This document is an Amendment to a Solicitation for a Marine Construction contract to replace the west sheet pile bulkhead at the Cape Cod Canal East Boat Basin in Sandwich, Massachusetts. The amendment responds to Requests for Information (RFIs) regarding the proposed use of precast concrete deadman walls and clarifies the required corrosion protection for the tie rods. The original Solicitation is for a project to install approximately 440 linear feet of new steel sheet pile bulkhead, including new concrete deadmen, tie rods, and waler system, as well as replace lighting, bollards, fencing, sidewalks, and other site features. Key tasks include installing a temporary bike path, cutting off the existing sheet piles 10 feet below grade, and backfilling the space between the old and new bulkhead. The project is being solicited by the U.S. Army Corps of Engineers, New England District, with a solicitation number of W912WJ24B0013. The amendment provides clarification in response to contractor questions, but does not fundamentally change the scope of the original solicitation.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0011.pdf PDF
Drawing S-404 - Revision 2.pdf PDF
Drawing CD102 - Revision 3.pdf PDF
Specs Section 31 23 00 - Revised.pdf PDF
Amendment 0010.pdf PDF
Drawing S-402 - Revised.pdf PDF
Drawing S-501 - Revised.pdf PDF
Amendment 0009.pdf PDF
Permit - Mass DEP Water Quality Certification.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Drawing CAP-68 - Revised.pdf PDF
Drawing CD102 - Revision 2.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Drawing S-0001 - Revised.pdf PDF
Drawing CD102 - Revised.pdf PDF
Drawing S-404 - Revised.pdf PDF
Amendment 0002.pdf PDF
W912WJ24B0013.pdf PDF
Specs.pdf PDF
Plans.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is necessary to respond to Requests for Information (RFIs). All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24B0013

X 9B. DATED (SEE ITEM 11)

25-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2024

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ24B0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Requests for Information

1. For the concrete deadman walls, would USACE accepts a pre-cast alternate with the same dimensions, concrete strength and steel reinforcement?

The contractor may submit precast concrete variations or value engineering proposals to the cast-in-place deadman.

Note that the deadman is designed to act as a unit, distributing applied loads and USACE would expect precast segments to be moment and shear connected.

2. Drawing S-001, Note 3 under “Paint Notes” indicates that all steel elements connected to the waler must have coal tar epoxy paint applications. On the same drawing, note 6 under “Tie Rod Notes” states All tie rods to be hot dip galvanized. Please advise if tie rods are to galvanized or coated with coal tar epoxy.

The tie rod must be hot dipped galvanized and will have a duplex corrosion protection system. Refer to the 31 41 16 and 09 97 02 specifications. The hot dipped galvanized tie rod must have coal tar bitumen treated fiber tape as indicated in the S-001 Tie Rod Notes. Per the S-001 Paint Notes, coal tar epoxy paint will be applied where the fiber tape cannot be applied.

(End of Summary of Changes)