Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912WJ24B0013
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New England District is seeking contractors to replace the approximately 300-foot long west sheet pile bulkhead at the East Boat Basin of the Cape Cod Canal in Sandwich, Massachusetts. The key requirements include installing 440 linear feet of new steel sheet piles with a higher top elevation, new concrete deadmen and tie rods, replacing lighting and utilities, and installing new site features like fencing, sidewalk, driveway, and stormwater drainage. Proposals are due electronically by September 25, 2024 at 1:00 PM Eastern. The contract will be awarded based on the overall technical and price evaluation criteria.
This solicitation is not set-aside for any specific business size or status. The government estimate for the work is between $5-10 million. The contract will have a performance period of 410 calendar days after award. The work is to be performed at the East Boat Basin in Sandwich, MA.
Notice text
11 versions
Update #11 · Latest ·
This amendment responds to a request for information.
Update #10 ·
This amendment provides revised drawings and specs and an updated wage determination.
Update #9 ·
This amendment extends the submission due date. An additional amendment is forthcoming.
Update #8 ·
This amendment provides a MassDEP 401 Water Quality Certificate.
Update #7 ·
This amendment responds to RFIs.
Update #6 ·
This amendment provides an updated wage determination.
Update #5 ·
This amendment provides revised drawings.
Update #4 ·
This amendment updates the bid submission instructions.
Update #3 ·
This amendment responds to RFIs and provides updated drawings.
Update #2 ·
This amendment provides the site visit attendees list.
Update #1 ·
The East Boat Basin is a small sheltered harbor for small craft located near the east end of the Cape Cod Canal on the Cape side in Sandwich, Massachusetts. On both sides of the entrance to the harbor, facing the canal, are sheet pile bulkheads. This project will replace the west sheet pile bulkhead with a completely new bulkhead. The existing west bulkhead is approximately 300 feet long with two 60 foot long returns. Behind the bulkhead is a restaurant, a fish unloading station, a parking lot, and open space for public recreation with picnic tables, benches, etc. The existing sheet pile bulkhead, installed in the mid 1980s, is significantly corroded with section loss and damage to structural supports. The existing steel sheet piles were installed five feet in front of an older sheet pile bulkhead, age unknown. The older sheet piles were then cut off about 10 feet below grade. The piles are connected via steel tie rods to a series of concrete dead men located about 50 feet back from the piles. The dead men and portions of the steel tie rods predate the 1980s work. Specific works tasks include, but are not limited to, the following: a. Install new temporary bike path to divert pedestrians around project area. Restore area to original condition upon completing of bulkhead installation. b. Install approximately 440 linear feet of steel sheet piles with interior whalers to create a new bulkhead about five feet in front of the existing bulkhead sheets. Bulkhead top shall be 18 inches higher than existing bulkhead top. Install a system of wood fender piles to protect against ships and boats. c. Install new concrete dead men, tie rods and waler connected to new PZ40 sheet piles. d. Cut off the existing steel sheet piles about 10 feet below grade. Backfill the space between old and new sheet piles with crushed stone. e. Replace light system and existing conduits and protect existing associated power supply system. f. Install new bollards, cleats and concrete foundation for crane davit to replace existing. g. Install a new fence, sidewalk and curb along the entire length of the bulkhead. h. Install new driveway and gate for truck loading at the bulkhead.i. Install new concrete pads for picnic tables and other park features. j. Repair/replace storm drains disrupted by the construction. k. Install new timber bumper piles at corners of the new bulkhead. I. Replace rip-rap as needed near the two returns.
Files
Show all 26
Notice history
| Notice | Type | Posted |
|---|---|---|
| Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA | Award Notice | |
| This notice | Solicitation | |
| Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA | Pre-Solicitation | |
| Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity