Amendment A001- 6982AF25B000017.pdf
PDF 483 KB Posted
- Attached to
- ND FLAP SDN 7NE(1) Hoffer Lake Access Federal contract opportunity
- Solicitation number
- 6982AF25B000017
About this file
This document is an Amendment to a federal solicitation for the ND FLAP SDN 7NE(1) Hoffer Lake Access Road project, issued by the Federal Highway Administration's Central Federal Lands Highway Division. The amendment specifically updates Section E (Special Contract Requirements) related to National Pollutant Discharge Elimination System (NPDES) permit requirements for the project. Key requirements include obtaining a separate NPDES permit for mobile asphalt and concrete plants, filing a Notice of Intent (NOI) after SWPPP approval, posting project authorization numbers, paying permit fees, and filing a Notice of Termination (NOT) when project conditions are met. The amendment includes a comprehensive Table 107-1 detailing NPDES permit information for multiple states, including effective dates, expiration dates, and regulatory review periods ranging from 2 to 60 days depending on the state.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidTabulationReport ND FLAP SDN 7NE(1) Hoffer Lake.pdf | ||
| Bid Opening Summary ND FLAP SDN 7NE(1) HOFFER LAKE.pdf | ||
| QnA ND FLAP SDN 7NE(1) Hoffer Lake 11 17 2025.pdf | ||
| Amendment A002- 6982AF25B000017.pdf | ||
| QnA ND FLAP SDN 7NE(1) Hoffer Lake 11 10 2025.pdf | ||
| ND FLAP SDN 7NE(1) PVMNT Report_AD.pdf | ||
| fp-24_0.pdf | ||
| ND FLAP SDN 7NE(1) Plans_AD_250903_100 signedsealed.pdf | ||
| 6982AF25B000017-IFB ND FLAP SDN 7NE(1) Hoffer Lake.pdf | ||
| Design Files.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IFB - Section E- Special Contract Requirement
1. Replace page E-8 with the attached amended page E-8
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ND FLAP SDN 7NE(1)10/09/2025
E-8
ND FLAP 7NE(1)
Hoffer Lake Access Road
Obtain a separate NPDES permit associated with industrial activity for mobile asphalt and concrete plants that provide material for the project. Provide a copy of the permit and acknowledgement letter to the CO.
(1) Notice of Intent (NOI). After the SWPPP is approved, file the NOI according to the applicable CGP as shown in Table 107-1. Allow the regulatory review period, shown in Table 107-1, from submittal of NOI to receipt of authorization of coverage under the CGP.
Provide a copy of the NOI and confirmation letter to the CO.
Post all project authorization numbers near the entrance to the site and on the bulletin board.
(2) Payment of permit fees. Submit the appropriate permit fees and renewal fees required for both the Contractor and Government to the regulatory agency.
(3) Notice of Termination (NOT). If applicable, file a NOT when the conditions listed in the CGP have been met or transfer the NOI to the maintaining agency after final acceptance.
Table 107-1 NPDES Permits
State / Agency Permit Number and Link Effective Date Expiration Date
Regulatory Review Period
Arizona AZG2020-001 7/1/2020 6/30/2025 30 days
California(1) 2022-0057-DWQ 9/1/2023 8/31/2028 7 days
Colorado (Federal)
COR10F000 2/17/2022 2/16/2027 14 days
Colorado (Other)
COR400000 4/1/2024 03/31/2029 10 days
Hawaii
HAR 11-55,
Appendix C
1/29/2024 1/29/2029 10 days
Indian Country XXR10I000 2/17/2022 2/16/2027 14 days
Kansas S-MCST-2208-1 12/1/2021 11/30/2026 60 days
Nebraska NER210000 12/1/2021 11/30/2026 7 days
Nevada NVR100000 1/5/2015 1/4/2020(2) 14 days
New Mexico NMR100000 2/17/2022 2/16/2027 14 days
North Dakota NDR11-0000 4/1/2025 3/31/2030 7 days
Oklahoma OKR10 10/18/2022 10/17/2027 14 days(3)
South Dakota SDR100000 11/1/2023 10/31/2028 15 days
Texas (Small)(4) TXR150000 3/5/2023 3/5/2028 2 days
Texas (Large) TXR150000 3/5/2023 3/5/2028 7 days
Utah UTRC00000 07/1/2024 06/30/2029 None
Wyoming (Small)(5)
WYR10-A000 9/11/2020 8/1/2025 None
Amendment A001 dated 10.9.2025 https://deq.nd.gov/publications/wq/2_NDPDES/Stormwater/Construction/NDR11per20250401F.pdf
File details come from the government source that posted it. Updated .