Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912EP24B0004
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Saint Marys, Georgia 31558, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for a maintenance dredging project at the Naval Submarine Base Kings Bay in Camden County, Georgia. The work includes dredging various locations within the base to required depths ranging from 24 to 47 feet, with the dredged material to be placed at the Crab Island Disposal Area. The project also includes options for supplying additional weir riser boards, secondary maintenance dredging, and mobilization/demobilization for the secondary dredging. A site visit will be held on February 22, 2024, and a pre-bid conference will be conducted via teleconference on February 26, 2024. Interested parties must RSVP for the pre-bid conference by February 23, 2024. Bids are due by 1:00 PM EDT on April 16, 2024, with a virtual bid opening at 2:00 PM EDT the same day.
The solicitation is a small business set-aside issued by the Department of the Army Corps of Engineers Engineering District Jacksonville. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction) and the PSC code is Y1DJ (Dredging Services). The government estimate for the total bid, including the base and all options, is $15,537,250. The place of performance is St Marys, Georgia.
Notice text
4 versions
Update #4 · Latest ·
DESCRIPTION OF WORK: This project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.LOCATION REQUIRED DEPTHRange H to I and Upper Turning 45-foot UTB, 45-foot and 47-footBasin (UTB)Range G to H and Explosive 44-foot and 47-footHandling Basin (EHB)Range E to G and Magnetic 44-footSilencing Facility (MSF) NorthSite Six North (SS-N) 39-footSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footSmall Boat Basin 24-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring Facilityb. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.LOCATION REQUIRED DEPTHSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeSite Six North (SS-N) 39-footExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring FacilityOption C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.
Update #3 ·
DESCRIPTION OF WORK: This project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.LOCATION REQUIRED DEPTHRange H to I and Upper Turning 45-foot UTB, 45-foot and 47-footBasin (UTB)Range G to H and Explosive 44-foot and 47-footHandling Basin (EHB)Range E to G and Magnetic 44-footSilencing Facility (MSF) NorthSite Six North (SS-N) 39-footSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footSmall Boat Basin 24-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring Facilityb. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.LOCATION REQUIRED DEPTHSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeSite Six North (SS-N) 39-footExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring FacilityOption C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.
Update #2 ·
A site visit will be held on 22 February 2024 at 10:00 AM, EST. Participants should contact Jen Tyler at 561-379-2854 or Jennifer.L.Tyler@usace.army.mil by Thursday, February 15, 2024 to coordinate base access.
A Pre-Bid Conference will be held via teleconference on 26 February 2024 @ 10:00am EDT. The call-in number is: 1-844-800-2712, the Access Code is: 199 262 9798 and the link to be utilized is as follows: https://usace1.webex.com/meet/timothy.g.humphrey. It is requested that an email be sent to Guesley.Leger@usace.army.mil no later than 23 February 2024 at 3:00 PM, EST to confirm attendance by your organization.
DESCRIPTION OF WORK: This project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.LOCATION REQUIRED DEPTHRange H to I and Upper Turning 45-foot UTB, 45-foot and 47-footBasin (UTB)Range G to H and Explosive 44-foot and 47-footHandling Basin (EHB)Range E to G and Magnetic 44-footSilencing Facility (MSF) NorthSite Six North (SS-N) 39-footSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footSmall Boat Basin 24-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring Facilityb. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.LOCATION REQUIRED DEPTHSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeSite Six North (SS-N) 39-footExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring FacilityOption C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.
Update #1 ·
A site visit will be held on 22 February 2024 at 10:00 AM, EST. Participants should contact Jen Tyler at 561-379-2854 or Jennifer.L.Tyler@usace.army.mil by Thursday, February 15, 2024 to coordinate base access.
A Pre-Bid Conference will be held via teleconference on 26 February 2024 @ 10:00am EDT. The call-in number is: 1-844-800-2712, the Access Code is: 199 262 9798 and the link to be utilized is as follows: https://usace1.webex.com/meet/timothy.g.humphrey. It is requested that an email be sent to Guesley.Leger@usace.army.mil no later than 23 February 2024 at 3:00 PM, EST to confirm attendance by your organization.
DESCRIPTION OF WORK: This project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.LOCATION REQUIRED DEPTHRange H to I and Upper Turning 45-foot UTB, 45-foot and 47-footBasin (UTB)Range G to H and Explosive 44-foot and 47-footHandling Basin (EHB)Range E to G and Magnetic 44-footSilencing Facility (MSF) NorthSite Six North (SS-N) 39-footSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footSmall Boat Basin 24-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring Facilityb. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.LOCATION REQUIRED DEPTHSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeSite Six North (SS-N) 39-footExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring FacilityOption C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia | Award Notice | |
| St. Johns County Sea Turtle Environmental Monitoring and Post-Construction Surveys | Special Notice | |
| This notice | Solicitation | |
| Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia | Pre-Solicitation | |
| Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity