Military construction project (MILCON) P1062 design-bid-build, dry dock 3 modernization, norfolk naval shipyard, portsmouth, virginia

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
N6247024R0062
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Portsmouth, Virginia 23709, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy's Naval Facilities Engineering Command is seeking a Design-Bid-Build contractor for the MILCON P1062 Dry Dock 3 Modernization project at Norfolk Naval Shipyard in Portsmouth, Virginia. The project is part of the Shipyard Infrastructure Optimization Program (SIOP) and involves comprehensive modernization of the dry dock, including rebuilding caisson seats, refurbishing dock floors and walls, constructing a wet well and pump house, rerouting utilities, and replacing rail systems. The solicitation (N62470-24-R-0062) will be issued by NAVFAC Atlantic on or after February 28, 2025, as an unrestricted competition using a best value trade-off evaluation methodology. All potential offerors must be registered in the System for Award Management (SAM) and will need to complete NNSY badge request documents for the site visit. The evaluation will consider various factors to determine the most advantageous proposal for the government.

The contract is an unrestricted competition with no specific small business set-aside, despite initial market research targeting small businesses. Initial industry engagement included an industry day with 90 attendees and a Sources Sought notice, but only one small business responded, leading to the decision for an open competition. The project's magnitude exceeds $500 million, with a performance period of 1,825 calendar days and a NAICS code of 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45 million. Contract award is anticipated in Q1 FY26, and the project involves complex engineering work such as installing a temporary cofferdam with steel pipe pile walls, reconstructing dock floors and walls with reinforced concrete, and selective demolition of existing infrastructure. The scale and complexity of the project suggest a significant investment in modernizing critical naval shipyard infrastructure.

Notice text

Please refer to the attached Pre-solicittion notice titled PRE-SOL NOTICE 1-2-13-25 - Final.

Files

File Type Posted
PRE-SOL NOTICE 1-2-13-25 - Final.pdf PDF

Notice history

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors