Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE

Awarded Award Notice Posted

Solicitation number
8156
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Awarded
to Iron Mike Construction LLC
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
W9128F22C0008 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1QA Construction Of Restoration Of Real Property (Public Or Private)
Place of performance
Randolph, Nebraska 68771, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Award Notice from the Department of the Army Corps of Engineers Engineering District Omaha awarded a contract to Iron Mike Construction LLC for $7,996,440.40 on March 1, 2022. The contract is for flood risk reduction along Middle Logan Creek in Randolph, Nebraska, including earthwork to widen and realign the creek channel, bridge removals and replacements, roadway realignments, fencing, paving, and installation of a sanitary sewer siphon system and domestic waterlines.

Notice text

The flood risk reduction project is along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 550-feet upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes Road bridge. The work in general comprises:

1)    Earthwork/grading for the realigned and widened Middle Logan Creek channel -excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel.
2)    Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section.
3)    Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc.
4)    New and extended storm drain structures.
5)    Removal and replacement of Main St., Douglas St., and 558th Ave bridges.
6)    Removal of a 42-foot long pedestrian bridge, not to be replaced.
7)    Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge.
8)    Shoo flybridge detour for 558th Ave bridge construction.
9)    New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and
10)    Installation of a new sanitary sewer siphon system and four
domestic waterlines.

Awarded contract W9128F22C0008 to Iron Mike Construction Llc for 7996440.40 on 2022-03-01.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE This notice · Award Award Notice
Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE Latest solicitation Solicitation
Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity