W911WN-09-B-0005-0004_Conformed Price Schedule.pdf
PDF 272 KB Posted
- Solicitation number
- W911WN09B0005
About this file
Conformed Price Schedule. Bidders are requested to utilize this conformed price schedule in preparation and submission of bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.doc | DOC document | |
| W911WN-09-B-0004-0005.pdf | ||
| W911WN-09-B-0005-0005_Conformed Price Schedule.pdf | ||
| W911WN-09-B-0005-0004.pdf | ||
| 02 30 00.pdf | ||
| 01 30 00.10.pdf | ||
| W911WN-09-B-0005-0003.pdf | ||
| W911WN-09-B-0005-0002.zip | ZIP file | |
| 01 45 00.pdf | ||
| 01 22 00.00 10.pdf | ||
| 33 11 00.pdf | ||
| W911WN-09-B-0005-0003_Conformed Price Schedule.pdf | ||
| W911WN-09-B-0005-0002.pdf | ||
| W911WN-09-B-0005-0001.pdf | ||
| 01 57 23.00 15 Table 2.pdf | ||
| NPL Site Visit Attendence Register.doc | DOC document | |
| Technical Specifications.pdf | ||
| W911WN-09-B-0005.doc | DOC document | |
| W911WN-09-B-0005.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
BASE CONTRACT ITEMS
FFP
This Line Item is for Information only and should not be priced. Pricing information should be inserted in SubCLINs (0001AA - 0001CM) only.
FOB: Destination
PURCHASE REQUEST NUMBER: W81ET491191872
NET AMT
0001AA 1 Lump Sum
REIMBURSEMENT FOR ACTUAL PERFORMANCE
FFP
AND PAYMENT BONDS PREMIUMS, BASE CONTRACT (SEE SECTION
00800 PARAGRAPH 52.777-4020)
0001AB 12 Months
MONTHLY PROGRESS IMAGES
FFP
0001AC 1 Lump Sum
TRAFFIC CONTROL
0001AD 1 Lump Sum
CONSTRUCT LAKE ACCESS RAMPS/TRUCK WASH
FFP
STATIONS
0001AE 1 Lump Sum
INSTALL/RELIGN/REMOVE STREAM DIVERSION
FFP
NORTH FORK OF PINE CREEK, STAGE 1
0001AF 1 Lump Sum
INSTALL/REALIGN/REMOVE STREAM
FFP
DIVERSION, NORTH FORK OF PINE CREEK, STAGE II
0001AG 3 Each
INSTALL/REMOVE DIVERSION CHANNEL
FFP
CROSSING, NORTH FORK OF PINE CREEK
0001AH 1 Lump Sum
INSTALL/REALIGN/REMOVE STREAM
FFP
DIVERSION, PINE CREEK DAM AROUND INTAKE STRUCTURE, STAGE 1
0001AJ 1 Lump Sum
INSTALL/REALIGN/REMOVE STREAM DIVERSION
FFP
PINE CREEK DAM AROUND INTAKE STRUCTURE, STAGE II
0001AK 1 Lump Sum
INSTALL/REALIGN/REMOVE STREAM
FFP
DIVERSION, IRWIN RUN, STAGE I
0001AL 1 Lump Sum
INSTALL/REALIGN/REMOVE STREAM
FFP
DIVERSION, IRWIN RUN, STAGE II
0001AM 75,000 Cubic
Yard
LAKE SEDIMENT EXCAVATION AND REMOVAL
0001AN 80 Each
PORCUPINE CRIBS
0001AP 255 Each
PORCUPINE CRIB JUNIORS
0001AQ 90 Each
ROCK HUMPS
0001AR 90 Cubic
GRAVEL PLACEMENTS
0001AS 5,840 Linear
Foot
COIR LOGS
0001AT 363 Each
EMERGENT WETLAND PLANTINGS
FFP
CANADA BLUEJOINT
0001AU 363 Each
EMERGENT WETLAND PLANTINGS
FFP
LURID SEDGE
0001AV 363 Each
EMERGENT WETLAND PLANTINGS
FFP
FOX SEDGE
0001AW 363 Each
EMERGENT WETLAND PLANTINGS
FFP
FOWL MANNAGRASS
0001AX 363 Each
EMERGENT WETLAND PLANTINGS
FFP
SOFTRUSH
0001AY 242 Each
EMERGENT WETLAND PLANTINGS
FFP
GREAT BULLRUSH
0001AZ 363 Each
EMERGENT WETLAND PLANTINGS
FFP
WOOLGRASS
0001BA 242 Each
EMERGENT WETLANDS PLANTINGS
FFP
SWAMP MILKWEED
0001BB 242 Each
EMERGENT WETLAND PLANTINGS
FFP
NEW YORK ASTER
0001BC 363 Each
EMERGENT WETLAND PLANTINGS
FFP
BONESET
0001BD 121 Each
EMERGENT WETLAND PLANTINGS
FFP
SWAMP ROSE MALLOW
0001BE 242 Each
EMERGENT WETLAND PLANTINGS
FFP
CARDINAL FLOWER
0001BF 242 Each
EMERGENT WETLAND PLANTINGS
FFP
COMMON MONKEYFLOWER
0001BG 363 Each
EMERGENT WETLAND PLANTINGS
FFP
TALL CONEFLOWER
0001BH 363 Each
EMERGENT WETLAND PLANTINGS
FFP
BLUE VERAIN
0001BJ 242 Each
EMERGENT WETLAND PLANTINGS
FFP
NEW YORK IRONWEED
0001BK 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
SMOOTH ALDER
0001BL 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
BLACK CHOKE CHERRY
0001BM 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
BUTTONBUSH
0001BN 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
SILKY DOGWOOD
0001BP 11 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
RED-OSIER DOGWOOD
0001BQ 11 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
PANICLED DOGWOOD
0001BR 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
WINTERBERRY
0001BS 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
NINEBARK
0001BT 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
STEEPLEBUSH
0001BU 11 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
HIGHBUSH BLUBERRY
0001BV 11 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
COMMON ELDERBERRY
0001BW 23 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
NORTHERN ARROWOOD
0001BX 204 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
SWAMP MILKWEEK
0001BY 136 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
FRINGED SEDGE
0001BZ 272 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
COMMON RUSH
0001CA 204 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
CARDINAL FLOWER
0001CB 204 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
TALL CONEFLOWER
0001CC 68 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
NEW YORK ASTER
0001CD 68 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
BONESET
0001CE 204 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
THREE SQUARE
0001CF 3 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
BIG BLUESTEM
0001CG 3 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
CANADA BLUEJOINT
0001CH 4 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
FOX SEDGE
0001CJ 6 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
VIRGINIA WILD RYE
0001CK 6 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
SPREADING WITCHGRASS
0001CL 6 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
SWITCHGRASS
0001CM 1 Each
SHORELINE SCRUB-SHRUB PLANTINGS
FFP
BLUE VERAIN
0001CN 250 Linear
TEMPORARY LAKEBED CULVERTS
TEMPORARY CULVERT NO. 1 - 18-INCH HPDE
SUBCLIN 0001CP is added as follows:
0001CP 470 Linear
TEMPORARY LAKEBED CULVERTS
TEMPORARY CULVERT NO. 2 - 24-INCH HDPE
OPTION AWARDABLE OPTION A
FFP
This Line Item is for Information only and should not be priced. Pricing information should be inserted in SubCLINs (0002AA - 0002AB) only.
0002AA 1 Lump Sum
OPTION REIMBURSEMENT FOR ACTUAL
FFP
PERFORMANCE AND PAYMENT BONDS PREMIUMS, AWARDABLE
OPTION A (SEE SECTION 00800 PARAGRAPH 52.777-4020)
0002AB 25,000 Cubic
OPTION ADDITIONAL LAKE SEDIMENT EXCAVATION
AND REMOVAL (OPTION A)
OPTION AWARDABLE OPTION B
FFP
This Line Item is for Information only and should not be priced. Pricing information should be inserted in SubCLINs (0003AA - 0003AB) only.
0003AA 1 Lump Sum
OPTION REIMBURSEMENT FOR ACTUAL PERFORMANCE
FFP
AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION B (SEE
SECTION 00800 PARAGRAPH 52.777-4020)
0003AB 25,000 Cubic
AND REMOVAL (OPTION B)
OPTION AWARDABLE OPTION C
FFP
This Line Item is for Information only and should not be priced. Pricing information should be inserted in SubCLINs (0004AA - 0004AB) only.
0004AA 1 Lump Sum
OPTION REIMBURSEMENT FOR ACTUAL PERFORMANCE
FFP
AND PAYMENT BONDS PREMIUMS, AWARDABLE OPTION C (SEE
SECTION 00800 PARAGRAPH 52.777-4020)
0004AB 25,000 Cubic
AND REMOVAL (OPTION C)
TOTALS
Total, for Base Line Items 0001AA – 0001CP, Inclusive - $_____________________________
Total, for Awardable Option A Line Items 0002AA – 0002AB, Inclusive - $ _______________________
Total, for Awardable Option B Line Items 0003AA – 0003AB, Inclusive - $ ________________________
Total, for Awardable Option C Line Items 0004AA – 0004AB, Inclusive - $ ________________________
TOTAL, Base and Awardable Options A, B, and C (Line Items 0001AA through 0004AB), Inclusive
All extensions of the unit prices shown are subject to government verification.
Please do not round off totals. In case of variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .