ATCH 4. Randolph Dwgs - 3 OF 3.pdf
PDF 29 MB Posted
- Solicitation number
- W9128F21B0012
About this file
This document provides details on a federal contract opportunity for flood risk management work along the Middle Logan Creek in Randolph, Nebraska. The solicitation is for excavating and widening an approximately 550-foot stretch of the existing creek channel to a 40-foot bottom width and 95-foot top width with 3:1 side slopes and a 5-foot low flow channel. Additional work includes transitioning to the widened channel, installing grade control and erosion protection, extending and replacing bridges and drainage structures, roadway realignment, and installing fencing, pavement and utility infrastructure. A mandatory site visit will be held on July 27, 2021. Interested contractors must RSVP with contact information provided. The opportunity is issued by the Department of the Army Corps of Engineers Omaha District.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
BAR NUMBER
BAR SIZE
A413 A 4 13
REINFORCING BAR MARKS
2. THESE BRIDGES ARE DESIGNED FOR A FUTURE WEARING SURFACE OF 20 PSF.
SPECIFICATIONS, EIGHTH EDITION.
1. THESE BRIDGES ARE DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN
DESIGNER NOTES:
N = APPROACH SLAB & CONCRETE RAIL ON APPROACH SLAB
S = BRIDGE SLAB & CONRETE RAIL ON BRIDGE
B = BENT
A = ABUTMENT
TYPE OF BRIDGE ELEMENT
AND SHOWN ON THE DRAWINGS WILL BE OBTAINED AT ALL POINTS ON THE SLAB.
SUFFICIENT NUMBER OF LOCATIONS TO DEMONSTRATE THAT CONCRETE COVER OVER THE REINFORCING STEEL AS REQUIRED
SUCH CHECKING SHALL BE DONE BY THE CONTRACTOR IN THE PRESENCE OF THE COR AND SHALL BE REPEATED AT A
FOR CLEARANCE TO THE SURFACE OF THE SLAB BY MEASURING FROM THE REINFORCING STEEL TO THE STRIKE-OFF SCREED.
4. BEFORE PLACING CONCRETE FOR BRIDGE FLOORS, THE PLACEMENT OF TOP REINFORCING STEEL SHALL BE CHECKED
PROVIDE A DESCRIPTION OF THE LOCATION OF EACH PHOTOGRAPH BY SPAN OR BENT NUMBER.
OF THE REINFORCING PRIOR TO CONCRETE PLACEMENT. PROVIDE IMAGE FILES OF THE PHOTOGRAPHS TO THE COR.
3. THE CQC SHALL ALSO TAKE HIGH RESOLUTION PHOTOGRAPHS OF SUFFICIENT NUMBER TO COVER THE ENTIRE AREA
IN THE SLAB.
CHECKLIST SHALL BE PROVIDED TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) PRIOR TO PLACING CONCRETE
DEFICIENCIES SHALL BE CORRECTED PRIOR TO INITIALING APPROVAL OF THAT BAR MARK. A COPY OF THE COMPLETED
BAR MARK TO INDICATE THAT ALL BARS OF THAT MARK ARE THE CORRECT SIZE, SPACING AND LOCATION. ANY
2. THE APPROVED REINFORCING ERECTION DRAWINGS SHALL BE USED AS A CHECKLIST. THE CQC SHALL INITIAL EACH
CONTROL PERSONNEL (CQC) SHALL PERFORM A SPECIAL INSPECTION OF THE SLAB REINFORCING.
1. AFTER ALL REINFORCING BARS FOR THE BRIDGE SLAB HAVE BEEN SECURELY PLACED, THE CONTRACTOR'S QUALITY
SPECIAL INSPECTION OF BRIDGE SLAB REINFORCING
BRIDGES - GENERAL NOTES
COR 30 CALENDAR DAYS NOTICE PRIOR TO COMPLETION OF THE BRIDGE.
INSPECTION WILL BE PERFORMED BY OTHERS AFTER BRIDGE CONSTRUCTION IS ESSENTIALLY COMPLETE. PROVIDE THE
MINIMUM COMPRESSIVE STRENGTH OF 3500 PSI, AND THE INITIAL BRIDGE INSPECTION HAS BEEN COMPLETED. THE INITIAL
THE BRIDGE SHALL NOT BE OPENED UNTIL THE CONCRETE HAS REACHED A MINIMUM AGE OF 17 DAYS AND DEVELOPED A
12. THE CONTRACTOR SHALL NOT OPEN THE BRIDGE FLOOR TO TRAFFIC UNTIL APPROVAL HAS BEEN GIVEN BY THE COR.
THE 10 DAYS WET CURING PERIOD.
DECKS UNTIL THE DECK CONCRETE HAS REACHED 80% OF THE SPECIFIED MINIMUM COMPRESSIVE STRENGTH AND AFTER
A COMPRESSIVE STRENGTH OF AT LEAST 2.4 KSI. LOADS IN EXCESS OF THE ABOVE SHALL NOT BE CARRIED ON BRIDGE
AND EQUIPMENT LOADS, MAY BE ALLOWED ON ANY SPAN ONLY AFTER THE LAST PLACED DECK CONCRETE HAS ATTAINED
VEHICLES NEEDED FOR CONSTRUCTION ACTIVITIES AND WEIGHING LESS THAN 4.0 KIPS, AND COMPARABLE MATERIALS
11. CONSTRUCTION EQUIPMENT WILL NOT BE ALLOWED ON THE DECK UNTIL AFTER THE 10 DAY WET CURING PERIOD.
SUPPORTING THE ROADWAY SLAB HAS BEEN RELEASED.
10. CAST-IN-PLACE CONCRETE RAILINGS SHALL NOT BE PLACED ON CONCRETE SLAB BRIDGES UNTIL THE FALSEWORK
03 11 00 "CONCRETE FORMS AND FALSEWORK" PARAGRAPH "EVIDENCE OF CONCRETE STRENGTH."
STRENGTH OF 70% OF THE SPECIFIED COMPRESSIVE STRENGTH AS DETERMINED ACCORDANCE WITH SPECIFICATIONS SECTION
NOT BE ALLOWED TO BEAR ON THE SUBSTRUCTURE UNTIL THE SUBSTRUCTURE'S CONCRETE HAS ATTAINED A COMPRESSIVE
FORMS HAVE BEEN STRIPPED AND THE CONCRETE INSPECTED FOR DEFECTS. THE LOAD OF THE SUPERSTRUCTURE SHALL
9. CONCRETE SLABS SHALL NOT BE PLACED ON THE SUPERSTRUCTURE UNTIL ALL SUBSTRUCTURE (ABUTMENTS AND BENTS)
8. WATER JETTING SHALL NOT BE PERMITTED FOR EXCAVATION OR BACKFILLING AROUND STRUCTURES.
STRENGTH REQUIREMENTS PRIOR TO REMOVAL OF FORMS AND FALSEWORK.
7. SEE SPECIFICATION SECTION 03 11 00 "CONCRETE FORMS AND FALSEWORK" FOR MINIMUM CURE TIMES AND/OR
SPECIFIED COMPRESSIVE STRENGTH.
TO THE FULL HEIGHT UNTIL THE SUPERSTRUCTURE (BRIDGE SLAB) HAS BEEN PLACED AND CURED TO 70% OF
6. BACKFILL ABUTMENTS AND WINGWALLS CONCURRENTLY ON ALL SIDES. ABUTMENTS SHALL NOT BE BACKFILLED
SECTION 09 90 00 "PAINTING METAL SHEET PILING."
5. PAINT THE INDICATED AREAS OF SHEET PILE WINGWALLS IN ACCORDANCE WITH SPECIFICATION
4. CONCRETE SHALL BE FILLETED OR CHAMFERED APPROXIMATELY 3/4 INCH AT ALL EXPOSED CORNERS.
3. UNLESS NOTED AS "OPTIONAL" ALL CONSTRUCTION JOINTS SHOWN ARE MANDATORY.
VERTICAL CURVE OR ROADWAY CROSS SLOPE.
2. ALL DIMENSIONS SHOWN ARE IN HORIZONTAL PLANE ONLY. NO ALLOWANCES HAVE BEEN MADE FOR
REINFORCING BAR SHALL BE 3'', EXCEPT WHERE OTHERWISE NOTED.
1. THE MINIMUM CLEARANCE, MEASURED FROM THE FACE OF THE CONCRETE TO THE SURFACE OF ANY
CONSTRUCTION NOTES:
AND ALL OTHER HARDWARE SHALL BE GALVANIZED ACCORDING TO ASTM A123/A123M.
10. AFTER FABRICATION, TIE RODS, TURNBUCKLES, NOSE ANGLES AT THE BENTS, FLOOR DRAINS
DRAINS SHALL CONFORM TO ASTM A29/A29M, GRADES 1010 THROUGH 1020 AND AWS D1.1/D1.1M, TABLE 7.1, TYPE B.
STEEL PLATES FOR FLOOR DRAINS SHALL CONFORM TO ASTM A36. HEADED, WELDED STUDS FOR FLOOR
9. HOLLOW STRUCTURAL SHAPES (HSS) FOR FLOOR DRAINS SHALL CONFORM TO ASTM A500/A500M GRADE B.
TO ASTM A668/A668M CLASS C.
8. TIE RODS SHALL CONFORM TO ASTM A709/709M, GRADE 36 STEEL. TURNBUCKLES SHALL CONFORM
7. STEEL SHEET PILE SHALL CONFORM TO ASTM A328/A328M.
6. STRUCTURAL STEEL FOR ALL H-PILES SHALL CONFORM TO ASTM A709/A709M, GRADE 50.
5. ALL STRUCTURAL STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A709/A709M, GRADE 36.
WRITTEN PERMISSION OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. SPLICES OF REINFORCEMENT OTHER THAN THOSE INDICATED SHALL NOT BE PERMITTED WITHOUT
REQUIREMENTS OF ASTM A615/A615M, GRADE 60 STEEL.
3. ALL REINFORCING STEEL SHALL BE EPOXY COATED DEFORMED BARS CONFORMING TO THE
STRENGTH OF 3,000 PSI.
2. ALL OTHER CAST-IN-PLACE CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE
STRENGTH OF 4,000 PSI.
1. CONCRETE FOR SLAB, APPROACH SLABS AND RAILS SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE
MATERIAL NOTES:
3. SPLICES OF OTHER REINFORCING BARS SHALL NOT BE PERMITTED.
OF THE LENGTHS INDICATED.
2. AT THE CONTRACTOR'S OPTION, BARS LISTED IN TABLES OF OPTIONAL LAP SPLICES ON PLAN OR DETAIL SHEETS MAY HAVE LAP SPLICES
1. OPEN RAIL AND CLOSED RAIL BARS S592 & S593 SHALL HAVE STAGGERED LAP SPLICES AS SHOWN ON SHEETS S-120, S-220 & S-314.
REINFORCING LAP SPLICES:
1. SEE SPECIFICATION SECTION 01 12 00 CONSTRUCTION GENERAL, PARAGRAPH ORDER OF WORK
ORDER OF WORK
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:25:53 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
M
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -0
.d g n
A N
S I
D
S-001
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
B R
ID
G E
S
G E
N E
R A
L N
O T
E S
J U
L Y
W F
B
ELEV. 1633.00 ELEV. 1633.00
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET IDGENERAL PLAN
1'-0" 1'-0"
GENERAL ELEVATION
10' 20'0
10' 20'0
SPAN NO. 1 = 30'-0"
LC
LC ABUTMENT NO. 1
LC BENT NO. 1
LC ABUTMENT NO. 2
LC LC LC
BENT NO. 2LC
SPAN NO. 3 = 30'-0"
LC
F L
O W
BRIDGE HYDRAULIC INFORMATION
LC
LC
N
N
SPAN NO. 2 = 40'-0"
NO. 1
GRADE BEAM
(US SIDE)
ELEV 1652.83
Q100 H.W.
LC
BEAM NO. 1
GRADE LC
BEAM NO. 2
GRADE
ROADWAYLC
O U
T T
O O
U T
OPEN BRIDGE RAIL
ABUTMENT TO ABUTMENT = 100'-0"
END OF FLOOR TO END OF FLOOR = 102'-0""
(CHAIN LINK FENCE TYPE)
PEDESTRIAN RAIL
CURB, TYP.
INTEGRAL
NO. 1 = 20'-0"
PAVING SECTION
NO. 2 = 20'-0"
PAVING SECTION
(CHAIN LINK FENCE NOT SHOWN)
BRIDGE RAILS
ELEV. 1656.48
STA. 101+88.07
BEGIN PAVING SECTION
ELEV. 1656.89
STA. 102+08.07
ELEV. 1656.89
STA. 103+42.07
BEAM NO. 2
GRADE
ELEV. 1656.48
STA. 103+62.07
SECTION
END PAVING
ELEV. 1657.00
STA. 102+25.07
ABUTMENT NO. 1
ELEV. 1657.00
STA. 102+55.07
BENT NO. 1
ELEV. 1657.00
STA. 102+95.07
BENT NO. 2
ELEV. 1657.00
STA. 103+25.07
ABUTMENT NO. 2
ELEV. 1655.35
LOW CHORD
GROUND
EXISTING
GROUND
EXISTING
M2050H1305STRUCTURE NUMBER
Q500 SCOUR ELEV. = 1637.0 FT
Q100 LOCAL SCOUR = 5.2 FT
Q100 GENERAL SCOUR = 3.0 FT
ORDINARY HIGH WATER ELEV = 1644.00 FT
Q(O.H.W.) = 5.0 CFS
W.W.A. BELOW H.S. = 561 SQ FT
H.W. ELEV. = 1652.83 FT (US SIDE)
Q100 = 4,258 CFS (BASE FLOOD)
D.A. = 9.2 SQ MI
STREAM: MIDDLE LOGAN CREEK
APPROACH SLAB, TYP.
TRANSITION RAIL ON
NO. 1 = 16'-0"
SLAB
APPROACH
NO. 2 = 16'-0"
SLAB
APPROACH
O N B
R
ID
G E
C L E
A R R
O A
D W
A Y
AND CE501.
SEE SHEETS CE102,
AND BEDDING,
RIPRAP, SPALLS
ONLY SHEET S-901 FOR PHOTOGRAPHS AND DESCRIPTION OF THE EXISTING BRIDGE.
REMOVE EXISTING PILES AS SPECIFIED ON SHEET S-103. SEE FOR INFORMATION
3. REMOVE EXISTING BRIDGE, WINGWALLS AND STORM DRAIN HEADWALL.
ON THE APPROACH SLABS AND PAVING SECTIONS.
ROADWAY ON TOP OF THE BRIDGE DECK. SEE CIVIL SHEETS FOR VERTICAL CURVES
2. STATION AND GRADE ELEVATIONS SHOWN ARE AT THE CENTERLINE OF THE
IN CEDAR COUNTY, NEBRASKA.
IT CROSSES MIDDLE LOGAN CREEK IN THE NORTH HALF OF SECTION 30-T28N-R1E
1. THIS BRIDGE IS LOCATED ON THE SOUTH SIDE OF RANDOLPH, NE.
NOTES:
CLOSED BRIDGE RAIL
LC
TYP.
DRAIN,
FLOOR
3 SPACES @ 26'-0" = 78'-0"
LC
TYP.
DRAIN,
FLOOR
12'-0"12'-0"
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:28:31 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-101
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
G E
N E
R A
L P
L A
N A
N D E
L E
V A
T
IO
N
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
10' 20'0
GEOLOGIC PROFILE
N
LC LC LCLC LC
LC
NO. 1
GRADE BEAM
ELEV. 1656.47
STA. 101+88.07
BEGIN PAVING SECTION
ELEV. 1656.97
STA. 102+08.07
ELEV. 1656.98
STA. 103+42.07
BEAM NO. 2
GRADE
ELEV. 1656.48
STA. 103+62.07
SECTION
END PAVING
ELEV. 1657.00
STA. 102+25.07
ABUTMENT NO. 1
ELEV. 1657.00
STA. 102+55.07
BENT NO. 1
ELEV. 1657.00
STA. 102+95.07
BENT NO. 2
ELEV. 1657.00
STA. 103+25.07
ABUTMENT NO. 2
GROUND
EXISTING
GROUND
EXISTING
N
MLC17-05
5-6
3-3
4-6
4-5
3-4
2-2
2-4
4-8
9-14
9-11
13-18
SEP. 15, 2017
BORING MLC17-05
ELEV. 1655.1 +/-
N
MLC17-06
3-3
2-3
4-6
5-8
1-2
5-10
1-3
6-7
10-8
16-18
16-22
SEP. 15, 2017
BORING MLC17-06
ELEV. 1654.0 +/-
A 140 LB WEIGHT FALLING 30 INCHES IN ACCORDANCE WITH ASTM D1586 PROCEDURES.
TO DRIVE A STANDARD PENETROMETER OF 2" O.D. THE SECOND AND THIRD 6 INCHES USING
3. FIGURES BESIDE THE COLUMN OF SOIL BORINGS INDICATE THE NUMBER OF BLOWS REQUIRED
2. SEE SHEETS B-001 THROUGH B-004 FOR ADDITIONAL SOIL BORING INFORMATION.
1. SEE SHEETS GI101 AND S-103 FOR LOCATIONS OF SOIL BORINGS.
NOTES:
LEGEND
WATER
MADE GROUND)
FILL: FILL (MAN
SILTY SAND
SM: USCS
TOPSOIL
CLAYEY SAND
SC: USCS
WITH SILTY SAND
WELL-GRADED SAND
SW-SM: USCS
SILTY CLAY
LOW PLASTICITY
CL-ML: USCS
SAND
WELL-GRADED
SW: USCS
PLASTICITY CLAY
CL: USCS LOW
SAND WITH SILT
POORLY-GRADED
SP-SM: USCS
PLASTICITY CLAY
CH: USCS HIGH
SAND
POORLY-GRADED
SP: USCS
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:29:27 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-102
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
G E
O L
O G
IC
A L P
R O
F
IL
E
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
PILE LAYOUT
(feet)
LENGTH
PILE ORDER
TENTATIVE
(feet)
BELOW CUT-OFF
PENETRATION
MINIMUM
ELEVATION
CUT-OFF
NUMBER
PILE
LOCATION
(feet)
LENGTH
PILE ORDER
(kips/pile)
BEARING
DESIGN PILE
LOCATION
NUMBER
PILE
ELEVATION
CUT-OFF
(feet)
LENGTH
PILE ORDER
(kips/pile)
BEARING
DESIGN PILE
PILE DATA TEST PILE DATA
5 70
LC
LC
(AT ABUTMENT)
SHEET PILE
OF EXPOSED SHEET PILE. (TYP.)
EACH WAY AROUND CORNERS
WRAP FILTER FABRIC 1'-6"
SHEET PILE (AT WING)
3" MIN.
TIGHT FIT
TYPICAL HP PILE
CJP
SMAW E7018
45°
THIS SIDE
BEFORE WELDING
BACK GOUGE
OR WEB
FLANGE
SIDE FIRST
WELD THIS
45°
NOT TO SCALE
STANDARD PILE SPLICE
SHEET PILE CORNER DETAIL (TYP.)
NOT TO SCALE
1/4
NOT TO SCALE
SHEET PILE MINIMUM SECTION PROPERTIES
DEPTH
SECTION
NO. 2
BENT
NO. 2
ABUTMENT
NO. 1
BENT
HP 12 x 53
HP 12 x 53
HP 12 x 53
HP 12 x 53
HP 12 x 53
HP 12 x 53
HP 12 x 53
HP 12 x 53
H-PILE TYPE H-PILE TYPE
BELOW FINAL GRADE.
REMOVE ANY EXISTING PILES MORE THAN 5 FEET FROM NEW PILE LOCATIONS TO A MINIMUM OF 2 FEET
COMPLETELY REMOVE ANY EXISTING PILES WITHIN 5 FEET OF NEW PILE LOCATIONS.
1. DETAILS OF EXISTING BRIDGE ABUTMENT ARE NOT KNOWN. REMOVE EXISTING BRIDGE ABUTMENTS.
GENERAL NOTES:
0 8'4' 16'
STEEL H-PILES FOR ADDITIONAL INFORMATION.
THAN THE DESIGN PILE BEARING VALUES SHOWN. SEE SPECIFICATION SECTION 31 62 16
STRENGTH REDUCTION FACTOR GIVEN IN AASHTO TABLE 10.5.5.2.3-1 SHALL NOT BE LESS
DETERMINED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER MULTIPLIED BY THE APPROPRIATE
IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 8TH EDITION. THE PILE CAPACITIES
11. THE DESIGN PILE BEARING VALUES SHOWN IN THE TABLES ON THIS SHEET ARE THE FACTORED LOAD
SECTION 01 22 00 MEASUREMENT AND PAYMENT.
IN ACCORDANCE WITH PARAGRAPH “DRIVING TESTS FOR STEEL H-PILES” IN SPECIFICATION
CONJUNCTION WITH THE USE OF THE PILE DRIVING ANALYZER, AS DESCRIBED HEREIN, SHALL BE PAID FOR
THE WORK PERFORMED BY THE CONTRACTOR AND THE CONTRACTOR'S GEOTECHNICAL ENGINEER IN
DRIVING AREA FOR THE CONTRACTOR'S GEOTECHNICAL ENGINEER’S EQUIPMENT VEHICLE (LIGHT TRUCK).
NORMALLY RANGE FROM 30 TO 60 MINUTES. THE CONTRACTOR SHALL PROVIDE ACCESS TO THE PILE
10. THE TIME DELAY IN DRIVING EACH PILE BEING MONITORED BY THE PILE DRIVING ANALYZER WILL
THE CONTRACTOR'S GEOTECHNICAL ENGINEER.
TRANSDUCERS. THE CONTRACTOR SHALL CONTINUE DRIVING THE PILE TO CUT-OFF OR AS DIRECTED BY
CONTRACTOR SHALL STOP THE HAMMER FOR THE REMOVAL OF THE ACCELEROMETERS AND STRAIN
GROUND, OR AS DIRECTED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER, AT WHICH TIME THE
9. THE CONTRACTOR SHALL DRIVE THE PILE UNTIL THE TRANSDUCERS ARE NEAR THE SURFACE OF THE
DETERMINATION AFTER THE FIRST FEW BLOWS.
THE GROUND. THE CONTRACTOR MAY BE REQUIRED TO STOP THE HAMMER FOR WAVE SPEED
TRANSDUCERS SHALL BE PREDRILLED BY THE CONTRACTOR WHILE THE PILE IS STILL ON
PILE BEFORE DRIVING IS STARTED. THE HOLES OR ANCHORS FOR THE ACCELEROMETERS AND STRAIN
DRIVING. THE CONTRACTOR SHALL BOLT TWO ACCELEROMETERS AND TWO STRAIN TRANSDUCERS TO THE
8. THE USE OF THE PILE DRIVING ANALYZER WILL REQUIRE THE CONTRACTOR TO SET UP THE HAMMER FOR
WITH THE PILE DRIVING ANALYZER.
7. AT THE CONTRACTOR'S GEOTECHNICAL ENGINEER’S OPTION, ADDITIONAL PILING MAY BE MONITORED
SPECIFICATIONS
6. TEST PILES SHALL BE DRIVEN AS SHOWN IN THE TEST PILE DATA TABLE AND IN ACCORDANCE WITH THE
APPROVED.
DRIVEN UNTIL THE SUBMITTALS OF TEST PILE MONITORING AND FINAL PILE ORDER LENGTHS HAVE BEEN
GEOTECHNICAL ENGINEER AND SUBMITTED FOR APPROVAL. PILES OTHER THAN TEST PILES SHALL NOT BE
WITH A PILE DRIVING ANALYZER. FINAL ORDER LENGTHS SHALL BE DETERMINED BY THE CONTRACTOR'S
THE DRIVING OF THE TEST PILES SHALL BE MONITORED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER
THE FINAL ORDER LENGTHS SHALL BE BASED ON THE RESULTS OBTAINED FROM THE TEST PILE DRIVING.
5. PILE ORDER LENGTHS (WITH THE EXCEPTION OF THOSE SHOWN FOR THE TEST PILES) ARE TENTATIVE.
BENTS ARE DESIGNED FOR SCOUR TO ELEVATION 1630.50 FOR THE 500-YEAR FLOOD.
4. BENTS ARE DESIGNED FOR SCOUR TO ELEVATION 1630.60 FOR THE 100-YEAR FLOOD.
3. BENT PILE NUMBER FOLLOWED BY THE LETTER "B" SHALL BE BATTERED 1.5 : 12.0
DRIVING PILES.
2. THE CONTRACTOR SHALL EXCAVATE TO THE BOTTOM OF CONCRETE ELEVATION PRIOR TO
1. ALL H-PILE SPACING IS MEASURED AT BOTTOM OF CONCRETE.
H-PILE NOTES:
NO. 1
BENT HP 12 x 53
HP 12 x 5395
HP 12 x 53
HP 12 x 53
NO. 1
GRADE BEAM
NO. 1
ABUTMENT
NO. 2
ABUTMENT
NO. 2
GRADE BEAM
1 - 5
1, 2, 9 & 10
3 - 8
1 - 5
1, 2, 9 & 10
LEGEND:
NEW HP12x53
NEW STEEL SHEET PILE
SOIL BORING
NEW HP12x53 TEST PILE
BENT NO. 1
SPAN NO. 1 = 30'-0" SPAN NO. 2 = 40'-0" SPAN NO. 3 = 30'-0"
BENT NO. 2LCLC BEAM NO. 2
GRADELCLC
BEAM NO. 1
GRADE LC
NO. 1
ABUTMENT LC
NO. 2
ABUTMENT
17'-0" 17'-0"
EXISTING BRIDGE ABUTMENTS
APPROXIMATE LOCATION OF
MLC17-05
MLC17-06
1B
9B
S
P
S
P
1B
9B
S
P
S
P
"1 2 3
10 9
1, 3, 5, 7, 9
1, 3, 5, 7, 9
2, 4, 6, 8
1652.50
1652.50
1642.50
1642.50
LC
"6
1653.00
1653.00
1653.00
1653.00
1654.00
1654.00
ROADWAYLC
LC ABUTMENTS AND BENTS
ROADWAYLC
ABUTMENTS AND BENTS
SECTION PROPERTIES.
SHEET PILE LAYOUT SHOWING ALL PERTINENT DIMENSIONS, DETAILS, AND
2. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL A SHOP PLAN OF THE
MINIMUM ELASTIC SECTION MODULUS = 30.2 IN^3/FT
MINIMUM SECTION THICKNESS = 0.375 IN
MAXIMUM SECTION DEPTH = 13.0 IN
SECTION LENGTH = 15 FT
SHALL MEET OR EXCEED THE FOLLOWING MINIMUM SECTION PROPERTIES:
1. ALL STEEL SHEET PILING SHALL CONFORM TO ASTM A328/A328M STEEL AND
SHEET PILE NOTES:
13'-10"
13'-10"
6'-6" 4'-6" 6'-0"
6'-6" 4'-6" 6'-0"
6'-0" 4'-6" 6'-6"
6'-0" 4'-6" 6'-6"
13'-10"
13'-10"
3, 4, 6 - 8
2, 4, 8
1'-8"
LC SHEET PILE
1'-8"
LC SHEET PILE
LC
LC
WING
SHEET PILE
LC
LC
WING
SHEET PILE
LC
LC
WING
SHEET PILE
LC
LC
WING
SHEET PILE
1653.00
1642.50
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:31:57 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-103
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
P
IL
E D
A T
A A
N D L
A Y
O U
T
J U
L Y
W F
B
6'-2"'6'-2"'3'-1"'3'-1"'6'-2"'6'-2"'
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
LC
N
LC
LCLC SHEET PILESHEET PILELC
LC ROADWAY
LC SHEET PILE
PLAN OF ABUTMENT NO. 1
0 2' 4'1'
WING WING
ABUTMENT NO. 1
GRADE BEAM NO. 1
LC ABUTMENT
34'-6"
14'-4" 20'-2"
2'-11"
7'-10"7'-10"7'-10" 7'-10"
34'-6"
JOINT MATERIAL, TYP.
1" PREFORMED EXPANSION
1'-1" 1'-8" 1'-3"1'-1"1'-8"1'-3"
LC
4"
4"
2" 1'-2" 2'-8"
2'-8" 1'-2" 2"
1'-7"1'-7"
1'-10"
T Y
P
T Y
P
1'-10"
(SEE SHEET S-108 FOR TIE ROD DETAILS)
TURNBUCKLES AND 1" THREADED ROD
1" DIA. TIE ROD UPSET TO 1 1/4" WITH
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:32:50 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-104
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
M A
IN
S
T R
E E
T B
R
ID
G E
R A
N D
O L P
H
N E
A B
U T
M E
N T N
O
P L
A N S
H O
W
IN
G D
IM
E N
S
IO
N S
J U
L Y
W F
B
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
LC ROADWAY
14'-4"'20'-2"'
PLAN OF ABUTMENT NO. 2
0 2' 4'1'
N
2'-11"
LC ABUTMENT
LC
LC
LCLC SHEET PILESHEET PILELC
LC SHEET PILE
WING WING
ABUTMENT NO. 2
34'-6"
7'-10"7'-10"7'-10" 7'-10"
34'-6"
JOINT MATERIAL, TYP.
1" PREFORMED EXPANSION
1'-1" 1'-8" 1'-3"1'-1"1'-8"1'-3"
LC
4"
4"
2" 1'-2" 2'-8"
2'-8" 1'-2" 2"
1'-7"1'-7"
1'-10"
T Y
P
T Y
P
1'-10"
GRADE BEAM NO. 2
(SEE SHEET S-108 FOR TIE ROD DETAILS)
TURNBUCKLES AND 1" THREADED ROD
1" DIA. TIE ROD UPSET TO 1 1/4" WITH
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:33:44 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-105
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
M A
IN
S
T R
E E
T B
R
ID
G E
R A
N D
O L P
H
N E
A B
U T
M E
N T N
O
P L
A N S
H O
W
IN
G D
IM
E N
S
IO
N S
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
LC
N
ABUTMENT
LC GRADE BEAM
0 2' 4'1'
34-A501 (6 BETWEEN INTERIOR PILES, 2 OUTSIDE EXTERIOR PILE)
A601 @ 12" O.C. (EA. FACE)
34-A502 TO MATCH A501
2-A405 2-A405
2-A503
4-A802 PLACE TOAVOID BEARING PILES (BOTTOM)
4-A801 EQ. SP. (TOP)
A505
N
ABUTMENT NO. 1 ABUTMENT NO. 2
5-A401 (TOP & BOTTOM)
A401 (SIDES)
-A
T
O M
A T
C H A
-A
E
Q S
P (P
L A
C E T
O A
V O
ID
B
E A
R
IN
G P
IL
E S
3-A405
2-A406
2-A406
2-A405
5-A401 (TOP & BOTTOM)
A401 (SIDES)
-A
T
O M
A T
C H A
-A
E
Q S
P (P
L A
C E T
O A
V O
ID
B
E A
R
IN
G P
IL
E S
3-A405
2-A406
2-A406
A640 @ 12" O.C.
36 - A440 (8 BETWEEN BEARING PILES, 2 EACH END)
A740 (16 REQ'D, SEE GRADE BEAM SECTION)
THAN 50% OF BARS ARE LAPPED AT ANY LOCATION.
2. STAGGER SPLICES OF A802 SO THAT NO MORE
THAN 50% OF BARS ARE LAPPED AT ANY LOCATION.
1. STAGGER SPLICES OF A801 SO THAT NO MORE
LAP SPLICE NOTES:
2-A402 2-A402
PLAN OF ABUTMENT NO. 1
ABUTMENT NO. 2 SIMILAR
A801
(INCHES)
MINIMUM LAP SPLICE LENGTH
BAR
A802
A740
FOR BARS SHOWN ON THIS SHEET
OPTIONAL REINFORCING LAP SPLICES
A503
A505
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:35:02 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-106
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
M A
IN
S
T R
E E
T B
R
ID
G E
R A
N D
O L P
H
N E
P L
A N S
H O
W
IN
G R
E
IN
F O
R C
IN
G
A B
U T
M E
N T N
O
J U
L Y
W F
B
20'-2"'14'-4"'
2'-11"'
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
A404
ABUTMENT
BRIDGE SLABAPPROACH SLAB
BEARING PILE
1'-9" 1'-0" 1'-3"
SHEET PILE
34'-6"
34 - A502 TO MATCH A501
A405A405
LC
2'-8" 1'-2" 2"
V A
R
IE
S
1'-1" 1'-3"
(T&B)
5 - A401
SECTION OF WING
1'-8"
GRADE BEAM
ABUTMENT
3'-3"4'-6"4'-11"
ELEVATION OF WING
ELEV. "B" ELEV. "A"
2" EXTRUDED POLYSTYRENE
1/8" HARDBOARD ON TOP OF
1"
1'-0"
A401
A403
A401
A402
SHEET PILE
2" EXTRUDED POLYSTYRENE
1/8" HARDBOARD ON TOP OF
4"
ELEV. 1655.75
ROADWAY
WESTEAST
ELEVATION OF ABUTMENT NO. 1
ELEV. 1955.46
ELEV. 1652.00
LC ROADWAY
LC ABUTMENT
ELEV. 1652.00
ELEV. 1655.35
M
IN
/1
"6
M A
X
/1
M
IN
.2-A503 4-A801
A601 @ 12" O.C. (EA. FACE)
SHEET PILE
A505A601 A601
4'0 2' 8'
4'2' 8'0
A502
4-A801
4-A802 1
A503
A501
A503
1'-0"16'-0" APPROACH SLAB
PILE
SHEET
PILE, TYP.
BEARING
ELEV. 1652.00
(SPONGE RUBBERTYPE)
1" PREFORMEDJOINT FILLER
(SPONGE RUBBERTYPE)
1" PREFORMEDJOINT FILLER
1'-6" 1"
2'-9"12'-8"
ABUTMENT NO. 2 SIMILAR
12-A404 TO MATCH A403
4'0 2' 8'
NOTE 1
5-A401
3-A401
2-A402
4-A802
LC
LC
LC
ELEV. "A" AND ELEV. "B"
SLOPE UNIFORMLY BETWEEN
ELEV. 1652.00
BEARING PILE
TOP OF WING ELEVATIONS
ABUTMENT NO. 1
ABUTMENT NO. 1
ABUTMENT NO. 2
ABUTMENT NO. 2
WEST WING
EAST WING
WEST WING
EAST WING
ELEVATION "A" ELEVATION "B"
1655.25
1655.37
1655.25
1655.37
1655.14
1655.26
1655.14
1655.26
IN SHEET PILE AS NECESSARY TO ALLOW PLACEMENT OF A401
2. FIELD DRILL OR BURN 1" HOLES
1. A401 EXTEND 2'-0" INTO ABUTMENT CAP.
NOTES:
A406A406
A405
SECTION OF ABUTMENT
2'0 1' 4'
PILE, TYP.
BEARING
PIPE, TYP.
DRAIN
SEE ELEVATION OF WING FOR BARS THAT EXTEND INTO ABUTMENT
PLACE A501 EQUALLY SPACED WITH 3-INCHES CLEAR TO BEARING PILES
34 - A501 (6 BETWEEN INTERIOR PILES, 2 OUTSIDE EA. EXTERIOR PILE)
PLACE A403 & A404 EQUALLY SPACED WITH 3-INCHES CLEAR TO BEARING PILES
12-A403
2-A505
S
H E
E T P
IL
E
T Y
P
A B
U T
M E
N T A
N D W
IN
G
1" DIA. TIE ROD UPSET
TO 1 1/4" W/ TURNBUCKLES
/1
M A
X
/1
M
IN
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:37:32 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-107
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
E L E
V A
T
IO
N S A
N D S
E C
T
IO
N S
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
A B
U T
M E
N T W
IN
G
W A
L L S
J U
L Y
W F
B
17'-3"'17'-3"'
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
OUT TO OUT
TIE ROD
AFTER WELDING
GRIND SMOOTH
UPSET
6"
3'-0"
6"
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
TIE ROD HOOK DETAIL
TIE ROD UPSET DETAIL
DETAIL FOR TURNBUCKLES
3'-0" 1'-0"
TURNBUCKLE
DESIGN SIZE UPSET SIZE
BE OF THE SIZE SHOWN FOR THE UPSET.
AS AN ALTERNATE, THE ENTIRE TIE ROD MAY
GRADE BEAM SECTION
2 - A740
6 - A740
34'-6"
ELEVATION OF GRADE BEAM
TYPICAL AT GRADE BEAMS NO. 1 AND NO. 2
1/4"
3'-0" 3'-0"
TIE ROD DETAIL
NOT TO SCALE
OUT TO OUT = 31'-4"
3'-9"3'-9"
2'-9"
ROADWAYLC LC GRADE BEAM
ELEV. 1655.27 ELEV. 1655.16
2'-11"'
EAST WEST
ELEV. 1652.66
BEARING PILE
A640 @ 12" O.C.
PAVING SECTION
1'-6"1'-6"
ASPHALT BASE SHEETS.
PLACE OF TWO SBS MODIFIED
OF THE GRADE BEAM AND
FINISH ON THE APPROACH HALF
STEEL TROWEL TO A SMOOTH
LC GRADE BEAM
1'-7"' 7'-10"' 7'-10"' 7'-10"' 7'-10"' 1'-7"'
A640 @ 12" O.C.
36 - A440 (8 BETWEEN BEARING PILES, 2 EACH END)
1655.56
ELEV.
A440
APPROACH SLAB
16-A740
4'0 2' 8'
2'0 1' 4'
ELEV. 1652.77
1653.06
ELEV.
2 - A740
M
IN
/4
M A
X
"POLYSTYRENE
3"x6"
WITH SEALANT
JOINT MATERIAL
1" PREFORMED EXPANSION
PLACE A440 EQUALLY SPACED WITH 3-INCHES CLEAR TO BEARING PILES
1" DIA. TIE ROD
1 1/4" DIA. UPSET
1 1/4" DIA. ROD 1 1/4" DIA. ROD
1 1/4" DIA. UPSET
/4
10"
11 1/4"
16 3/8"
ELEV. VARIES
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:39:02 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-108
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
G R
A D
E B
E A
M T
IE
R
O D D
E T
A
IL
S
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
2"
7"
WELD NUT TO ANGLE
L8"x8"x1/2" 3 1/2"
L8"x8"x1/2"
WELD NUTS ON INSIDE.
NOSE ANGLE TO FORMS.
BOLTS USED TO FASTEN
CENTERS FOR •1/2" DIA.
9/16" DIA. HOLES AT 4'-0"
1'-0" CENTERS
WELDED STUDS @
3/4" END
NOSE ARMOR ANGLE DETAILS
NOT TO SCALE
B E
N T
PLAN OF BENT
c l cl
6'4'2'0
1'-0" 17'-5" 11"
1'-0" 11"
SECTION OF BENT
SEE DETAILS ON THIS SHEET
(UPSTREAM SIDE ONLY)
NOSE ARMOR ANGLE
L8x8x1/2
1 1/212
1 1/2
EASTWEST
ELEV. 1655.00
ELEV. 1654.59 ELEV. 1654.71
ELEVATION OF BENT
ELEV. 1633.00
cl
20'-2" 14'-4"
1'-0" 20'-4" 14'-6" 11"
T
Y P
T
Y P
TYP
BEARING PILE,
2'-0"
ELEVATION
CUTOFF
H-PILE
ELEVATION
CUTOFF
H-PILE
GALVANIZE AFTER FABRICATION
ELEV. 1633.00
/2
2'-8 9/16"
6'4'2'0
ROADWAY
clBENT
4 SPACES @ 4'-6" = 18'-0" 4 SPACES @ 4'-6" = 18'-0"
2'-11"
2'-8 3/8"
/8
/8
M
IN
M A
X
6'4'2'0
42'-1 15/16 "
17'-5"
1'-0" 20'-1 9/16" 11"20'-1 3/8"
BENT
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:09:55 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-109
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
B E
N T P
L A
N
E
L E
V A
T
IO
N
S H
O W
IN
G D
IM
E N
S
IO
N S
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
J U
L Y
W F
B
B506
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
ELEVATION OF BENT
PLAN OF BENT
6'4'2'0
6'4'2'0
SECTION OF BENT
SEE SHEET S-109
NOSE ARMOR ANGLE
2 - B505
2 - B505
B505
B T
O M
A T
C H B
B T
O M
A T
C H B
M A
X
M
IN
185 - B401 PLACE AS SHOWN
B501
B501 @ 12" O.C., EA. FACE
B502 B401, TYP.
B505
B504 B504
B505
6'4'2'0
B
O .C E
A F
A C
E
24 - B506 TO MATCH B501 AS SHOWN BETWEEN BEARING PILES
35 - B501 @ 12" O.C., EA. FACE
B
O .C E
A F
A C
E
2 - B507
2 - B508
2 - B507
2 - B508
B502
(INCHES)
MINIMUM LAP SPLICE LENGTH
BAR
FOR BARS SHOWN ON THIS SHEET
OPTIONAL REINFORCING LAP SPLICES
B401, TYP.
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:16:01 PM 7/8/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-110
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
B E
N T P
L A
N
E
L E
V A
T
IO
N
S H
O W
IN
G R
E
IN
F O
R C
IN
G
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
ROADWAYcl
ROADWAYcl
ROADWAY CROSS SECTION AT BENTS
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
DRIP BEAD DETAIL
ROADWAYcl
PARABOLIC CURVE
2'-0" 2'-0"
PROFILE GRADE
2% SLOPE
TOP OF FINISHED SLAB
/4
2% SLOPE
CROWN TEMPLATE
HALF CLEAR ROADWAY = 13'-0" HALF CLEAR ROADWAY = 13'-0" 1'-2" 2"1'-2"
S401 @ 12" O.C. 2% SLOPE TEMPLATE DETAIL
SEE CROWN
2% SLOPE
S501 @ 12" O.C. DRIP BEAD (TYP.)
ROADWAY CROSS SECTION NEAR MID-SPAN
HALF CLEAR ROADWAY = 13'-0"1'-2" HALF CLEAR ROADWAY = 13'-0" 1'-2" 2"
SEE CROWN TEMPLATE DETAIL
S401 @ 12" O.C.
2-S406
S701 @ 12" O.C.
1/2" DRIP BEAD 2"
S701 S701
FRONT FACE OF CLOSED BRIDGE RAIL
FRONT FACE OF CLOSED BRIDGE RAIL
6'-0"
34'-6"
WEST EAST
5'-0" CLEAR
6'-0"
34'-6"
2% SLOPE
FRONT FACE OF OPEN BRIDGE RAIL
cl
5'-0" CLEAR
6"
2% SLOPE
S404
S404 @ 24" O.C.
S801 @ 12".C.
S802 @ 12" O.C.
S501 @ 12" O.C.
S404
FRONT FACE OF OPEN BRIDGE RAIL
S405 (SPAN NO. 2)
S801 (SPANS NO. 1 & 3)
S902 @ 12" O.C. (SPANS NO. 1 & 3), S903 @ 12" O.C. (SPAN NO. 2)
S901 @ 12" O.C. (SPANS NO. 1 & 3), S904 @ 12" O.C. (SPAN NO. 2)
S905 (SPAN NO. 1 & 3)
S906 (SPAN NO. 2)
S905 (SPAN NO. 1 & 3)
S906 (SPAN NO. 2)
S405 (SPAN NO. 2)
S801 (SPANS NO. 1 & 3)
S801 (SPAN NO. 1 AND NO. 3) OR S405 (SPAN NO. 2)
cl 6"
BARS FOR CLOSED BRIDGE RAIL
SEE SHEET S-118 FOR EMBEDDED BARS FOR OPEN BRIDGE RAIL
SEE SHEET S-117 FOR EMBEDDED
FENCE TYPE)
(CHAIN LINK
PEDESTRIAN RAILING
FENCE TYPE)
(CHAIN LINK
PEDESTRIAN RAILING
1. SEE SHEETS S-112 & S-113 FOR SLAB REINFORCEMENT LAYOUT.
REINFORCING NOTES:
S907
2% SLOPE 2% SLOPE
S907
S402 TO MATCH BARS B501 IN BENT
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg4:37:35 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-111
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
C R
O S
S S
E C
T
IO
N O
F R
O A
D W
A Y
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
cl clABUTMENT NO. 1 OR NO. 2
1'-0" 1'-3"
@ 12" O.C.
S701
S407 @ 12" O.C.
END OF FLOOR
S501
S501 @ 12" O.C. 1'-0"
S701 (TYP.)
EQUALLY SPACED EQUALLY SPACED
1'-0"7 - S501 7 - S501
SPAN NO. 1 OR NO. 3 = 30-0"
BENT NO. 1 OR NO. 2
HALF SPAN NO. 2 = 20'-0"
clBRIDGE
(SYMMETRIC ABOUT )cl cl cl clABUTMENT NO. 1 OR NO. 2
1'-0"
S401 @ 12" O.C.
SPAN NO. 1 OR 3 = 30'-0"
/4
/2
C L
S407 @ 12" O.C.
S501
1'-3"
/4
C L
1'-0"
6'-0"
7-S501 (TYP.)
S701
S406
6'-0"1'-0"1'-0"
S501 @ 12" O.C.
B501
45°
A602
2'-0"
BRIDGE
(SYMMETRIC ABOUT )cl
BENT NO. 1 OR NO. 2
HALF SPAN NO. 2 = 20'-0"
OPTIONAL CONSTRUCTION JOINT
10'-0"
OPTIONAL CONSTRUCTION JOINT
10'-0"
14'-0" (S802) 13'-0" (S802)
23'-6" LONG
S901
29'-0" LONG
S902
CENTER IN SPAN NO. 2
S904, 24'-0" LONG
LONG
27'-0"
S802
40'-6" LONG
S801
S404 (TYP.)
S
O .C
B O
T T
O M
S
O .C
B O
T T
O M
@ 3" O.C. (TYP.)
4-S905, 29'-0" LONG
@ 3" O.C. (TYP.)
4-S906, 36'-6" LONG
NOT TO SCALE
LONGITUDINAL SECTION
NOT TO SCALE
S510, 12'-7" LONG CENTER OVER BENTS
@ 24" O.C.
S404, 18'-0" LONG,
IN BENT
BARS B501
S402 MATCH
S501 AT 12" O.C.
CENTER IN SPAN NO. 2
7'-8" LONG
S405
BARS B501 IN BENT
S402 TO MATCH
SLAB REINFORCEMENT LAYOUT - BOTTOM MAT
@ 3" O.C. (TYP.)
4-S905, 29'-0" LONG
S701 (TYP.)
@ 3" O.C. (TYP.)
4-S906, 36'-6" LONGS404 (TYP.)
S
O .C
S
O .C
S406
OF SLAB
EAST EDGE
c l R
O A
D W
A Y
OF SLAB
WEST EDGE
CENTER IN SPAN NO. 2
S903, 36'-6" LONG
1'-0" S501 @ 12" O.C.
21'-3" (S801 & S907) 19'-3" (S801 S907)
S501
(INCHES)
MINIMUM LAP SPLICE LENGTH
BAR
FOR BARS SHOWN ON THIS SHEET
OPTIONAL REINFORCING LAP SPLICES
OF CLEAR COVER TO FLOOR DRAINS.
2. FIELD ADJUST REINFORCING TO PROVIDE A MINIMUM OF 1 1/2 INCHES
1. SEE SHEET S-111 FOR CROSS SECTION OF ROADWAY.
REINFORCING NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:11:46 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-112
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
S L
A B R
E
IN
F O
R C
E M
E N
T L
A Y
O U
T
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
B O
T T
O M M
A T
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
cl clABUTMENT NO. 1 OR NO. 2
1'-0" S401 @ 12" O.C.
END OF FLOOR
SPAN NO. 1 OR NO. 3 = 30-0"
BENT NO. 1 OR NO. 2
HALF SPAN NO. 2 = 20'-0"
clBRIDGE
(SYMMETRIC ABOUT )cl
NOT TO SCALE
LONGITUDINAL SECTION
NOT TO SCALE
OF SLAB
EAST EDGE
c l R
O A
D W
A Y
OF SLAB
WEST EDGE
S
O .C
S
O .C
S
O .C
S
O .C
EACH FENCE POST
S408, TYP. AT
clFENCE POST, TYP.
SLAB REINFORCEMENT LAYOUT - TOP MAT
S907, 40'-6" LONG @ 3" O.C.
S907, 40'-6" LONG @ 3" O.C.
S907, 40'-6" LONG
cl cl clABUTMENT NO. 1 OR NO. 2
1'-0"
S401 @ 12" O.C.
SPAN NO. 1 OR 3 = 30'-0"
/4
/2
C L
S407 @ 12" O.C.
S501
1'-3"
/4
C L
1'-0"
6'-0"
7-S501 (TYP.)
S701
S406
6'-0"1'-0"1'-0"
S501 @ 12" O.C.
B501
45°
A602
2'-0"
BRIDGE
(SYMMETRIC ABOUT )cl
BENT NO. 1 OR NO. 2
HALF SPAN NO. 2 = 20'-0"
OPTIONAL CONSTRUCTION JOINT
10'-0"
OPTIONAL CONSTRUCTION JOINT
10'-0"
14'-0" (S802) 13'-0" (S802)
23'-6" LONG
S901
29'-0" LONG
S902
CENTER IN SPAN NO. 2
S904, 24'-0" LONG
LONG
27'-0"
S802
40'-6" LONG
S801S510, 12'-7" LONG CENTER OVER BENTS
@ 24" O.C.
S404, 18'-0" LONG,
CENTER IN SPAN NO. 2
7'-8" LONG
S405
BARS B501 IN BENT
S402 TO MATCH
CENTER IN SPAN NO. 2
S903, 36'-6" LONG
1'-0" S501 @ 12" O.C.
21'-3" (S801 & S907) 19'-3" (S801 S907)
S401
(INCHES)
MINIMUM LAP SPLICE LENGTH
BAR
FOR BARS SHOWN ON THIS SHEET
OPTIONAL REINFORCING LAP SPLICES
OF CLEAR COVER TO THE FLOOR DRAINS AND EMBEDDED FENCE POST ANCHORS.
3. FIELD ADJUST REINFORCING BARS TO MAINTAIN A MINIMUM OF 1 1/2 INCHES
2. SEE SHEET S-115 FOR FLOOR DRAIN DETAILS.
1. SEE SHEET S-111 FOR CROSS SECTION OF ROADWAY.
REINFORCING NOTES:
SEE SECTION A-A ON SHEET S-117
5-S409 @ 12" O.C. TYP. BOTH ENDS OF EAST EDGE OF SLAB ONLY
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:16:42 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-113
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
S L
A B R
E
IN
F O
R C
E M
E N
T L
A Y
O U
T
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
T O
P M
A T
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
P N NP P
cl cl cl cl
NOT TO SCALE
POURING DIAGRAM
NOT TO SCALE
OPTIONAL CONSTRUCTION JOINT
1 1/2"
/4
/4
D /2
D
/2
M
IN
MAX.
ANY "P" SECTION.
STOPPING AT THE COMPLETION OF
PROCEEDING TO THE OTHER END,
STARTING AT EITHER END AND
THE ENTIRE SLAB SHALL BE POURED
P
N
=POSITIVE MOMENT SECTION
=NEGATIVE MOMENT SECTION
OPTIONAL CONSTRUCTION JOINTS (POUR IN DIRECTION OF ARROWS)
BENT NO. 1
ABUTMENT NO. 1
END OF FLOOR
SPAN NO. 1
10'-0" 10'-0"
SPAN NO. 2
10'-0" 10'-0"
SPAN NO. 3
BENT NO. 2
ABUTMENT NO. 2
POURING SEQUENCE:
FILL FLUSH WITH SURFACE
APPROVED SILICONE JOINT
SHALL BE DRY AT THE TIME OF SEALING.
COMPRESSED AIR SHALL BE FREE OF ANY CONTAMINANTS. THE JOINT
COMPRESSED AIR HAVING A MINIMUM PRESSURE OF 90 PSI. THE
MATERIAL. AFTER SANDBLASTING THE ENTIRE JOINT SHALL BE CLEANED WITH
WALL SURFACES SHALL BE SANDBLASTED TO REMOVE ANY DELETERIOUS
THE MANUFACTURER'S RECOMMENDATION. BEFORE SEALING THE JOINT
THE CONTRACTOR SHALL PREPARE AND SEAL THE JOINT ACCORDING TO
END OF FLOOR
3/16"
WILL BE .001' FOR EACH FOOT OF CLEAR SPAN OR FRACTION THEREOF.
2. WHEN THE FALSEWORK IS REMOVED, THE ANTICIPATED SLAB DEFLECTION
OF BRIDGE SLAB AND APPROACH SLABS.
1. SEE SPECIFICATION SECTION 03 40 00 "CONCRETE BRIDGE FLOORS" FOR TINING
SLAB NOTES:
3'-0"
GUTTER LINE
STRIKE LINES
1'-6" 1'-6"1'-6"1'-6"
Level
TYP.
TYP.
‚" END ~
3'-0"
1'-6"
1'-6"
1'-6"
M A
X
M
IN
1'-6"
1'-6"
M
IN
M A
X
SECTION A-A
SECTION B-B
NOT TO SCALE
A A
B
B
NOT TO SCALE
FLOOR DRAIN - PLAN
NOT TO SCALE
LC DRAIN
3 SPACES AT 10" O.C.
HSS8x8x1/4
1/4" END PLATE, TYP.
AND CUT OPENING FOR DOWNSPOUT
CUT AS SHOWN IN SECTION B-B
3'-0" LONG HSS8x8x1/4
HSS8x8x1/4
HSS8x8x1/4 DOWNSPOUT
LC DRAIN
OPENING FOR DOWNSPOUT
CUT AS SHOWN, AND CUT
3'-0" LONG HSS8X8X1/4
STUDS @ 10" O.C., TYP.
1/2"X 4" END WELDED
HSS8x8x1/4 DOWNSPOUT
/2
7. ALL FLOOR DRAINS SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A123/A123M.
AND AWS D1.1/D1.1M, TABLE 7.1, TYPE B.
6. HEADED, WELDED STUDS SHALL CONFORM TO ASTM A29/A29M, GRADES 1010 THROUGH 1020
5. STEEL PLATES FOR FLOOR DRAINS SHALL CONFORM TO ASTM A36.
4. HOLLOW STRUCTURAL STEEL (HSS) SHALL MEET THE REQUIREMENTS OF ASTM A500/A500M, GRADE B.
3. SET FLOOR DRAINS LEVEL.
2. FIELD BEND OR MOVE RAIL BARS AND SLAB BARS TO CLEAR FLOOR DRAINS A MINIMUM OF 1-INCH.
1. SEE SHEET S-101 FOR LOCATIONS OF FLOOR DRAINS.
FLOOR DRAIN NOTES:
2% SLOPE
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:20:01 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-114
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
S L
A B P
O U
R
IN
G D
IA
G R
A M
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
J U
L Y
F
L O
O R D
R A
IN
D
E T
A
IL
S
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
BEARING PILE
NOT TO SCALE
BEARING PILE
SECTION OF GRANULAR BACKFILL
APPROACH SLAB NO. 1 APPROACH SLAB NO. 2BRIDGE FLOOR
A
A
B
LEGEND
WATER IS NOT ALLOWED.
COMPACTION EQUIPMENT SHALL NOT BE USED IN THESE AREAS. FLOODING THE GRANULAR BACKFILL WITH
MECHANICAL TAMPER, ROLLER, OR VIBRATORY COMPACTOR. THERE IS NO DENSITY REQUIREMENT. HEAVY
PLACED IN 8-INCH LAYERS AND COMPACTED BY A SINGLE PASS OF A WALK-BEHIND, LIGHTWEIGHT (APPROX, 100 LBS.)
THE GRANULAR BACKFILL IN THESE AREAS (BEHIND ABUTMENTS AND BENEATH APPROACH SLABS) SHALL BE
A
SHEET PILESHEET PILE
ELEV. 1652.00
NOTE 1 NOTE 1
3'-6" 3'-6"
RIPRAP
SPALLS
BEDDING
RIPRAP
SPALLS
BEDDING
NOTE 2 NOTE 2
PAVING SECTIONPAVING SECTION
BEARING PILE
GRADE BEAM
BEARING PILE
GRADE BEAM
B
SEE CIVIL SHEETS
AND BASE COURSES,
CONCRETE PAVEMENT
B
SEE CIVIL SHEETS
AND BASE COURSES,
CONCRETE PAVEMENT
ELEV. 1652.00
NOT TO SCALE
RIPRAP
GRANULAR BACKFILL NOT SHOWN
DRAINAGE DETAIL
DRAIN PIPE.
TO WRAP FILTER FABRIC AROUND
REMOVE THE MATTING AS REQUIRED
FOLD FILTER FABRIC OVER TOP OF MATTING.
REMOVE THE MATTING AS REQUIRED TO
PLACE FABRIC SIDE TOWARD BACKFILL.
CONTINUOUS BETWEEN ABUTMENT WINGS.
SUBSURFACE DRAINAGE MATTING
CENTERED OVER THE END OF PIPE
GALVANIZED WIRE MESH SCREEN
OF CONCRETE AND ADHERE A 1'-0" x 1'-0"
CUT PLASTIC PIPE FLUSH WITH FACE
TEE-CONNECTION TO THE 2" PIPE
WITH PLUGS AT EACH END. PROVIDE
CONTINUOUS BETWEEN ABUTMENT WINGS
4" PERFORATED PLASTIC UNDERDRAIN PIPE
(NEBRASKA) PAVEMENTS FOR SMALL PROJECTS
COMPACTED IN ACCORDANCE WITH THE SPECIFICATION SECTION 32 10 00.02
THE GRANULAR BACKFILL IN THESE AREAS (BENEATH PAVING SECTION) SHALL BE
POURING THE CONCRETE SLAB
ON TOP OF THE GRANULAR BACKFILL PRIOR TO
PLACE 3"x6" POLYSTYRENE RIGID INSULATION
POURING THE CONCRETE SLAB
GRANULAR BACKFILL PRIOR TO
INSULATION ON TOP OF THE
PLACE 3"x6" POLYSTYRENE RIGID
SHEET PILE FOR PIPE.
WITH A 4% SLOPE. FIELD CUT HOLES IN
PLACED MIDWAY BETWEEN BEARING PILES
2" NON-PERFORATED PLASTIC PIPE
BACKFILL MATERIALS.
GEOTEXTILE BONDED TO ONE SIDE. THE GEOTEXTILE SHALL ALLOW WATER TO PASS THROUGH WHILE RETAINING
10. SUBSURFACE DRAINAGE MATTING SHALL BE A GEOCOMPOSITE DRAIN COMPOSED OF A CORE WITH A NONWOVEN
TO AASHTO M 288.
9. FILTER FABRIC SHALL BE A WOVEN OR NONWOVEN GEOTEXTILE PERVIOUS SHEET OF POLYMERIC CONFORMING
23 GAGE MINIMUM, WITH 1/4 INCH X 1/4 INCH OPENINGS.
8. GALVANIZED WIRE MESH (HARDWARE CLOTH) SHALL BE FABRICATED OF DURABLE GALVANIZED STEEL WIRES, ASTM F794 OR ASTM F949. PERFORATIONS SHALL BE SLOTTED AS PER ASTM F949.
7. PERFORATED PLASTIC PIPE SHALL CONFORM TO AASHTO M 252, ASTM F667/F667M,
6. NON-PERFORATED PLASTIC PIPE SHALL CONFORM TO ASTM D1785 SCHEDULE 40.
YIELD STRENGTH BETWEEN 16 PSI AND 40 PSI AT 5% BY VOLUME COMPRESSION.
MINIMUM FLEXURAL STRENGTH OF 35 PSI AS DETERMINED BY ASTM C 203. IT SHALL ALSO HAVE A COMPRESSIVE
5. POLYSTYRENE RIGID INSULATION SHALL CONFORM TO ASTM C 578, TYPE V, VI, OR VII, SQUARE EDGED AND SHALL HAVE A
IN SPECIFICATION SECTION 32 10 00.02 (NEBRASKA) PAVEMENTS FOR SMALL PROJECTS.
4. GRANULAR BACKFILL SHALL COMPLY WITH THE REQUIREMENTS FOR AGGREGATE BASE COURSE
COMPRESSIVE STRENGTH.
UNTIL THE SUPERSTRUCTURE (BRIDGE SLAB) HAS BEEN PLACED AND CURED TO 70% OF SPECIFIED
THE LAND SIDE SHALL NOT PROCEED ABOVE THE ELEVATION OF BACKFILL ON THE RIVER SIDE
3. BACKFILLING SHALL BE DONE CONCURRENTLY ON ALL SIDES OF ABUTMENT. BACKFILLING ON
SLOPES AWAY FROM THE ABUTMENT.
MATERIAL IS PLACED BENEATH THE ABUTMENT CONCRETE, AND THAT TOP OF SOIL IN FRONT OF THE ABUTMENT
COMPACTED IN ACCORDANCE WITH SPECIFICATION SECTION 31 00 00 EARTHWORK. ENSURE THAT NO COARSE GRAINED
2. REMOVE ANY UNSUITABLE MATERIAL BENEATH BOTTOM OF ABUTMENT CONCRETE AND BACKFILL WITH CLAY
AND LIGHTLY COMPACTED AS SHOWN UNDER THE REMAINING APPROACH SLAB SECTION.
BOTTOM OF THE APPROACH SLAB; AND A MINIMUM DEPTH OF 1'-0" OF GRANULAR BACKFILL SHALL BE PLACED
BE BACKFILLED AND LIGHTLY COMPACTED WITH GRANULAR BACKFILL FROM THE BOTTOM OF THE VOID TO THE
FROM THE INSIDE ABUTMENT AND WINGWALL FACES. IF THIS OPTION IS ELECTED, THE 3'-6" WIDE VOID SHALL
THE CONTRACTOR MAY UTILIZE TEMPORARY SHORING TO ACHIEVE A MINIMUM OF 3'-6" OF CLEAR EXCAVATION
AT CONTRACTOR'S OPTION, IN LIEU OF EXCAVATING TO A SLOPE AS SHOWN TO CONSTRUCT THE ABUTMENT,
1. EXCAVATE TO A STABLE SLOPE IN ACCORDANCE WITH ALL APPLICABLE SAFETY REQUIREMENTS.
NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:20:54 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-115
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
G R
A N
U L
A R B
A C
K F
IL
L A
N D D
R A
IN
A G
E D
E T
A
IL
S
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
N
8'0 4' 16'
MIN.
JOINT SEALANT
3"
LC
3/16"
/2
/2
C L
N801
N502
N501 (TOP & BOTTOM)
A602
C L
PAVING SECTION = 20'-0"
/2
C L
C L
NOTE 3
N503 (TOP & BOTTOM)
JOINT MATERIAL, SEE CIVIL SHEETS
JOINT WITH 1-INCH EXPANSION
DOWELLED PAVEMENT
@12" O.C.
N640
N504
N601
SECTION A-A
NOT TO SCALE
LC LC
A
APPROACH SLAB = 16'-0"
NO. 1 OR NO. 2
GRADE BEAM
1'-6" 1'-6"
A
A A
NOTE 2
NOTE 2
PAVING SECTION NO. 1 = 20'-0"
APPROACH SLAB NO. 1 = 16'-0"
END OF FLOOR TO END OF FLOOR = 102'-0"
APPROACH SLAB NO. 2 = 16'-0" PAVING SECTION NO. 1 = 20'-0"
SEE CIVIL SHEETS
INTEGRAL CURB, TYP.
GRADE BEAM NO. 2
LONGITUDINAL SECTION - APPROACH SLAB NO. 1 AND NO. 2
LC
LC
N501 @ 8" O.C.. (BOTTOM)
N
O .C (T
O P
N501 @ 12" O.C. (TOP)
N501 @ 8" O.C.. (BOTTOM)
N
O .C (T
O P
N501 @ 12" O.C. (TOP)
GRADE BEAM NO. 1
N503 @ 12" O.C. (TOP & BOTTOM)
N
O .C (T
O P
N
O .C (B
O T
T O
M
N
O .C (B
O T
T O
M
N
O .C (B
O T
T O
M
N503 @ 12" O.C. (TOP & BOTTOM)
N
O .C (T
O P
N
O .C (B
O T
T O
M
TYP. 4 PLACES
TOP & BOTTOM,
N505 x 14'-0" LONG
NOT TO SCALE
SECTION B-B
N401 @ 12" O.C.
B
B
N401 @ 12" O.C.
B
B
C C
C C
CROSS SECTION ON SHEET S-111.
TEMPLATE SHOWN ON THE BRIDGE ROADWAY
SHALL MATCH THE SLOPES AND CROWN
THE APPROACH SLABS AND PAVING SECTIONS
ROADWAY
APPROACH SLAB ONLY
EAST EDGE OF
NOTE 4
POURED CONTINUOUS WITH BRIDGE DECK.
TO BE USED IF APPROACH SLAB IS
NOT TO SCALE
AT END OF FLOOR
ALTERNATE JOINT DETAIL
AND PAVING SECTIONS
PLAN OF APPROACH SLABS
END OF BRIDGE FLOOR
ANCHOR
DURING POUR.
STABILIZED PLATE
TOOL AND SEAL.
EDGE TO EDGE OF DECK,
PLATE EXTEND FROM
8 GA. GALVANIZED
GRADE BEAM NO. 1 OR NO. 2 END OF PAVING SECTION NO. 1 OR NO. 2DETAIL AT END OF FLOOR"
OR SEE "ALTERNATE JOINT
END OF BRIDGE FLOOR,
COLD JOINT AT
ON SHEET S-119
REINFORCING
SEE TRANSITION RAIL
/8
/8
LC
NO. 1 OR NO. 2
GRADE BEAM
1'-6" 1'-6"
APPROACH SLAB SEE CIVIL SHEETS
SIDEWALK SLAB-ON-GRADE,
NOT TO SCALE
SECTION C-C
@12" O.C.
N640
NOTE 3
NOTE 4
N501
(INCHES)
MINIMUM LAP SPLICE LENGTH
BAR
N503
FOR BARS SHOWN ON THIS SHEET
OPTIONAL REINFORCING LAP SPLICES
B
B
SIM.
SIM.
B
B
SIM.
SIM.
6'-0" @ SECTION B-B SIM.
2" @ SECTION B-B
B-B ONLY
N401 @ SECTION
SHEET S-111
DETAIL ON
SEE DRIP BEAD
4"
APPROACH SLAB ONLY
EAST EDGE OF
OF BRIDGE SLAB AND APPROACH SLABS.
5. SEE SPECIFICATION SECTION 03 40 00 "CONCRETE BRIDGE FLOORS" FOR TINING
INCLUDING AT INTERFACE OF THE INTEGRAL CURBS WITH THE TRANSITION RAILS.
EXPANSION JOINT WITH SEALANT SHALL EXTEND FROM EDGE TO EDGE OF APPROACH SLAB
4. PROVIDE 1-INCH PREFORMED EXPANSION JOINT FILLER WITH 1-INCH BY 3/4-INCH SEALANT.
SHOWN ON SHEET S-115 PRIOR TO POURING THE CONCRETE APPROACH SLAB.
OF THE GRADE BEAM. PLACE 3"x6" POLYSTYRENE ON TOP OF THE GRANULAR BACKFILL AS
3. PLACE TWO LAYERS OF S85 MODIFIED ASPHALT BASE SHEET ON THE APPROACH SLAB SIDE
OF RAIL REINFORCEMENT.
2. FRONT FACE OF CONCRETE RAILS. SEE SHEETS S-117, S-118 AND S-119 FOR PLACEMENT
ON THE APPROACH SECTION.
CURB ONTHE PAVING SECTION SHALL BE FLUSH WITH THE FRONT FACE OF THE TRANSITION RAIL
AND HORIZONTAL CURVES AT EDGES OF THE PAVING SECTIONS. THE FRONT FACE OF INTEGRAL
1. SEE CIVIL SHEETS FOR VERTICAL CURVES ON THE APPROACH SLABS AND PAVING SECTIONS
APPROACH SLAB NOTES:
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:21:47 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-116
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
P L
A N A
N D D
E T
A
IL
S
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
M A
IN
S
T R
E E
T B
R
ID
G E
A P
P R
O A
C H S
L A
B S P
A V
IN
G S
E C
T
IO
N S
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
LC
LC
LC
LC
B
B
D D opp.D D opp.
A
A
A
A
12-S692 (BF) & 12-S690 (FF) 2'-6"
4-S690 F.F.
4-S492 B.F.
3-S390
S391 @ 12" O.C.
4-S592
12-S692 (BF) & 12-S690 (FF)
8-S590
FRONT FACE OF RAIL
END OF FLOOR AT
5'-0" 1'-6"
POST
4-S592
POST
1'-6"
8-S590
FRONT FACE OF RAIL
END OF FLOOR AT
5'-0"
NOT TO SCALE
NOT TO SCALE
S391 at 12" O.C.
6'-6" 6'-6"
8-S590
3'-6"
2-S592
POST
TOP OF SLAB
S390
4-S492 B.F.
4-S690 F.F.
2'-6"12-S692 (BF) & 12-S690 (FF) 12-S692 (BF) & 12-S690 (FF)
8-S590
3'-6"
POST
SECTION A-A
NOT TO SCALE
2"
4 5/8"
TYP.
2" CL.
1'-2"
FRONT FACE OF RAIL
3/4" CHAMFER, TYP.
V A
R
IE
S
4'-6" 4'-6"
END OF FLOOR TO END OF FLOOR = 102'-0"
END OF FLOOR TO END OF FLOOR = 102'-0"
WITH 3/4" CHAMFERS
COLD JOINT
WITH 3/4" CHAMFERS
COLD JOINT
10 SPACES @ 8'-0" = 80'-0"'-0"4'-6" 4'-6"
C
C
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SECTION B-B
SECTION D-D
FRONT FACE OF RAIL
TYP.
3/4" CHAMFER, TYP.
S592 TYP.
S391 AT 12" O.C.
S492
5"
2-S390
S690
V A
R
IE
S
" 2 "1
/2
/2
3-S390
2'-6"
4-S492 (BF)
4-S690 (FF)
3-S390
6"1'-6"6"
1'-6"
1'-2"
2" CL.
PLAN OF POST
NOT TO SCALE
SECTION C-C
FRONT FACE OF RAIL
TYP.
3/4" CHAMFER, TYP.
S592 TYP.
S391 AT 12" O.C.
V A
R
IE
S
" 2 "1
1'-2"
2" CL.
3 1/2"10 1/2"
PLAN OF OPEN BRIDGE RAIL
ELEVATION OF OPEN BRIDGE RAIL
S692 S690
-S
E
Q S
P A
ON APPROACH SLAB
16'-0" TRANSITION RAIL
ON APPROACH SLAB
16'-0" TRANSITION RAIL
ON APPROACH SLAB
16'-0" TRANSITION RAIL
ON APPROACH SLAB
16'-0" TRANSITION RAIL
S409
10 SPACES @ 8'-0" = 80'-0"
7. SEE SHEET S-120 FOR ADDITIONAL DETAILS.
6. STAGGER LAP SPLICES OF S592 AS SHOWN ON SHEET S-120
5. THE CONCRETE RAIL SHALLL BE BUILT PLUMB.
4. MEASURED AT FRONT FACE OF RAIL.
COLD JOINT MUST BE FORMED AT THE END OF FLOOR.
3. WHEN POURING CONCRETE RAILS, A MANDATORY CHAMFERED
TOP LAYER OF SLAB REINFORCEMENT.
2. CIRCLED BARS INDICATE PLACEMENT IN THE
(BF) = BACK FACE
1. (FF) = FRONT FACE
NOTES:
2" 10 1/2" 3 1/2"
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:22:41 PM 7/9/2021
...\30500 - Construction E&D\RD02\30DA0 - Plans & Specs\CAD_BIM\_Sheets\RD02 - Middle Logan Creek Flood Risk Managem
A H
A
N E
F
IL
E N
A M
E
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
R D
S -1
.d g n
A N
S I
D
S-117
W
B O
E C
K
L P
E T
E R
S O
N
L P
E T
E R
S O
N
N
N A
R C
IS
O
M A
IN
S
T R
E E
T B
R
ID
G E
O P
E N B
R
ID
G E R
A
IL
P L
A N A
N D E
L E
V A
T
IO
N
F L
O O
D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T P
H A
S E
O M
A H
A D
IS
T R
IC
T
M
ID
D L E L
O G
A N C
R E
E K
N E
B R
A S
K A
R A
N D
O L P
H
N E
J U
L Y
W F
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
SECTION A-A SECTION B-B
SECTION C-C
5'-0"
S594
4-S593
8-S591
11-S692 (BF) & 11-S690 (FF)
OF RAIL
FRONT FACE
S591
5'-0"
2-S593
2-S594
NOT TO SCALE
11-S692 (BF) & 11-S690 (FF)
NOT TO SCALE
S391 @ 24" CTRS.
11 1/2"
NOT TO SCALE
11 1/2"
/2
/2
NOT TO SCALE
FRONT FACE OF RAIL
1'-2"
TYP.
2" CL.
S692 S690
-S
E Q S
P A
V A
R
IE
S
/4
3"
S593
S391 @ 24" CTRS.
FRONT FACE OF RAIL
1'-2"
V A
R
IE
S
S492 @ 12" CTRS.
10 1/2" 3 1/2"
S595 @ 12" CTRS.
S391 @ 24" CTRS.
PLAN OF CLOSED BRIDGE RAIL
WITH 3/4" CHAMFERS
COLD JOINT
5'-0"
8-S591
11-S692 (BF) & 11-S690 (FF)
S591
5'-0"
11-S692 (BF) & 11-S690 (FF)
11 1/2"
OPP.OPP.
* BRIDGE END OF FLOOR TO END OF FLOOR = 102'-0"
WITH 3/4" CHAMFERS
COLD JOINT
(TYP.)
2" CL.
NOT TO SCALE
S594
4-S593 & 1-S594
S492 @ 12" O.C. (BF) & S595 @ 12" O.C. (FF)
S492 @ 12" O.C. (BF) & S595 @ 12" O.C. (FF)
ON APPROACH SLAB
16'-0" TRANSITION RAIL
ON APPROACH SLAB
16'-0" TRANSITION RAIL
ON APPROACH SLAB
16'-0"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .