This document is an amendment to a solicitation for a federal contract opportunity. The amendment provides responses to several requests for information (RFIs) regarding the solicitation details. Key details include:
The solicitation is for the replacement of the west sheet pile bulkhead at the Cape Cod Canal East Boat Basin in Sandwich, MA. The project involves installing approximately 440 linear feet of new steel sheet piles, new concrete deadmen and tie rods, cutting off the existing sheet piles 10 feet below grade, and installing new site features like bollards, fencing, sidewalks, and stormwater infrastructure. The amendment clarifies specification details for the sheet piles, bollard foundations, concrete pads, and handling of existing fill material. The solicitation number is W912WJ24B0013, and the contract will be administered by the U.S. Army Corps of Engineers, New England District.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to respond to RFIs and to provide updated draw ings. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24B0013
X 9B. DATED (SEE ITEM 11)
25-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ24B0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
Requests for Information
1. [Company] is interested in submitting a bid for the above project. In reviewing the plans and specs, we are unable to locate Section 00 41 00 Bidding Schedule listed in the table of contents and/or Section 00 80 00 Special Requirements referenced in document ‘W912WJ24B0013’.
Please refer to the Bidding Schedule included in Section 00100, Bidding Schedule/Instructions to Bidders, of the SF 1442 solicitation. Special Requirements are included in Section 00800 of the solicitation.
2. Specification Section 31 05 16 2.1.B, states ASTM A190/A90M for Steel Sheet Pile. Sheet Pile Notes on Drawing S-001 states, ASTM A572, Grade 50. Please clarify.
Reference Specification Section 31 41 16 2.1.B for Steel Sheet Pile publication information.
See revised Drawing S-0001 and S-404.
3. Sheet Pile Note 1 on S-001 states NZ19 sheet pile. All other drawings call out PZ-40 sheet pile, please clarify.
See revised Drawing S-0001 and S-404.
4. Drawing CD102 indicates 4 EA bollard foundations to be removed and demolished with a size of 12’ x 12’ x 4’. Reference drawing CAP-68 shows bollard foundations to be 7’ x 7’ x 3’. Please clarify the dimension of the bollard foundations.
7’x7’x3’ is correct. See revised Drawing CD102.
5. Drawing CD102 indicates a concrete pad and crane davit to be removed and demolished. No dimensions are stated, scaling the drawing shows roughly 13’x12’ pad, would USACE have an idea what the height of this crane pad is and if there is any piling cast within?
There are two davit cane foundations to be demolished. One is 6’x6’x3’ deep. The other is 16’x12’x2’ deep. Both have rebar reinforcement.
6. Drawing CD102 indicates roughly 4,400 SF of concrete pavement removal, what is the thickness of the concrete pavement and reinforcing details contractors should assumed for bidding?
The concrete walkway is 4” of concrete with 10 gauge 6”x6” steel mesh reinforcement on 6” of gravel base.
7. Please clarify details regarding the elevation, size and components of the Catch Basin and Outfall pipe to be removed on drawing CD102.
Assume 4’ diameter concrete structure with a 12” invert 4’ below grade and a 2’ sump below that. Assume RCP pipe. See revised Drawing CD102.
W912WJ24B0013
8. On sheet S-001, sheet pile note 5, states “All holes and openings in steel sheet piles must be made watertight by welding all holes and openings after pile installation is completed.” Is the intention of this note to be referencing the picking holes in each sheet that will be used to lift and move the sheet pile which will be removed when cutting sheet piles off to ELE. 14.0? Or is this note referencing the connection point for the waler, which would require welding the nut to the sheet piles, and the bolt head to the nut at each waler/sheet pile connection point? Please clarify.
The intent is to seal any lifting points/picking holes that remain in the sheets. Nuts and bolts should not be welded to the waler or sheet piles.
9. Per specification section 31 23 00, paragraph 2.1.3, the existing fill may only be reused as backfill if it contains “maximum of 10 percent by weight passing No. 200 sieve.” The boring logs provided with the RFP indicate that a majority of the material to be excavated for the installation of the tie rods appears to contain anywhere from 10-35% non-plastic fines. As such, this existing material would not be suitable for reuse as backfill, requiring transportation offsite & disposal, and purchase & importation of suitable new fill material. The existing fill meets all other parameters except the parameter above. Would the USACE consider loosening or lifting this requirement to enable contractors to assume reuse of the existing fill, to the cost benefit of the USACE?
The Government does not intend to loosen or lift the listed requirement. However, bidders will note that the referenced boring logs were performed in 1980 and 1981, prior to the 1984 construction of the existing bulkhead site. In 1984, new gravel fill was used above the existing deadman and tie rods, with a specified requirement of 0-8 percent by weight passing the No. 200 sieve. Reference the 2023 Test Pit Log for the existing fill conditions, which identified only trace fines in the recorded strata and could be reused for backfill.