The document is a Questions and Answers file for the ND FLAP SDN 7NE(1) Hoffer Lake project, received on November 5 and 11, 2025. The Q&A covers critical project details including contractor requirements for personnel, biological monitoring, site conditions, and administrative procedures. Key points include: the contractor must provide a biologist for pre-construction nest surveys during nesting season, materials require testing, a Stormwater Pollution Prevention Plan (SWPPP) is mandatory, and no flaggers will be required for road work. The document clarifies that costs for certain activities like culvert placement and biological monitoring should be considered incidental to the work or covered under "Special Labor, Hired Technical Services". Amendment acknowledgment can be submitted via email, and contractors should refer to specific sections of the FP-24 and SCR's for detailed requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for ND FLAP SDN 7NE(1) Hoffer Lake
Received November 5, 2025
Questions Answers 1 Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Refer to FP-24 Section’s 153.04 for Quality Control Manager Requirements.
2 Are there any phasing requirements? No 3 Will the Government pre-approve commercial aggregate sources, or must each Contractor-proposed pit undergo full material testing and submittal prior to use?
Materials are required to be tested according to the contract.
4 Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Period of Performance is set by the contract documents. Deviations to period of performance are set by FAR section 52.211-13.
5 Please provide the site visit attendee sign-in sheet. A formal site visit was not conducted so there is no attendee sign-in sheet.
6 Is this project tax exempt? See 52.229-3 Federal, State, and Local Taxes clause 7 Are there any load restrictions for this project? No 8 Please advise what is to be priced for the bid schedule item
"SPECIAL LABOR, HIRED TECHNICAL SERVICES"
Unless Biological Monitor has been clearly determined that it is incidental to work, it is paid for under “Special Labor, Hired Technical Services”
9 Is it the contractor's responsibility to provide a Biologist? Yes 10 Within which line item are we to cover the costs of a Biologist? Unless Biological Monitor has been clearly determined that it is incidental to work, it is paid for under “Special Labor, Hired Technical Services” 11 Is it necessary for the biologist to be on site for the full duration? The biologist is only required to be on site to conduct pre-construction nest surveys if vegetation clearing occurs during the nesting season (per 107.10
(e) (1)). Once vegetation removal is complete, and if no nests were observed, a biologist is no longer required to be on site.
12 In the absence of a SWPPP plan do we need to account for silt fencing along the entirety of the project or is there a preferred erosion control material?
SWPPP is required. Must meet the permit requirements of the North Dakota CGP of no specific erosion control material type is preferred.
13 Per 156.06 in the SCR's we can shut the road down in alternate phases. Can you confirm flaggers will not be required for this project?
Flaggers will not be required.
14 Is there an anticipated start date? See page A-3 and Section 108 of the SCR’s.
Received November 11, 2025
15 On page A7 of the plan set there is a note (#3) to place culverts at the end of the approach roads, however there is no line on the pricing schedule for culverts. Where should this cost be included?
Work with no identified pay item should be considered incidental to the work per Section 109.05(b) of the FP -24. Material, installation, and testing requirements will be governed by determing section of the FP-24
16 Please confirm whether a revised proposal acknowledging Amendment 002 may be submitted via email, or if a new hard copy submission is required.
If a new hard copy is required, please confirm whether the original bid bond submitted with our initial proposal will still be accepted.
The acknowledgement of Amendment 002 can be submitted via email.
Please follow the instruction for Amendment acknowledgment instructions on page A-2.