Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F21B0012
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Randolph, Nebraska 68771, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for Phase 2 of the Middle Logan Creek Flood Risk Management Project in Randolph, Nebraska. The U.S. Army Corps of Engineers Omaha District will excavate and widen approximately 550 feet of the existing creek channel, install grade controls and erosion protections, remove and replace three bridges, realign roads, and install fencing, pavement and utilities. Contractors must attend a mandatory site visit on July 27, 2021 to be eligible to submit a response, which are due no later than August 20, 2021 and will be evaluated for award without discussions to the offeror providing the most advantageous price.

This is a set-aside for Service-Disabled Veteran-Owned Small Businesses. The primary NAICS code is 237110 and PSC code is R499. The estimated value is between $5-10 million to be completed over an unspecified period of performance in Randolph, Nebraska. Bids were received from five contractors ranging from $6.2-$8.9 million. The U.S. Army Corps of Engineers District Office in Omaha will administer the contract to reduce flood risks along 550 feet of Middle Logan Creek.

Notice text

Site Visit has been scheduled for Tuesday, 27 July 2021 at 10:00 am local time.

Participants will meet at 212 East Broadway, Randolph, NE (City Offices of Randolph). Contractors interested in seeing the site need to make reservation with Todd Tobias telephone (402) 650-0358 or by e-mail at Todd.R.Tobias@usace.army.mil.

The flood risk reduction project is along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 550-feet upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes Road bridge. The work in general comprises:

1) Earthwork/grading for the realigned and widened Middle Logan Creek channel - excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel.

2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section.

3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 

4) New and extended storm drain structures.

5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges.

6) Removal of a 42-foot long pedestrian bridge, not to be replaced.

7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge.

8) Shoo flybridge detour for 558th Ave bridge construction.

9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and

10) Installation of a new sanitary sewer siphon system and four domestic waterlines.
 

Files

Show all 14

Notice history

Notice Type Posted
Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE Award Award Notice
This notice Latest solicitation Solicitation
Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors