ND FLAP SDN 7NE(1) Hoffer Lake Access

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
6982AF25B000017
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
McClusky, North Dakota 58463, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking contractors for the Hoffer Lake Access project (ND FLAP SDN 7NE(1)) to improve recreational opportunities and enhance visitor experience at Hoffer Lake Park in North Dakota. The project involves widening and paving 1.06 miles of 7th Street NE from 5th Avenue NE through the park, reducing the design speed limit to 25 MPH within the park area and establishing 24-foot pavement sections with 11-foot lanes and 1-foot shoulders. The scope includes roadway excavation, waste removal, aggregate base installation, asphalt concrete pavement placement, pavement markings, and temporary traffic control measures, with work designed to minimize material import and wetland impacts by fitting primarily on the existing road bench. This is a pre-solicitation notice and not an invitation for bid, with plans and specifications not yet available. The anticipated timeline shows advertisement in September 2025, award and notice to proceed in November 2025, with contract completion scheduled for September 2026.

This opportunity is designated as a Total Small Business set-aside under NAICS code 237310 for Highway, Street, and Bridge Construction. The contract has an estimated total cost starting at $2,000,000, though the complete cost range was cut off in the notice. Principal work items include 6,000 cubic yards of roadway excavation, 3,952 cubic yards of waste removal, 6,000 tons of aggregate base, 3,500 tons of Type 1 asphalt concrete pavement, 8 miles of Type B solid pavement markings, and lump sum temporary traffic control. No incumbent contractors or current service providers were identified in this pre-solicitation notice. The project timeline spans approximately 10 months from contract award to completion, representing a significant infrastructure improvement initiative for the county park system.

Notice text

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

PROJECT NUMBER:ND FLAP SDN 7NE(1)

PROJECT NAME:Hoffer Lake Access

DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue).

SCOPE OF THE WORK:  The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park.  Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following:

  • Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone.
  • Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders).  This is consistent with other roads in the area and driver expectations.
  • With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts.
  • Remove reconditioning due to the project being 4R with earthwork.

PRINCIPAL WORK ITEMS:

  • 20401-0000 Roadway Excavation: 6,000 CUYD
  • 20441-0000 Waste: 3,952 CUYD
  • 30101-0000 Aggregate Base: 6,000 TON
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON
  • 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE
  • 63501-0000 Temporary Traffic Control: LPSM

ANTICIPATED SCHEDULE: 

Advertisement – September 2025

Award – November 2025

NTP – November 2025

Contract Completion – September 2026

ESTIMATED COST RANGE: 

Total estimated cost between $2,000,000 and $5,000,000

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
ND FLAP SDN 7NE(1) Hoffer Lake Access Latest solicitation Solicitation
ND FLAP SDN 7NE(1) Hoffer Lake Access This notice Pre-Solicitation
ND FLAP SDN 7NE(1) Hoffer Lake Access Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities