Notice text

5 versions

Update #5 · Latest ·

The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project is separated into three construction packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This contract award is for Phase I only, which is the only phase of the project awarded by the U.S. Army Corps of Engineers, Pittsburgh District. Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area willcreate depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation isspecified in the contract line item schedule. Excavation will be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) will be placed to provide cover for fish and to increase benthic production. Coir logs will be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including c oir log plantings and surrounding shoreline plantings.

Update #4 ·

.

Update #3 ·

The US Army Corps of Engineers, Pittsburgh District, has a requirement for Section 206, Aquatic Ecosystem Restoration at North Park Lake, Allegheny County, PA. The major features of the contract are identified below:

The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project will be separated into three constructions packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This synopsis is for Phase I only, which will be the only phase of the project solicited and awarded by the U.S. Army Corps of Engineers, Pittsburgh District.

Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area would create depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation will be specified in the Bid Schedule that will be released with the Solicitation. Excavation would be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) would be placed to provide cover for fish and to increase benthic production. Coir logs would be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including coir log plantings and surrounding shoreline plantings.

The magnitude of the project is between $1,000,000.00 and $5,000,000.00. This procurement will be advertised on an unrestricted basis. The Invitation for Bid (IFB) will be issued approximately June 2, 2009 on-line only through the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored. Requests must be made by registering for this solicitation at http://www.fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download the solicitation and drawings on or after the above issuance date. For additional contracting opportunities go to the Army Single Face to Industry website at https://acquisition.army.mil/asfi/, click on Contracting Opportunities and follow the directions or go to http://www.fedbizopps.gov, click on Go Find Business Opportunities and follow the directions.

Update #2 ·

Solicitation

Update #1 ·

The US Army Corps of Engineers, Pittsburgh District, has a requirement for Section 206, Aquatic Ecosystem Restoration at North Park Lake, Allegheny County, PA. The major features of the contract are identified below:

The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project will be separated into three constructions packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This synopsis is for Phase I only, which will be the only phase of the project solicited and awarded by the U.S. Army Corps of Engineers, Pittsburgh District.

Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area would create depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation will be specified in the Bid Schedule that will be released with the Solicitation. Excavation would be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) would be placed to provide cover for fish and to increase benthic production. Coir logs would be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including coir log plantings and surrounding shoreline plantings.

The magnitude of the project is between $1,000,000.00 and $5,000,000.00. This procurement will be advertised on an unrestricted basis. The Invitation for Bid (IFB) will be issued approximately June 2, 2009 on-line only through the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored. Requests must be made by registering for this solicitation at http://www.fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download the solicitation and drawings on or after the above issuance date. For additional contracting opportunities go to the Army Single Face to Industry website at https://acquisition.army.mil/asfi/, click on Contracting Opportunities and follow the directions or go to http://www.fedbizopps.gov, click on Go Find Business Opportunities and follow the directions.

Files

File Type Posted
BID RESULTS.doc DOC document
W911WN-09-B-0004-0005.pdf PDF
W911WN-09-B-0005-0005_Conformed Price Schedule.pdf PDF
W911WN-09-B-0005-0004.pdf PDF
W911WN-09-B-0005-0004_Conformed Price Schedule.pdf PDF
01 30 00.10.pdf PDF
W911WN-09-B-0005-0003.pdf PDF
33 11 00.pdf PDF
W911WN-09-B-0005-0003_Conformed Price Schedule.pdf PDF
02 30 00.pdf PDF
W911WN-09-B-0005-0002.zip ZIP file
01 45 00.pdf PDF
01 22 00.00 10.pdf PDF
W911WN-09-B-0005-0002.pdf PDF
W911WN-09-B-0005-0001.pdf PDF
01 57 23.00 15 Table 2.pdf PDF
NPL Site Visit Attendence Register.doc DOC document
W911WN-09-B-0005.zip ZIP file
Technical Specifications.pdf PDF
W911WN-09-B-0005.doc DOC document
Show all 20

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors