Lights & Electric Repairs

Closed Solicitation Posted

Solicitation number
W50S9B26Q0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Sandston, Virginia 23150, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Virginia Air National Guard 192d Wing seeks electrical repairs and LED lighting replacement at the 200th Combat Weather Flight facility in Sandston, Virginia, with quotes due July 9, 2026 at 1:00 PM EST and questions due June 30 at 2:00 PM EST. This is a 100% total small business set-aside under NAICS 238210, Electrical Contractors and Other Wiring Installation Contractors.

Place of performance is 6025 Beulah Road, Sandston, Virginia. The base scope includes installation of two new 20-ampere, 120-volt electrical circuits with four duplex receptacles, repair of one exterior LED wall pack, and replacement of ten 2'x4' recessed troffer fixtures with LED equivalents in the training room and two offices, maintaining emergency egress lighting. An optional scope (Bid Option 1) covers replacement of an additional 21 troffer fixtures (ten 2'x2' and eleven 2'x4'), fourteen 1'x4' pendant fixtures, five recessed can lights, and two wall-mounted pendant lights. All work must comply with Unified Facilities Code, International Building Code, and NFPA-70 standards. Proposed LED fixtures must be commercially available products meeting or exceeding specifications in Section 3.1 and Attachment 5.4, compatible with existing Leviton occupancy sensors, and UL/ETL certified with minimum 100 lumens per watt efficacy. All materials must be PFAS-, lead-, and VOC-free.

The contract period is 60 calendar days from Notice to Proceed, with work performed Monday through Friday, 0800–1530 hours. Solicitation discloses magnitude less than $25,000. All contractor employees require AT Level I training completion within seven calendar days of contract start and must meet DoD security clearance and background check requirements. Evaluation criteria emphasize price, technical capability, and past performance verified through three years of comparable project experience via client questionnaires. Davis-Bacon wage rates apply. Payment terms are Net 14 through Wide Area Workflow. Funds are not presently available; the government's obligation is contingent upon appropriation and written notice. A mandatory site visit occurred June 25 at 10:00 AM EST; no additional visits will be scheduled.

Notice text

1. Description of Solicitation

This is a Combined Synopsis/Solicitation for commercial products or commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested and a separate written solicitation will not be issued.

2. Solicitation Details

Solicitation Number

W50S9B-26-Q-0004

Solicitation Date

15 June 2026

Issued By

Virginia Air National Guard

192d Wing/MSC

165 Sweeney Blvd, Bldg. 768

Joint-Base Langley-Eustis, VA 23665

Government Point of Contact (POC)

Contracting Officer: MSgt Orlando Loaiza

Email: orlando.loaiza.1@us.af.mil / 192msg.msc.contracting@us.af.mil

Phone: 757-225-1794

Key Dates & Response Times

Site Visit: 25 June 2026 at 10:00 AM EST

Questions Due: 30 June 2026, 2:00 PM EST

Quotes Due: 9 July 2026, 1:00 PM EST

3. Classification and Set-Aside Information

NAICS Code

238210 – Electrical Contractors and Other Wiring Installation Contractors

Size Standard

$19.0 Million

Product Service Code (PSC)

Z2JZ – Repair or Alteration of Miscellaneous Buildings

Disclosure of Magnitude

Less than $25,000

Set-Aside

100% total small business set-aside

4. Description of Requirement

The purpose of this project is to make electrical repairs and replace existing fluorescent/incandescent lights with LEDs at the 200th Combat Weather Flight facility.

The work described in the Statement of Work (SOW) includes the furnishing of all materials, equipment, and labor to perform the work. All work shall conform to industry standards, Unified Facilities Code (UFC), International Building Code (IBC), and NFPA-70 requirements. Any deviation from the manufacturer’s installation requirements must be approved prior to performing work on-site.

Availability of Funds Statement:

Funds are not presently available for this requirement. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

5. Line Items

CLIN

Description

QTY

UI

Unit Price

Extended Price

0001

BASE – Electrical Work: Install two (2) new circuits and provide four (4) new receptacles. Repair one (1) exterior flood light. Remove and replace ten (10) 2'x4' light fixtures. All work as specified in the attached Statement of Work.

1

Job

$________

$_________

OPTION

0002

OPTION 1 – Remove and Replace Lights: Remove and replace ten (10) 2'x4' and eleven (11) 2'x2' recessed troffer light fixtures. Remove and replace fourteen (14) 1'x2' pendant light fixtures, five (5) recessed can lights, and two (2) wall-mounted pendant lights. All work as specified in the attached Statement of Work.

1

Job

$________

$_________

6. Period of Performance

The Government’s Period of Performance is sixty (60) calendar days from the date of the Notice to Proceed (NTP). This timeframe must be inclusive of all project phases, including but not limited to material procurement, submittal approval, and installation.

7. Pre-Quotation Conference & Site Visit

Date and Time: 25 June 2026 at 10:00 AM EST
Location: 200th Combat Weather Flight, 6025 Beulah Rd, Sandston, VA 23150

Registration Requirements

All prospective quoters that intend to attend the site visit must register no later than 24 June 2026 at 1:00 PM EST. Please email the following attendee details to the POC listed in Section 2.4:

  • Full First Name, Middle Initial (use “NMI” if none), and Last Name.
  • Names must match the attendee’s REAL-ID-compliant Government-issued identification.

Important Notes

  • The clauses at FAR 52.236-2 (Differing Site Conditions) and 52.236-3 (Site Investigations and Conditions Affecting the Work) will be included in any contract awarded. Quoters are strongly encouraged to inspect the site.
  • Information provided during this conference or site visit shall not modify the terms of the solicitation; changes are only valid if formal amendments are issued in writing.

8. Wage Determination

The Construction Wage Rate Requirements (formerly known as the Davis-Bacon Wage Rates) are applicable to this project. The current wage determination(s) at the time of contract award will be formally incorporated into the final contract.

9. Quotation Submission Instructions

Quotes must be submitted electronically to the Point of Contact listed in Section 2. Quoters must include pricing for all line items, a completed copy of provisions/clauses, and the following required submittal packages:

  1. Technical Narrative: A written proposal explaining how the Contractor intends to meet the SOW requirements. This submission is limited to 10 single-sided pages.
  2. Past Performance & Experience: A list of comparable projects completed during the past three (3) years for both government and private industry. Must include:
  • Project type, dollar value, contract number, and location.
  • Proof of successful performance.
  • Customer Point of Contact (POC) details.
  • Distribution of Past Performance Questionnaires (Attachment 4): Quoters shall distribute the Past Performance Questionnaire (PPQ) Package to the points of contact for the comparable projects listed in their experience narrative. To ensure an objective evaluation, completed questionnaires must be sent directly from the reference/client to the Contracting Officer (MSgt Orlando Loaiza at orlando.loaiza.1@us.af.mil) via email. All completed PPQs must be received no later than the solicitation closing date (9 July 2026, 1:00 PM EST). Questionnaires submitted directly by the offeror will not be accepted.
  1. Price Schedule: Standard pricing schedule using the Line Items table provided in Section 5, or an alternative detailed pricing structure.

10. Past Performance Evaluation Method

The Government will evaluate the relevancy and quality of the offeror’s past performance utilizing the completed Past Performance Questionnaires (Attachment 4) received directly from references, as well as information obtained from other independent sources such as the Contractor Performance Assessment Reporting System (CPARS).

Recency is defined as a contract or project reference that was active or completed within three (3) years prior to the original issuance date of this solicitation; references for projects completed more than three years ago will not be evaluated.

If a reference is determined to be recent, the Government will then evaluate its Relevancy based on the similarity of the past contract effort to the current requirement in terms of scope, magnitude of effort, and complexity. To be considered relevant, a reference should involve commercial facility electrical installations, repairs, or LED lighting retrofits of a similar magnitude (Less than $25,000) inside a government, military, or commercial facility. General facility maintenance or construction projects that included minor electrical or lighting sub-components will be considered somewhat relevant, while projects with no electrical, lighting, or facility maintenance scope will be deemed not relevant and will not be evaluated.

11. Provisions and Clauses

Provisions and clauses are referenced within the solicitation’s attachment. The full text of federal provisions and clauses may be accessed electronically at https://www.acquisition.gov.

12. National Guard Agency Protest Program

NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency’s Protest Decision Authority, but not both, in accordance with NG protest procedures. To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below:

National Guard Bureau

Office of the Director of Acquisitions/ Head of Contracting Activity

ATTN: NGB-AQ-O

111 S. George Mason Dr.

Arlington, VA 22204

Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil

All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See FAR clause 52.233-2.

NG Public-facing, general Protest information is found at: https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/

Directorate of Acquisitions information for the contracting enterprise is found at https://gko.portal.ng.mil/ngb/STAFF/D01/D01/OI/Protests%20and%20Complaints/Forms/AllItems.aspx

13. List of Attachments

  • Attachment 1 - Solicitation Provisions and Clauses
  • Attachment 2 - Davis-Bacon Act WD # VA20260155, Mod 1 dated 18 May 2026
  • Attachment 3 - Past Performance Questionnaire Package
  • Attachment 4 - Statement of Work Replace Lights REV01 18 MAY 26
  • Attachment 5.1 - Lighting Scope
  • Attachment 5.2- Emergency Lighting Layout
  • Attachment 5.3 - Electrical Scope
  • Attachment 5.4 - Electrical Specifications

Files

Show all 14

Similar open opportunities

Opportunity Agency Set-aside Responses due
Airfield Lighting Computer System Langley AFB, Virginia 23665, United States · NAICS 238210 Air Combat Command No set-aside
Repair Electrical Systems Wright-Patterson AFB, OH 45433 (Area A, Area B and all other properties owned by Wright-Patterson Air Force Base, Ohio) 45433 · NAICS 238210 AFLCMC Wright Patterson AFB No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity