This document provides an amendment to the solicitation and specifications for the Middle Logan Creek Flood Risk Management Project, Phase 2 in Randolph, Nebraska. The amendment makes revisions to specifications sections regarding earthwork tolerances, revises and reissues several design drawings, and extends the bid due date by one day to August 20, 2021 at 2:00 PM CDT. The flood risk reduction project involves excavating and widening approximately 550 feet of the Middle Logan Creek channel, installing grade control and erosion protection, removing and replacing three bridges, and relocating roadways and utility infrastructure. A site visit was previously scheduled for July 27, 2021. The U.S. Army Corps of Engineers Omaha District is the contracting agency for this project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG10828776
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Am0003 in the SF 30 Block 14 - Continuation Page for description of the amendment changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F21B0012
X 9B. DATED (SEE ITEM 11)
20-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F21B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AM0003
SUBJECT: Amendment No. 0003 to Specifications and Drawings for Construction of Middle Logan Creek, Flood Risk Management Project, Phase 2, Randolph NE.
1. The specifications and drawings for subject project are hereby changed as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 31 00 00 Page 21, paragraph 3.17.1,
a) Subparagraph a, delete “2,500” and substitute “10,000”
b) Subparagraph b, delete “500” and substitute “1,000”
(2) Section 31 00 00 Page 21, paragraph 3.17.2,
a) Subparagraph a, delete “25,000” and substitute “100,000”
b) Subparagraph b, delete “5,000” and substitute “10,000”
b. Drawings (Reissued). The following drawings are revised with latest revision date of 17 August 2021 and reissued with this amendment.
(1) Sheets: CD103, CD103A, CD104, CS102, and CS103A.
c. Bid Due Date. Bid due date is changed from 19 August 2021 at 2:00 PM CDT to 20 August 2021 at 2:00 PM
CDT.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
3. Attachments.
a. Am0003 Drawings listed in 1b above.
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
W9128F21B0012
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications - July 2021 480 Attachment 2 Drawings 1 of 3 - July
Attachment 3 Drawings 2 of 3 - July
Attachment 4 Drawings 3 of 3 - July
Attachment 5 Am0001 Drawings 3 11-AUG-2021 Attachment 6 Am0002 Drawings 2 13-AUG-2021 Attachment 7 Attachment to 02 82 00 64 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications - July 2021 480 Attachment 2 Drawings 1 of 3 - July
Attachment 3 Drawings 2 of 3 - July
Attachment 4 Drawings 3 of 3 - July
Attachment 5 Am0001 Drawings 3 11-AUG-2021 Attachment 6 Am0002 Drawings 2 13-AUG-2021 Attachment 7 Attachment to 02 82 00 64 Attachment 8 Am0003 Drawings 5 17-AUG-2021
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The required response date/time has changed from 19-Aug-2021 02:00 PM to 20-Aug-2021 02:00 PM.
(End of Summary of Changes)