from the NTA.
Award:
The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. The award will be given to the lowest priced, responsible quoter, whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically. If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on. Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractors to be registered in SAM shall result in Contracting Officer proceeding with next successful registered offeror. Website: www.sam.gov
Update #1 ·
DESCRIPTION OF REQUIREMENT:
The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to remove old flooring and baseboards, prepare the sub-surface, and install approximately 760 square feet of new commercial carpet tile and 160 linear feet of new cove base board. Contractor shall provide Coast Guard Northwest District with carpet samples of appropriate pattern/color that can be selected at time of award.
Place of Performance:
USCG Northwest District Command Center RIC
915 2nd Avenue
35th Floor, Room 3544
Seattle, WA. 98174
Period of Performance:
08/24/2026 – 09/04/2026
This is an estimated period of performance and subject to change closer to award.
Classification:
This acquisition is set aside for small business. The NAICS code is 238330 Flooring Contractors. The contract type will be firm fixed price purchase order.
Site Visit and Location:
A site visit shall be mandatory for all interested offerors. Each offeror is required to visit the site to be able to provide the government with an accurate and competitive proposal. All interested offerors must arrive no later than five minutes prior to the start time. To schedule site visit, provide list of attendees via E-mail to Michelle Myhra at Michelle.M.Myhra2@uscg.mil and copy OS1 Morgan Custer at Morgan.D.Custer@uscg.mil no later than 08/04/2026, 12pm (PST) any offers that request after specified date will not be allowed to attend site visit. There will be no more site visits scheduled after date specified.
Site Visit Date: 08/05/2026
Site Visit Start Time: 1000
Site Visit Escort: OS1 Morgan Custer
Location:USCG Northwest District Command Center RIC 915 2nd Avenue 35th Floor, Room 3544 Seattle, WA. 98174
Special Site Visit Access Requirements:
In accordance with Coast Guard Information Management Program instructions contractors shall follow the requirements to gain access to the area
.
- Contractors shall be always escorted within the space.
- All portable electronic devices (PEDS) must be left outside of the Command Center. The Command Security Officer (CSO) shall be notified of any video or photo requests.
- Escorts will ensure contractors are signed into the visitor log with date and time annotated.
- Ensure the Command Center is sanitized of all CNSI (i.e.; SIPRNET, hard copy form, discussion, etc.)
Questions:
E-mail all questions regarding to this solicitation shall be submitted in writing to the Contract Officer Michelle Myhra at Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT00055 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the units technical authority for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors. No more questions will be answered after 08/10/26, 3pm (PST).
Proposal submission:
Prohibition on Extraneous Material: Do not submit any unnecessary documents, promotional marketing materials, general company history brochures, or generic cover letters. Quotes must contain only the specific information requested below. Extraneous documents will not be evaluated and may be counted against your page limits.
All quotes shall be required to be on SF 1442 with a detailed breakdown of all costs along that have been requested. Submit quotes to the following E-mail Address Michelle.M.Myhra2@uscg.mil with solicitation RFQ number 70Z03326QSEAT0055 in the subject line. Date of offers is due 08/12/26 at 3pm (PST). All offers that are submitted late (by day and time zone) and quotes that do not include a breakdown of cost will not be considered in award determination.
A complete submission shall consist of the following two parts:
Part 1: Price Proposal
- A detailed Price Breakdown for the total firm-fixed-price. The Price Breakdown shall not exceed one (1) page. The breakdown must, at a minimum, separate the costs for the following major tasks:
- Mobilization and Site Prep
- Itemization List of Materials
- Installation by Tasks
- Labor Rate
Part 2: Technical Proposal
The Technical Proposal shall not contain any pricing information. The Technical Proposal shall not exceed two (2) pages in length. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:
- Technical Approach: A step-by-step description of how the quoter will perform the work, including inspection, repair, and removal or any and all materials.
- Project Schedule: A high-level timeline illustrating the project's major milestones. The schedule must start from the date of the Notice to Award (NTA) and demonstrate that all work, including demobilization and site cleanup, will be completed within the required Period of Performance, with a completion date of September 29, 2026. Milestones should be shown in terms of days from the NTA.
Award:
The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. The award will be given to the lowest priced, responsible quoter, whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically. If the lowest priced quote is not found to be technically acceptable, the contracting officer will evaluate the next lowest priced quote, and so on. Quotes determined to be incomplete, unreasonable, or unrealistic will not be considered for award. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractors to be registered in SAM shall result in Contracting Officer proceeding with next successful registered offeror. Website: www.sam.gov
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Northwest District Carpet Replacement | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| United states coast guard ketchikan alaska new carpet installation | — | No set-aside | |
| USCG ISA Tenant Improvement Construction Project | — | No set-aside | |
| Detached Duty Recruiter Coworking Stations | Coast Guard | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity