Drawing S-404 - Revision 2.pdf

PDF 192 KB Posted

Attached to
Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA
Solicitation number
W912WJ24B0013
Issued by

About this file

This document appears to be a drawing (Drawing S-404 - Revision 2) related to a federal contract opportunity for the Marine Construction - West Bulkhead Replacement at the Cape Cod Canal East Boat Basin in Sandwich, MA (Solicitation Number: W912WJ24B0013).

The key details are:

  • The project will replace the approximately 300-foot long west sheet pile bulkhead at the East Boat Basin, including two 60-foot long returns. The existing bulkhead is significantly corroded.
  • The new bulkhead will be installed about 5 feet in front of the existing bulkhead and be 18 inches higher. It will include steel sheet piles, interior whalers, concrete deadmen, tie rods, and a timber fender system.
  • Other work includes installing a temporary bike path, replacing light systems and conduits, installing new bollards, cleats, fencing, sidewalk, driveway, picnic areas, and storm drain repairs.
  • The federal agency involved is the Department of the Army Corps of Engineers, New England District.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0011.pdf PDF
Drawing CD102 - Revision 3.pdf PDF
Specs Section 31 23 00 - Revised.pdf PDF
Amendment 0010.pdf PDF
Drawing S-402 - Revised.pdf PDF
Drawing S-501 - Revised.pdf PDF
Amendment 0009.pdf PDF
Permit - Mass DEP Water Quality Certification.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Drawing CAP-68 - Revised.pdf PDF
Drawing CD102 - Revision 2.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Drawing S-0001 - Revised.pdf PDF
Drawing CD102 - Revised.pdf PDF
Drawing S-404 - Revised.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
W912WJ24B0013.pdf PDF
Specs.pdf PDF
Plans.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL. 2.0

EL. 5.0

EL. 8.0

EL. 14.0

EL. -57.0

EL. -54.0

EL. -49.0

100'-0"50'-0"160'-0"

WEST

ENDEAST

END

16" FENDER PILE (TYP) TOP OF

SHEET PILE

TOP OF CONC.

CAP

MUDLINE

(EL. VARIES)

EL. 18.5

10'-0"7'-6"5'-6"10'-0"10'-0"10'-0"10'-0"6'-4"10'-0"10'-0"8'-0"8'-0"8'-0"10'-0"10'-0"8'-0"8'-0"10'-0"9'-0"9'-0"10'-0"6'-5"10'-0"10'-0"9'-0"8'-8"10'-0"10'-0"10'-0"8'-0"8'-0"7'-10"8'-0"7'-6"10'-0" 1'-9"

310'-0"

EL. 9.45

(MHHW)

EL. 14.0

FINISHED GRADE

REBUILT STONE EMBANKMENT

(APPROXIMATE)

NEW WALER

TOP OF

SHEET PILE

TOP OF CONC.

CAP AND CURB

EL. -29.5

EL. 15.5

NEW 16" DIA. TIMBER

FENDER PILES 48' LONG

37'-2 1/2"

65'-0"

EL. -49.0

EL. -42.0

EL. -32.0

EL. -19.0

EL. -5.0

17'-0"12'-0"12'-0"12'-0"12'-0"

MUDLINE

(EL. VARIES)

EL. 9.45 (MHHW)

EL. 18.5

EL. 5.25 (WING TIE RODS)

12'-0"12'-0"12'-0"12'-0"15'-0"

EL. -57.0

EL. -50.0

EL. -40.0

EL. -26.0

EL. -8.0

EL. 14.0

EL. 5.25 (WING TIE RODS)

63'-0"

FINISHED GRADE REBUILT

STONE EMBANKMENT

(APPROXIMATE)

NEW WALER

TOP OF

SHEET PILE

TOP OF CONC.

CAP AND CURB

EL. -29.5

EL. 15.5

NEW 16" DIA. TIMBER

FENDER PILES 48' LONG

37'-2 1/2"

MUDLINE (EL. VARIES)

EL. 18.5

EL. 9.45

(MHHW)

S-404

ST

R

U C

TU

R

AL

N

EW

B

U

LK

H

EA

D E

LE

VA

TI

O

N S

M .A

N D

R

YU

K

M .A

N D

R

YU

K

B.

PA

U L

J.

KE

D

ZI

ER

SK

I

AN

SI

D 3/

M

AY

US Army Corps of Engineers ®

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E: O

F

SHEET ID

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

0%

P

AC

KA

G

E

W

ES

T

BU

LK

H

EA

D

R

EP

LA

C

EM

EN

T

EA

ST

B

O

AT

B

AS

IN

C

AP

E

C O

D C

AN

AL

SA

N

D W

IC

H

, M

AS

SA

C

H U

SE

TT

S W

2W

J2 4B

C

AP

-1

F1

S-403 SCALE: 3/32" = 1'-0"

NEW BULKHEAD ELEVATIONH1 0 8' 32'16'

F1

S-403 SCALE: 3/32" = 1'-0"

EAST END ELEVATIONA1 0 8' 32'16'

F1

S-403 SCALE: 3/32" = 1'-0"

WEST END ELEVATIONA9 0 8' 32'16'

SHEET NOTES

1. SEE CIVIL DRAWINGS FOR ADDITIONAL NEW FEATURES THAT ARE NOT

SHOWN ON THIS DRAWING.

2. SEE SHEET S-001 FOR STRUCTURAL NOTES AND ABBREVIATIONS.

AD

D

EN

D U

M

A

U G

AD

D

EN

D U

M

S

EP

Sheets and Views
S-404

File details come from the government source that posted it. Updated .