Att 2 DBA WD VA20260155.pdf
PDF 2 MB Posted
- Attached to
- Lights & Electric Repairs
- Solicitation number
- W50S9B26Q0004
- Issued by
-
Department of the Army National Guard
About this file
This is a Wage and Hour Division (WHD) General Decision document establishing prevailing wage rates for federal construction contracts in Virginia's Henrico County.
The determination covers building construction types and lists prevailing wage rates for multiple construction classifications effective from January 2, 2026, through May 18, 2026 (Modification 1). The wage rates are indexed by classification codes with effective dates ranging from 2023 to 2025, including positions such as: Asbestos Worker/Heat & Frost Insulator ($40.77 base rate with $20.17 fringes), Boilermaker ($38.97 base with $27.39 fringes), Electrician ($37.95 base with $18.02 fringes), Elevator Mechanic ($51.39 base with $38.44 fringes), Power Equipment Operator ($39.99-$40.99 base with $18.05 fringes), Ironworker ($31.00 base with $18.28 fringes), and Plumber ($33.25 base with $19.47 fringes). Additional classifications spanning laborers, operators, and specialized trades are listed with rates ranging from $12.28 to $27.18 base wages. The document explains rate identifier systems (union rates denoted by symbols such as ◉SU◉, ◉UAVG◉, ◉SA◉, ◉SC◉) and includes notes regarding Executive Orders 13706 and 13658 for paid sick leave and minimum wage requirements. Wage determination appeals procedures are outlined, directing inquiries to the WHD Branch of Wage Surveys or Construction Wage Determinations for initial decisions and the Wage and Hour Administrator for reconsiderations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers W50S9B26Q0004.pdf | ||
| Questions and Answers W50S9B26Q0004.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Questions and Answers W50S9B26Q0004.pdf | ||
| Att 4 SOW Replace Lights REV02 29 Jun 26.docx | DOCX document | |
| Att 5.3 Electrical Scope.pdf | ||
| Att 5.1 Lighting Scope.pdf | ||
| Att 1 Provisions and Clauses.pdf | ||
| Att 5.2 Emergency Lighting Layout.pdf | ||
| Att 5.4 – Electrical Specifications.docx | DOCX document | |
| Solicitation_W50S9B26Q0004.docx | DOCX document | |
| Att 3 Past Performance Questionnaire Package.docx | DOCX document | |
| Att 4 SOW Replace Lights REV01 18MAY26.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .