Carpet Replacement at USCG Air Station Clearwater

Open Solicitation Posted

Solicitation number
20150PR270000020
Agency
Not on record
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238330 Flooring Contractors
Place of performance
Clearwater, Florida 33762, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard Base Miami Beach procurement office is soliciting quotes for carpet replacement at USCG Air Station Clearwater, Clearwater, Florida, with questions due December 14, 2026 and quotes due December 18, 2026. The procurement is a 100% Total Small Business Set-Aside under NAICS 238330, Flooring Contractors, with a $19.0 million size standard, and offers from entities other than small business concerns under that NAICS will not be considered.

Work is performed at U.S. Coast Guard Air Station Clearwater, 15100 Rescue Way, Clearwater, FL 33762. The scope covers replacement of existing carpet and cove base in FACENG and Supply Office spaces, including approximately 2,820 square feet of commercial carpet tile and 775 linear feet of cove base. The contractor must field-verify quantities before ordering materials. Work occurs on weekends, with displaced furniture restored for normal use by 7:00 a.m. Monday, over a 45-day period of performance. The work must meet CRI 104 installation standards, and the contractor must provide a one-year workmanship warranty and transfer manufacturer warranties to the Coast Guard, with defects corrected within five business days.

Security requirements include submitting a consolidated personnel list one week before work with each person's full name, date of birth, and last four Social Security Number digits for background checks. Personnel are limited to U.S. citizens and permanent resident aliens, and firearms and weapons are prohibited on base. A mandatory site visit is scheduled for Thursday, December 10, 2026, at 10:00 a.m. EST at the air station, with Primary COR CWO Joe Calderon and alternate POC LCDR Scott Kellerman.

The acquisition is a firm-fixed-price lump-sum buy under FAR Subpart 12.6, FAR Part 13, and FAR Part 15. Offerors must submit three volumes by email to Mehdi Bouayad at Mehdi.Bouayad@uscg.mil: Technical Approach & Capability (product data and a 45-day milestone schedule), Past Performance (minimum two relevant references from the past three years), and Price Quote (completed CLIN schedule, UEI, CAGE code, and signed acknowledgment of amendments). Award goes to the responsible offeror offering best value based on technical capability and approach, past performance, and price, with technical and past performance combined as significantly more important than price.

Notice text

COMBINED SYNOPSIS / SOLICITATION FOR
COMMERCIAL SERVICES
Solicitation Number: 20150PR270000020
Project Title: USCG Air Station Clearwater Carpet Replacement – FACENG and Supply Offices
Issuing Agency: United States Coast Guard (USCG) – Base Miami Beach (Procurement &
Contracting)
Notice Type: Combined Synopsis / Solicitation
Set-Aside Status: 100% Total Small Business Set-Aside
Applicable NAICS Code: 238330 – Flooring Contractors
Small Business Size Standard: $19.0 Million
Contract Type: Firm-Fixed-Price (FFP)
Acquisition Authority: FAR Subpart 12.6 (Streamlined Procedures for Evaluation and
Solicitation for Commercial Items), FAR Part 13 (Simplified Acquisition Procedures), and FAR Part
15
Performance Location: U.S. Coast Guard Air Station Clearwater, 15100 Rescue Way,
Clearwater, FL 33762
1. General Notice & Acquisition Overview
This document constitutes a combined synopsis/solicitation for commercial services and minor
facility improvements prepared in accordance with the format in Federal Acquisition Regulation
(FAR) Subpart 12.6, as supplemented with additional information included in this notice.
Sole Solicitation: This announcement constitutes the only solicitation; quotes are being
requested and a separate written solicitation will not be issued.
Set-Aside: This solicitation is advertised as a 100% Total Small Business Set-Aside.
Offers received from entities other than small business concerns under NAICS code
238330 will not be considered.
Basis of Award: Award will be made using simplified acquisition procedures to the
responsible offeror whose quote conforms to all solicitation requirements and represents
the Best Value to the Government, considering technical capability/approach, past
performance, and price.

2. Schedule of Supplies / Services & Pricing
The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation,
disposal, and incidental services necessary to complete the carpet replacement project as
specified in the Statement of Work.
CLIN Description Qty Unit Unit Price Total Amount
0001
Base Bid: Complete carpet
replacement and cove base
installation throughout
FACENG and Supply Office
spaces, including furniture
moving/reset, weekend
phasing, surface preparation,
adhesives, transitions, and
disposal (Approx. 2,820 SF
Carpet / 775 LF Cove Base) in
accordance with Project
33643384 SOW.
1 Job $____________ $____________
Note: Quantities are derived from drawing takeoffs and field estimates. Offerors are responsible
for field-verifying all measurements during the pre-quote site visit prior to submitting their quote.

3. Site Visit Information
A formal site visit has been scheduled for prospective offerors to inspect the existing site
conditions, verify carpet and cove base dimensions, evaluate access routes, and inspect furniture
configurations.
Date & Time: Thursday, December 10, 2026, at 10:00 AM EST
Location:
U.S. Coast Guard Air Station Clearwater
15100 Rescue Way, Clearwater, FL 33762
Primary COR: CWO Joe Calderon — Jose.A.Calderon@uscg.mil | Phone:
(727) 423-7586
Alternate POC: LCDR Scott Kellerman — scott.n.kellerman@uscg.mil |
Phone: (571) 499-0711

Required Security Submission for Site Visit:
Real ID-compliant Driver’s License Number and State of Issuance
Site Access Rules: Only U.S. citizens and permanent resident aliens are allowed onboard
Air Station Clearwater. Attendees must present valid government photo identification at the
front gate. Vehicles and equipment are subject to inspection at all times.

4. Statement of Work (SOW) — Project 33643384
4.1 Scope of Work Summary
The Contractor shall furnish all labor, supervision, tools, equipment, materials, delivery, furniture
moving, carpet and cove base removal, surface preparation, installation, cleanup, and disposal for
the complete replacement of existing carpet and cove base throughout designated administrative
areas within the FACENG and Supply building. All work must comply with the Carpet and Rug
Institute (CRI) 104 Standard for Installation of Commercial Carpet, manufacturer written
instructions, and applicable federal, state, and local standards.
4.2 Included Areas and Approximate Takeoffs
FACENG and Conference Areas: Rooms 115, 116, 119, 122, former Room 114 suite
(conference room, adjoining office, and internal passages): approximately 1,150 sq. ft.
Supply Office Areas: Rooms 102, 103, 104, 107, 108, 109, and 110: approximately 1,670
sq. ft.
Combined Planning Takeoff: Approximately 2,820 square feet of carpet tile and 775
linear feet of cove base.
Excluded Areas: Hard-floor supply warehouse, public corridors/vestibules, main lobby,
restrooms, mechanical rooms, and shop floors.
Period of Performance: Total period of performance shall be forty-five (45) calendar
days from issuance of the Notice to Proceed (NTP).
Schedule Submission: The Contractor shall provide a phased, room-by-room work
schedule outlining start dates, sequence, weekend milestones, and completion

4.4 Technical Requirements & Material Specifications
1. Carpet Tile: Commercial-grade, heavy/severe-traffic-rated modular carpet tiles equal to or
exceeding existing durability and aesthetic standards. Materials must originate from
consistent production runs/dye lots within each contiguous area.
2. Cove Base: Commercial resilient cove base matching existing height (minimum nominal
height of 4 inches).
3. Submittals & Approval: Prior to material ordering, the Contractor must submit product
technical data, adhesive specifications, color lines, transition details, and manufacturer
warranty certificates to the Contracting Officer's Representative (COR). The COR will select
final colors and patterns.
4. Subfloor Preparation: Remove old adhesive residue, perform mechanical scraping, patch
cracks/depressions, and verify moisture and pH levels per manufacturer criteria before
laying tile.
5. Transitions: Install heavy-duty, smooth transition strips at doorways and junctions with
hard flooring, ensuring no trip hazards or door interference.
6. Furniture Handling: The Contractor shall systematically move and reset all furniture,
desks, and storage fixtures. The Coast Guard will disconnect and secure computers,
phones, personal effects, and sensitive records prior to work.
7. Refuse & Disposal: Bulk carpet waste and demolition debris shall NOT be disposed of in
Coast Guard dumpsters; all bulk demolition materials must be removed and disposed of offbase
in full accordance with environmental laws. Minor general work debris may use base
dumpsters.

4.5 General On-Base Regulations & Security
Colors: Morning colors (0800) and evening colors (sunset) require all outdoor personnel to
face the flagpole, remain silent, and stop all vehicle/equipment movement.
Traffic: Maximum base speed limit is 10 mph. No cellular phone usage while operating
vehicles or equipment.
Galley & Exchange: Contractors may purchase meals at the base galley (Breakfast 0600–
0730, Lunch 1100–1230) in clean work attire. Base Exchange access is permitted,
excluding purchases of uniforms, alcohol, and tobacco.
Firearms & Weapons: Strictly prohibited on USCG property.

Personnel Background Check: Final contractor employee roster (Name, DOB, last 4
SSN) must be submitted at least one (1) week prior to project mobilization.

4.6 Warranty & Acceptance
Workmanship Warranty: One (1) year from the date of final written acceptance covering
all labor, installation defects, and remediation at zero cost to the Government.
Manufacturer Warranty: Full commercial manufacturer warranties transferred to the
USCG.
Inspection & Cure: The Contractor shall provide at least 24 hours' notice before final
inspection. Noted defects or punch-list items must be corrected within five (5) business
days.

5. Quote Submission & Instructions to Offerors (FAR 52.212-
1 Addendum)
5.1 Submission Deadline & Contact Information
Questions Due: Questions regarding this solicitation must be submitted via email no later
than Monday December 14, 2026, at 2:00 PM EST. All technical question in regards to
this project go to CWO Jose Calderon and please copy me Mr. Mehdi Bouayad via email.
Quotes Due: Quotes must be submitted electronically via email no later than Friday
December 18, 2026, at 1:00 PM EST.
Submissions- Email all quotes to Mr. Mehdi Bouayad via email at
Mehdi.Bouayad@uscg.mil no later than Friday December 18, 2026 at 1:00 PM EST.
5.2 Quote Package Requirements
Offerors must submit the following items in their quote package:
1. Volume I – Technical Approach & Capability:
Understanding of project requirements, including weekend phasing, Monday 7:00 AM
turnover, subfloor prep, and furniture relocation plan.
Product data cut-sheets for proposed commercial-grade carpet tile, resilient cove
base, adhesives, and transition materials.

Proposed 45-day milestone schedule.
2. Volume II – Past Performance:
At least two (2) relevant references for commercial or government flooring projects of
similar scope and complexity completed within the past three (3) years. Include point
of contact, dollar value, and description.
3. Volume III – Price Quote:
Completed Section 2 CLIN Schedule with firm-fixed-price lump-sum amount.
Unique Entity Identifier (UEI) and CAGE code showing active registration in
SAM.gov.
Signed acknowledgment of any solicitation amendments.

6. Evaluation and Basis for Award (FAR 52.212-2 Addendum)
Award will be made to the responsible offeror whose quote represents the Best Value to the
Government using simplified acquisition procedures under FAR Parts 12 and 13. The following
evaluation factors will be evaluated:
1. Factor 1: Technical Capability & Approach
Evaluates the offeror’s demonstrated ability to meet all technical specifications as per the
Statement of work.
2. When submitting your proposals, request a price breakdown of the following:
a. Cost of labor and supervision
b. Cost of materials and equipment needed to remove and dispose of concrete
structure
3. Factor 2: Past Performance
Evaluates the offeror’s record of successful, timely, and quality performance on recent
contracts of similar scope.
4. Factor 3: Price
Price will be evaluated for reasonableness and completeness based on the total lump-sum
price
Technical Capability and Past Performance, when combined, are significantly more important than
price. However, price will become a determining factor as technical proposals become more equal.

7. Applicable FAR and HSAR Provisions & Clauses
The following provisions and clauses apply to this acquisition and are incorporated either by
reference or in full text:
FAR 52.212-1, Instructions to Offerors – Commercial Products and Commercial Services
FAR 52.212-2, Evaluation – Commercial Products and Commercial Services
FAR 52.212-3, Offeror Representations and Certifications – Commercial Products and
Commercial Services
FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial
Services
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or
Executive Orders – Commercial Products and Commercial Services
FAR 52.204-7, System for Award Management (SAM)
FAR 52.204-13, System for Award Management Maintenance
FAR 52.204-24 / 52.204-25, Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment
FAR 52.219-6, Notice of Total Small Business Set-Aside
FAR 52.222-3, Convict Labor
FAR 52.222-21, Prohibition of Segregated Facilities
FAR 52.222-26, Equal Opportunity
FAR 52.222-36, Equal Opportunity for Workers with Disabilities
FAR 52.222-41, Service Contract Labor Standards / Wage Determinations
FAR 52.232-33, Payment by Electronic Funds Transfer – System for Award Management
FAR 52.236-27, Site Visit (Construction/Services)
FAR 52.237-1, Site Visit
FAR 52.246-21, Warranty of Construction / Services

HSAR 3052.209-70, Prohibitions on Contracts with Inverted Domestic Corporations
HSAR 3052.212-70, Contract Terms and Conditions Applicable to DHS Acquisition of
Commercial Items

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
USCG Station Cortez Carpet Removal and Luxury Vinyl Plank (LVP) Flooring Installation Bradenton, Florida 34209, United States · NAICS 238330 — Total Small Business
USCG Station Saginaw River Galley Flooring Essexville, Michigan 48732, United States · NAICS 238330 — Total Small Business
JAX and TBW WFO CARPET REPLACEMENT Florida, United States · NAICS 238330 National Oceanic and Atmospheric Administration Total Small Business
USCG Air Station Clearwater Rapid Gate Services Clearwater, Florida 33762, United States · NAICS 518210 — Total Small Business
New requirement WHS carpet and cove base NAICS 314110 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors