This is an Electrical Scope attachment providing a floor plan with specifications for electrical work to be performed in a first-floor area. The scope identifies five primary work items marked A through E on the architectural drawing.
The required work includes: locating and identifying existing wall-mounted clocks (Item A) and wall-mounted televisions (Item C); installing new standard outlets at approximately 12-18 inches below drop ceilings at multiple locations throughout the space (Item B); installing a new standard outlet at approximately 60-72 inches above finish floor height, with the contractor required to coordinate field location with the Owner prior to work initiation (Item D); and securing the cover of an existing wall-mounted LED flood light (Item E). The plan shows these items distributed across multiple areas of the first floor, with clusters of work locations identified in different zones of the facility. A critical requirement is that the contractor must coordinate with the Owner to field locate all outlets prior to performing any work on site to ensure proper placement and functionality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers W50S9B26Q0004.pdf | ||
| Questions and Answers W50S9B26Q0004.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Questions and Answers W50S9B26Q0004.pdf | ||
| Att 4 SOW Replace Lights REV02 29 Jun 26.docx | DOCX document | |
| Att 1 Provisions and Clauses.pdf | ||
| Att 5.2 Emergency Lighting Layout.pdf | ||
| Att 5.4 – Electrical Specifications.docx | DOCX document | |
| Att 5.1 Lighting Scope.pdf | ||
| Solicitation_W50S9B26Q0004.docx | DOCX document | |
| Att 2 DBA WD VA20260155.pdf | ||
| Att 3 Past Performance Questionnaire Package.docx | DOCX document | |
| Att 4 SOW Replace Lights REV01 18MAY26.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6.3- ELECTRICAL SCOPE
E
NOTES:
A: Location of existing wall mounted clock (+/-12"-18" below drop clg) B: Install new standard outlet (Field locate by Owner @+/-12"-18" below drop clg) C: Location of existing wall mounted TV D: Install new standard outlet at approx 60"-72" above finish floor - Contractor shall coordinate with OWNER to FIELD LOCATE OUTLETS prior to performing work on site E:Secure cover of existing, wall-mounted LED flood light
B A
B A
B A
D C
1551729105C Line
1551729105C Line
1551729105C Line
1551729105C Line
1551729105C Polygon