ND FLAP SDN 7NE(1) Hoffer Lake Access

Closed Solicitation Posted

Solicitation number
6982AF25B000017
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
McClusky, North Dakota 58463, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is procuring roadway reconstruction and paving services for the Hoffer Lake Access Road improvement project in North Dakota under solicitation number 6982AF25B000017. The project scope includes widening and paving 1.06 miles of 7th Street NE from 5th Avenue NE through Hoffer Lake Park, with principal work items encompassing 6,000 cubic yards of roadway excavation, 6,000 tons of aggregate base, 3,500 tons of asphalt concrete pavement, and 8 miles of pavement markings. Key contract requirements include compliance with Davis-Bacon wage rates, Buy American requirements, Federal Acquisition Regulation (FAR) and Transportation Acquisition Regulation (TAR) standards, obtaining a separate NPDES permit for mobile asphalt and concrete plants, and providing a biologist for pre-construction nest surveys during nesting season. The contractor must also submit a Stormwater Pollution Prevention Plan (SWPPP), provide performance and payment bonds, and maintain a 24-foot pavement section with 11-foot lanes and 1-foot shoulders designed for a 25 MPH speed limit. The sealed bid opening occurred on November 19, 2025 at 1:30 p.m. MST in Lakewood, Colorado, with the anticipated notice to proceed issued by January 19, 2026, and project completion scheduled for October 16, 2026.

This solicitation is designated as a total small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction) with a small business size standard of $45 million in average annual gross receipts. Three contractors submitted bids: Construction Solutions Group, LLC from St. Louis, Missouri ($1,988,943.00), McKenzie Construction & Site Development, LLC from Washington, DC ($2,709,432.07), and Central Southern Construction Corp. from Jacksonville, Florida ($4,286,060.00), compared to an Engineer's Estimate of $2,311,000.00 to $2,420,000.00. The project is estimated to have a total value between $2,000,000 and $5,000,000, with the contractor required to commence work within ten calendar days of receiving the notice to proceed. The place of performance is McClusky, North Dakota in Sheridan County, with the project designed to enhance recreational opportunities at Hoffer Lake Park by improving road access and visitor experience while minimizing environmental impacts through careful grading and wetland considerations.

Notice text

PROJECT DESCRIPTION: 

The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue).

SCOPE OF THE WORK: 

The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park.  Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following:

  • Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone.
  • Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders).  This is consistent with other roads in the area and driver expectations.
  • With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts.
  • Remove reconditioning due to the project being 4R with earthwork.

PRINCIPAL WORK ITEMS:

  • 20401-0000 Roadway Excavation: 6,000 CUYD
  • 20441-0000 Waste: 3,952 CUYD
  • 30101-0000 Aggregate Base: 6,000 TON
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON
  • 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE
  • 63501-0000 Temporary Traffic Control: LPSM

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
ND FLAP SDN 7NE(1) Hoffer Lake Access This notice · Latest solicitation Solicitation
ND FLAP SDN 7NE(1) Hoffer Lake Access Pre-Solicitation
ND FLAP SDN 7NE(1) Hoffer Lake Access Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity