33 11 00.pdf

PDF 395 KB Posted

Attached to
North Park Lake Section 206 Aquatic Ecosystem Restoration
Solicitation number
W911WN09B0005
Issued by

About this file

Revised SECTION 33 11 00

View the file

Other files

File Type Posted
BID RESULTS.doc DOC document
W911WN-09-B-0004-0005.pdf PDF
W911WN-09-B-0005-0005_Conformed Price Schedule.pdf PDF
W911WN-09-B-0005-0004.pdf PDF
W911WN-09-B-0005-0004_Conformed Price Schedule.pdf PDF
02 30 00.pdf PDF
01 30 00.10.pdf PDF
W911WN-09-B-0005-0003.pdf PDF
W911WN-09-B-0005-0002.zip ZIP file
01 45 00.pdf PDF
01 22 00.00 10.pdf PDF
W911WN-09-B-0005-0003_Conformed Price Schedule.pdf PDF
W911WN-09-B-0005-0002.pdf PDF
W911WN-09-B-0005-0001.pdf PDF
01 57 23.00 15 Table 2.pdf PDF
NPL Site Visit Attendence Register.doc DOC document
Technical Specifications.pdf PDF
W911WN-09-B-0005.doc DOC document
W911WN-09-B-0005.zip ZIP file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Park Lake Section 206 Aquatic Ecosystem Restoration Project Phase I

SECTION TABLE OF CONTENTS

DIVISION 33 - UTILITIES

SECTION 33 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

1.1 SUMMARY

1.2 SUBMITTALS

1.3 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 TREE WOUND PAINT

PART 3 EXECUTION

3.1 PROTECTION

3.1.1 Roads and Walks

3.1.2 Trees, Shrubs, and Existing Facilities

3.1.3 Utility Lines

3.2 CLEARING

3.3 TREE REMOVAL

3.4 PRUNING

3.5 GRUBBING

3.6 DISPOSAL OF MATERIALS

3.6.1 Saleable Timber

3.6.2 Nonsaleable Materials

-- End of Section Table of Contents --

SECTION 33 11 00 Page 1 W911WN-09-B-0005 Revised by Amendment 0003

SECTION 33 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

1.1 SUMMARY

This section addresses the requirements for incidental clearing and grubbing activities under this contract at North Park Lake and the Wildwood Sediment Placement Area. Limits and extents of clearing and grubbing shall be approved by the Contracting Officer and Allegheny County prior to commencing clearing and grubbing operations.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Nonsaleable Materials; G, RE

Written permission to dispose of such products on private property shall be filed with the Contracting Officer.

SD-04 Samples

Tree wound paint

Samples in cans with manufacturer's label.

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver materials to store at the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.

PART 2 PRODUCTS

2.1 TREE WOUND PAINT

Bituminous based paint of standard manufacture specially formulated for tree wounds.

PART 3 EXECUTION

3.1 PROTECTION

3.1.1 Roads and Walks

Keep roads and walks free of dirt and debris at all times.

SECTION 33 11 00 Page 2

3.1.2 Trees, Shrubs, and Existing Facilities

Trees and vegetation to be left standing shall be protected from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.

3.1.3 Utility Lines

Protect existing utility lines that are indicated to remain from damage.

Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor shall be responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations.

3.2 CLEARING

Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 1-1/2 inches in diameter shall be painted with an approved tree wound paint.

3.3 TREE REMOVAL

Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph "Grubbing".

Trees shall be disposed of as specified in paragraph "Disposal of Materials".

3.4 PRUNING

Prune trees designated to be left standing within the cleared areas of dead branches 1 1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 1 1/4 inches in diameter with an approved tree wound paint.

3.5 GRUBBING

Grubbing shall consist of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Grubbing and grading of the lake shoreline shall be prohibited in areas where vegetation is established, and shall only be performed in shoreline areas where the shoreline is disturbed or barren, unless otherwise directed by the Contracting Officer. Material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, shall be removed to a depth of not less than 18 inches

SECTION 33 11 00 Page 3 below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground.

3.6 DISPOSAL OF MATERIALS

3.6.1 Saleable Timber

All timber noted for clearing and grubbing shall be removed from the project site and disposed of off-site by the Contractor, unless otherwise directed by the Contracting Officer.

3.6.2 Nonsaleable Materials

Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations shall be removed from the project site and disposed of at a properly permitted, commercially available disposal faciltiy or burned off-site at the Contractor's responsibility, except when otherwise directed in writing or directed by the Contracting Officer. Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed. Refuse to be burned shall be burned in a manner to prevent damage to existing structures and appurtenances, construction in progress, trees, and other vegetation. The Contractor shall be responsible for compliance with all Federal and State laws and regulations and with reasonable practice relative to the building of fires. Burning or other disposal of refuse and debris and any accidental loss or damage attendant thereto shall be the Contractor's responsibility.

-- End of Section --

SECTION 33 11 00 Page 4

33 11 00 - CLEARING AND GRUBBING
33 11 00 - CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SUMMARY
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 TREE WOUND PAINT
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
3.1.2 Trees, Shrubs, and Existing Facilities
3.1.3 Utility Lines
3.2 CLEARING
3.3 TREE REMOVAL
3.4 PRUNING
3.5 GRUBBING
3.6 DISPOSAL OF MATERIALS
3.6.1 Saleable Timber
3.6.2 Nonsaleable Materials