W911WN-09-B-0005-0001.pdf
PDF 32 KB Posted
- Solicitation number
- W911WN09B0005
About this file
Amendment 0001 is being issued to extend the bid due date to July 22 2009 at 1 00 pm to make a correction to the specification and to provide responses to questions received. **PLEASE NOTE THAT BLOCK 14 PAGE 1 OF THE SF30 ERRONEOUSLY STATES THAT THE BID DUE DATE IS REVISED TO JULY 15 2009 AT 1 00 PM. THE BID DUE DATE IS IN FACT REVISED TO JULY 22 2009 AT 1 00 PM.** Contractors are reminded that any questions are to be submitted in writing by fax or email. Additionally it is requested that.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| W911WN-09-B-0004-0005.pdf | ||
| W911WN-09-B-0005-0005_Conformed Price Schedule.pdf | ||
| W911WN-09-B-0005-0004.pdf | ||
| W911WN-09-B-0005-0004_Conformed Price Schedule.pdf | ||
| 02 30 00.pdf | ||
| 01 30 00.10.pdf | ||
| W911WN-09-B-0005-0003.pdf | ||
| W911WN-09-B-0005-0002.zip | ZIP file | |
| 01 45 00.pdf | ||
| 01 22 00.00 10.pdf | ||
| 33 11 00.pdf | ||
| W911WN-09-B-0005-0003_Conformed Price Schedule.pdf | ||
| W911WN-09-B-0005-0002.pdf | ||
| 01 57 23.00 15 Table 2.pdf | ||
| NPL Site Visit Attendence Register.doc | DOC document | |
| Technical Specifications.pdf | ||
| W911WN-09-B-0005.doc | DOC document | |
| W911WN-09-B-0005.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W81ET491191872
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
This amendment is being issued to extend the bid due date to July 15, 2009 at 1:00 pm, to make a correction to the specification, and to provide responses to questions received.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0005
X 9B. DATED (SEE ITEM 11)
03-Jun-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2009
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911WN
FACILITY CODECODE
EMAIL:TEL:
W911WN-09-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 08-Jul-2009 11:00 AM to 22-Jul-2009 01:00 PM.
The following changes are made to the specifications for the subject solicitation:
TABLE 2 – PLANTINGS ON AND ADJACENT TO COIR LOGS is hereby added to SECTION 01 57.23.00 15
TEMPORARY STORM WATER POLLUTION CONTROL AND FISH HABITAT STRUCTURES.
QUESTIONS AND ANSWERS
Q1: It seems that the following pages of drawings that are referenced either in the specifications and on the notes on the plans are not included. These are the apparent missing drawings: C-112, C-115, C-120, X-578. Please advise.
A1: Drawings C-112, C-115, and C-120 are not part of this contract; they are part of one of the two contracts to be awarded and administered by Allegheny County (County). Drawing X-578 is part of this contract and is verified to be included in the drawings available in the package posted on Fed Biz Opps (FBO).
Q2: What is the basis for payment for removal of the excavated material? Is it before and after survey?
A2: The basis of payment for the removal of the excavated material will be before and after surveys of the drained lakebed.
Q3: Who is the contact person for the county projects? Can contact information be provided?
A3: Steve Smallhoover is the contact person for County’s two contracts. He can be reached by email at: Steve.Smallhoover@AlleghenyCounty.US
Q4: What are the construction dates?
A4: Please refer to page 85 of 109 of the Solicitation, Section 00800, Paragraph 52.211-10 titled “Commencement, Prosecution, and Completion of Work”.
Q5: Is the lake going to be drained by others?
A5: Yes, the lake will be drained by County personnel prior to the start of construction activities. Please refer to Specification Section 01 30 00.10, Paragraph 1.11 titled “Operation of Government Facility” for further details.
Q6: Are there any non-work dates?
A6: Please refer to Specification Section 01 30 00.10, Paragraph 1.11.1 titled “Contractor’s Work Hours”.
Q7: What are the daily hours of work?
A7: Please refer to Specification Section 01 30 00.10, Paragraph 1.11.1 titled “Contractor’s Work Hours”.
Q8: Will the disposal facility management (a separate contract) take place in conjunction with the excavation operation?
A8: Yes, the disposal facility management will take place in conjunction with the excavation operation. Another forthcoming amendment will clarify this. The amendment is anticipated to be issued the week of July 8th.
Q9: Section 01 57 23.00 - reference is made to Table 2 in sections 2.12 and 3.9 (pgs 10 &
12) entitled Enhancement Vegetation. Where might I locate that table because it does not appear to be in the specs?
A9: TABLE 2 – PLANTINGS ON AND ADJACENT TO COIR LOGS is added to SECTION 01 57 23.00 15 via this amendment.
Q10: Reference is made to Sheet C-116. Please clarify that only the Aquatic Habitat Restoration Items within the Phase 1 Limits are to be included in this bid.
A10: Note 7 on Sheet C-116 specifies inwater habitat structure contract installation limits. In addition to these inwater structures, Section 00010 - Solicitation Contract Form of the
Solicitation specifies the inclusion of additional habitat restoration items and quantities for this contract.
Q11: Please clarify that all plantings on and adjacent to coir logs within both Phase I and Phase II limits of work are included in this contract. The installation of osprey nests is not included in this contract.
A11: Please refererence the answer provided for Q10 above.
Q13: Sheet V-101 shows three rectangular areas delineated as “Contractor Work Limits” within the Phase 2 Work Area. Please explain what work is performed in the Phase 1 Contract in these areas. How do we access these areas without constructing the Phase 2 Diversion Channels?
A13: Please reference the answer provided for Q10 above. The "Contractor Work Limit" areas are identifying areas related to the plantings within the Phase II area. These plantings are to be installed as shown on Sheet X-575; this can be done from the shoreline.
Q12: Please clarify the Scope of Work at the Wildwood Placement Area that is to be included in the Phase 1 Contract.
a. Sheet C-001 indicates that all site prep, including truck wash areas, rock construction entrances, access roads, clearing/grubbing and excavation of benches/keys and E&S work is in included in the Site Prep Contract.
b. Sheets C-358, C-359 & C-360 are not listed for Site Prep Contract in bottom left corner.
The only work shown on these sheets called out for the Site Prep Contract is the Access Road. Are we to excavate the benches/keys in Phase 1 Placement, or are they in already in place?
A12: For this contract, work at the Wildwood disposal site will consist only of the coordination and placement of excavated sediment. All other work related to the Wildwood site, including the spreading of sediment to final contours, will be the responsibility of the Site Prep contractor. An amendment is forthcoming that will further clarify this response.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .