Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites
Open Pre-Solicitation Posted
- Solicitation number
- W912HN27S5000
- Agency
-
ENDIST Savannah
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Savannah District Corps of Engineers is conducting a sources sought for FY26 Atlantic Intracoastal Waterway maintenance dredging at select sites, with responses due November 20, 2026. This is market research only and does not obligate the Government to issue a solicitation or award a contract.
Work encompasses maintenance and unclassified dredging on AIWW sections Hell Gate and Florida Passage in Chatham County, Georgia and Fields Cut in Jasper County, South Carolina. The federally maintained channel is authorized to 12 feet deep MLLW with widths of 90 feet in land cuts and 150 feet in natural waterways. Hell Gate is to be dredged to authorized width of 150 feet and depth of 12 feet; options include dredging Florida Passage. The Corps traditionally performs this work with a hydraulic cutterhead dredge, though other methods will be considered.
Estimated contract value is between $5 million and $10 million. Performance duration is five months (165 days) from Notice to Proceed. The requirement includes furnishing personnel, transportation, mobilization and demobilization, equipment, and materials. NAICS 237990 (Other Heavy and Civil Engineering Construction) applies, with a size standard of $45 million. No set-aside is anticipated. Information submitted will inform market research and procurement strategy.
Notice text
THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000. The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed. The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve (12) feet deep MLLW with widths from ninety (90) feet in land cuts and one hundred fifty (150) feet in natural waterways. Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet. Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway. Sediment dredged from Hell Gate may be pumped approximately four (4) miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar. Sediment dredged from Florida Passage may be pumped approximately nine (9) miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar. Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST). Any questions should be emailed to the Contract Specialist, Rohan Bryan at Rohan.A.Bryan@usace.army.mil or Contracting Officer, Preston Jones at Preston.E.Jones@usace.army.mil.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 | ENDIST New Orleans | No set-aside | |
| Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 | ENDIST New Orleans | No set-aside | |
| Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging | ENDIST Wilmington | No set-aside | |
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| Atchafalaya river BAY, bar, and crewboat cut cutterhead dredge NOS. 3-2026, OM26061 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity