This document is an Abstract of Bids for Solicitation Number W912EP24B0004, titled "Naval Submarine Base Kings Bay, Maintenance Dredging 44, 45, and 47-Foot Project, Camden County, Georgia."

The project involves maintenance dredging at various locations within the Naval Submarine Base Kings Bay to required depths ranging from 24 feet to 47 feet, with the dredged material to be placed at Disposal Area Crab Island. The solicitation includes a base bid as well as optional items such as additional field-cut weir riser boards, secondary maintenance dredging, and mobilization/demobilization for the secondary dredging. The solicitation was issued on February 7, 2024, with bids due by April 16, 2024. The document provides a detailed bid tabulation with unit prices and total bid amounts for the seven offerors. The government estimate for the total bid, including the base and all options, is $15,537,250.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 OFFERS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7

OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 3 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE (ENTRANCE CHANNEL)

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB 2,670,000.00 $2,670,000.00 1,950,000.00 $1,950,000.00 1,572,900.00 $1,572,900.00 2,779,380.42 $2,779,380.42 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED, RANGE H TO I

AND UPPER TURNING BASIN STATION 43+300 TO STATION 48+175 (ESTIMATED QUANTITY - SEE NOTE 2)

295,000 CUBIC YARD

6.85 $2,020,750.00 5.10 $1,504,500.00 5.13 $1,513,350.00 3.00 $885,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; RANGE G TO H

AND EXPLOSIVE HANDLING BASIN STATION 39+141 TO STATION

43+300 (ESTIMATED QUANTITY - SEE NOTE 2)

450,000 CUBIC YARD

6.70 $3,015,000.00 3.90 $1,755,000.00 3.79 $1,705,500.00 2.95 $1,327,500.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; RANGE E TO G

AND MAGNETIC SILENCING FACILITY (MSF) NORTH STATION 31+800

TO STATION 39+141 (ESTIMATED QUANTITY - SEE NOTE 2)

150,000 CUBIC YARD

12.10 $1,815,000.00 7.50 $1,125,000.00 7.73 $1,159,500.00 5.00 $750,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX NORTH

STATION 36+850 TO STATION 38+800 (ESTIMATED QUANTITY - SEE

NOTE 2)

50,000 CUBIC YARD

7.75 $387,500.00 5.00 $250,000.00 4.93 $246,500.00 4.25 $212,500.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX SOUTH

AND ARDM YOKE; STATION 34+233.1 TO STATION 36+548; (ESTIMATED

QUANTITY - SEE NOTE 2)

20,000 CUBIC YARD

12.80 $256,000.00 12.00 $240,000.00 13.39 $267,800.00 6.00 $120,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; EXPLOSIVE

HANDLING WHARVES (EHW) STATION 41+420 TO STATION 43+320

(ESTIMATED QUANTITY - SEE NOTE 2)

45,000 CUBIC YARD

11.70 $526,500.00 10.00 $450,000.00 12.95 $582,750.00 10.25 $461,250.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; REFIT WHARVES

STATION 45+850.4 TO STATION 48+175 (ESTIMATED QUANTITY - SEE

NOTE 2)

20,000 CUBIC YARD

12.85 $257,000.00 12.00 $240,000.00 11.26 $225,200.00 8.50 $170,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; SMALL BOAT

BASIN STATION 43+497.5 TO STATION 45+207.1 (ESTIMATED QUANTITY

- SEE NOTE 2)

30,000 CUBIC YARD

11.05 $331,500.00 5.00 $150,000.00 9.69 $290,700.00 9.00 $270,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; DRY DOCK

CAISSON GATE SILL AND DRY DOCK CAISSON GATE MOORING

FACILITY

1 JOB

46,000.00 $46,000.00 40,000.00 $40,000.00 30,000.00 $30,000.00 45,000.00 $45,000.00 $0.00 $0.00 $0.00 $0.00 0011 BIRD MONITORING 1 JOB 198,000.00 $198,000.00 15,000.00 $15,000.00 21,000.00 $21,000.00 20,000.00 $20,000.00 $0.00 $0.00 $0.00 $0.00

STANDBY TIME (ESTIMATED QUANTITY

- SEE NOTE 3)

120 HOURS

1,300.00 $156,000.00 1,500.00 $180,000.00 2,000.00 $240,000.00 3,000.00 $360,000.00 $0.00 $0.00 $0.00 $0.00

0013 PARTNERING REGROUP 1 EACH 8,000.00 $8,000.00 2,500.00 $2,500.00 5,000.00 $5,000.00 3,500.00 $3,500.00 $0.00 $0.00 $0.00 $0.00 TOTAL BASE (LINE ITEMS 0001 THROUGH 0013) $11,687,250.00 $7,902,000.00 $7,860,200.00 $7,404,130.42 $0.00 $0.00 $0.00 $0.00

OPTION A

0014 FIELD-CUT WEIR RISER BOARDS (ESTIMATED QUANTITY) 200 EACH 39.00 $7,800.00 20.00 $4,000.00 30.00 $6,000.00 45.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 TOTAL OPTION A (LINE ITEM 0014) $7,800.00 $4,000.00 $6,000.00 $9,000.00 $0.00 $0.00 $0.00 $0.00 TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0014) $11,695,050.00 $7,906,000.00 $7,866,200.00 $7,413,130.42 $0.00 $0.00 $0.00 $0.00

OPTION B

EXCAVATION, UNCLASSIFIED; SITE SIX SOUTH AND ARDM YOKE

STATION 34+233.1 TO STATION 36+548 (ESTIMATED QUANTITY - SEE

NOTE 2)

15,000 CUBIC YARD

15.75 $236,250.00 10.00 $150,000.00 13.40 $201,000.00 10.00 $150,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX NORTH STATION 36+850 TO

STATION 38+800 (ESTIMATED QUANTITY - SEE NOTE 2)

35,000 CUBIC YARD

8.85 $309,750.00 5.25 $183,750.00 5.10 $178,500.00 8.00 $280,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; EXPLOSIVE HANDLING WHARVES

(EHW) STATION 41+420 TO STATION 43+320 (ESTIMATED QUANTITY -

SEE NOTE 2)

20,000 CUBIC YARD

12.90 $258,000.00 12.00 $240,000.00 14.54 $290,800.00 10.50 $210,000.00 $0.00 $0.00 $0.00 $0.00

E XCAVATION, UNCLASSIFIED; REFIT WHARVES STATION 45+850.4 TO

STATION 48+175 (ESTIMATED QUANTITY - SEE NOTE 2)

20,000 CUBIC YARD

12.85 $257,000.00 10.00 $200,000.00 11.26 $225,200.00 12.00 $240,000.00 $0.00 $0.00 $0.00 $0.00

EXCAVATION, UNCLASSIFIED; DRY DOCK CAISSON GATE SILL AND

DRY DOCK CAISSON GATE MOORING FACILITY

1 JOB

46,000.00 $46,000.00 30,000.00 $30,000.00 30,000.00 $30,000.00 60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00

0020 BIRD MONITORING 1 JOB 34,000.00 $34,000.00 2,000.00 $2,000.00 5,000.00 $5,000.00 10,000.00 $10,000.00 $0.00 $0.00 $0.00 $0.00 0021 STANDBY TIME (SEE NOTE 3) 24 HOURS 1,300.00 $31,200.00 1,500.00 $36,000.00 2,000.00 $48,000.00 3,000.00 $72,000.00 $0.00 $0.00 $0.00 $0.00

TOTAL OPTION B (LINE ITEMS 0015 THROUGH 0021) $1,172,200.00 $841,750.00 $978,500.00 $1,022,000.00 $0.00 $0.00 $0.00 $0.00 TOTAL BASE PLUS OPTIONS A AND B (LINES 0001 THROUGH 0021) $12,867,250.00 $8,747,750.00 $8,844,700.00 $8,435,130.42 $0.00 $0.00 $0.00 $0.00

OPTION C

0022 MOBILIZATION AND DEMOBILIZATION (SEE NOTE 4) 1 JOB 2,670,000.00 $2,670,000.00 900,000.00 $900,000.00 790,000.00 $790,000.00 2,527,751.80 $2,527,751.80 $0.00 $0.00 $0.00 $0.00 TOTAL OPTION C (LINE ITEMS 0022) $2,670,000.00 $900,000.00 $790,000.00 $2,527,751.80 $0.00 $0.00 $0.00 $0.00 TOTAL BID (LINE ITEMS 0001 THROUGH 0022) $15,537,250.00 $9,647,750.00 $9,634,700.00 $10,962,882.22 $0.00 $0.00 $0.00 $0.00

ABSTRACT OF OFFERS - CONSTRUCTION

SOLICITATION NUMBER: W912EP24B0004

DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

NAME AND TITLE OF CERTIFYING OFFICIAL:

ISSUING OFFICE

February 7, 2024 April 16, 2024

Manuela Voicu, Contracting Officer

Signature Date Signed: 16 April 2024

IGE OFFERS (Continued)

PROJECT TITLE

NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING 44, 45, AND 47-FOOT

PROJECT, CAMDEN COUNTY, GEORGIA

Original Government Estimate

Cottrell Contracting Corporation Southern Dredging Ahtna Marine and Construction

Company

Yes Yes

Yes Yes Yes

Yes