Kitchen Package for the Tulsa VAMC
Closed Solicitation Posted
- Solicitation number
- 36C24W25Q0338
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 335220 Major Household Appliance Manufacturing
- Place of performance
- Tulsa, Oklahoma 74127, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Eastern Oklahoma VA Health Care System is seeking a contractor to supply and install a complete commercial kitchen package for the new Tulsa VA Medical Center. The procurement includes 43 line items of food preparation and storage equipment such as utility carts, refrigeration units, ovens, griddles, dishwashers, sinks, worktables, and specialized kitchen infrastructure from manufacturers including ULINE, True Manufacturing, Dinex, Hamilton Beach, Rational, and others. The contractor must deliver and install all equipment in a cost-effective, efficient, and safe manner while coordinating access with the facility construction contractor and VHiT. Vendors must submit a completed Buy American Certificate with their quotes, and the contract will be awarded to a single contractor based on evaluation criteria under FAR Part 25 focusing on domestic origin and content of proposed products. The solicitation response deadline is September 8, 2025 at 12:00 PM Central Time, with vendor questions due by September 5, 2025.
This procurement is designated as a Total Small Business set-aside under NAICS code 335220 (Major Household Appliance Manufacturing) with a size standard of 500 employees. No incumbent contractors are identified in the solicitation documents. While no specific contract value is disclosed, the scope includes substantial commercial kitchen equipment with quantities ranging from 1 to 12 units per line item, including 12 three-shelf utility carts and 6 meal delivery carts among other equipment. The performance period requires delivery and installation between September 4, 2025 and October 3, 2025, with work conducted Monday through Friday from 8:00 AM to 4:00 PM. The place of performance is the Tulsa VA Medical Center located at 440 S. Houston Avenue, Tulsa, Oklahoma 74127, with the possibility of an alternate location within 15 miles if necessary.
Notice text
3 versions
Update #3 · Latest ·
NOTICE FOR REQUEST FOR QUOTE AMENDMENT
SOLICITATION NUMBER: 36C24W25Q0338
AMENDMENT NUMBER: 0004
DATE: September 02, 2025
PROJECT NUMBER: N/A
PROJECT TITLE: Kitchen Package
LOCATION: VA Medical Center, Tulsa, OK, 74127
REASON FOR AMENDMENT: Product Descriptions
_____________________________________________________________________
AMENDMENT: 0004
Question: 1 – Product Information:Please provide the dimensions for all custom stainless items. Some of them are missing in the specs.
VA Response: See attached document for product information.
THE DUE DATE FOR OFFERS REMAINS UNCHANGED September 08, 2025.
All other terms and conditions remain unchanged.
Update #2 ·
NOTICE FOR REQUEST FOR QUOTE AMENDMENT
SOLICITATION NUMBER: 36C24W25Q0338
AMENDMENT NUMBER: 0002
DATE: August 29, 2025
PROJECT NUMBER: N/A
PROJECT TITLE: Kitchen Package
LOCATION: VA Medical Center, Tulsa, OK, 74127
REASON FOR AMENDMENT: CAD Drawings, Status of Site, Ventilation, and Obstacles
______________________________________________________________________________ AMENDMENT: 0001
Question: 1 – CAD Drawings:Is there a CAD drawing of the kitchen available?
VA Response: We do not have access to up-to-date CAD files. All available and relevant drawings will be made available to the awarded vendor. Drawings will at minimum be PDFs of electrical, plumbing, and architectural features that are relevant. It is the contractor’s responsibility to verify any needed measurements and positions of MEP (mechanical, electrical, plumbing) in the field prior to purchasing equipment.
Question: 2 – Status of Site Condition: Will the site be total install ready for the equipment?
VA Response: The site will be ready for installation at the time of installation. There is a possibility of other contractors performing work in the space. If that is the case, appropriate scheduling and coordination will be done to ensure minimal disruption to work being performed.
Question: 3 – Ventilation: Correct electrical work and ventilation on site?
VA Response: Ventilation and electrical will be in place at the time of installation. The VA will be responsible for correcting any mechanical, electrical or plumbing infrastructure deficiencies if any are found.
Question: 4 – Kitchen Accessibility: Is the kitchen easily accessible? Any obstacles?
VA Response: The kitchen is on the first floor, with nearby elevators and exterior doors. The kitchen door openings are 44”.
THE DUE DATE FOR OFFERS REMAINS UNCHANGED September 08, 2025.
All other terms and conditions remain unchanged.
Update #1 ·
STATEMENT OF WORK (SOW)
Veterans’ Health Administration (VHA)
Eastern Oklahoma VA Health Care System (EOVAHCS)
Provision of NFS Kitchen
For the New Tulsa VA Medical Center
Brand Name or Equal
GENERAL
PURPOSE / OBJECTIVE: Eastern Oklahoma VA Health Care System (EOVAHCS) requires a contractor to supply and install various food preparation and storage equipment at the new Tulsa VA Medical Center. The contractor will be required to supply and install food preparation and storage equipment in the nutrition and food service area on the first floor in accordance with this statement of work in a cost effective, efficient, and safe manner, while in accordance with the VA Mission. The equipment will need to be delivered and installed in September of 2025 after the VA receives the building.
BACKGROUND: A facility in Tulsa, Oklahoma, is currently being renovated for the purpose of being used as the new Tulsa VA Medical Center (VAMC) in September 2025. The facility will need food preparation and storage equipment installed in September of 2025. The facility is currently under control of VHiT and the construction contractor remodeling the facility. Access to the facility must be coordinated between the awarded contractor and the COR for the project which will be subject to change based on the coordination with VHiT and the construction contractor.
LOCATION: The new Tulsa VA Medical Center will be located at 440 S. Houston Ave, Tulsa, Oklahoma 74127.
DELIVERY AND INSTALLATION TIMES (PERFORMANCE PERIOD): The VA requires the Contractor to deliver and install the products no earlier than September 4, 2025, and no later than October 3, 2025. Work is to take place during the following days/hours: Monday thru Friday, 8am to 4pm. Product Delivery to: Tulsa VA Medical Center, 440 S. Houston Ave, Tulsa, Oklahoma 74127. Location may change prior to delivery and must be verified prior to shipping with the VA POC. Alternate location, if used, will be within 15 miles of the above location.
SITE VISIT: An organized site visit is scheduled for Wednesday September 03, 2025, at 9:00AM CT. Only one site visit will be conducted. Participants are to meet at 211 S. Houston Ave, Tulsa, OK 74127.
PERFORMANCE PERIOD/DELIVERY TIMES: The VA requires delivery 120 Days After Receipt of Order (ARO).
SCOPE: EOVAHCS requires a contractor to provide Brand Name or Equal to the various equipment Manufactures listed below that meets or exceeds the salient physical, functional, and performance characteristics of the below listed equipment. The Entire Contract MUST be Awarded to One Contractor. The equipment features are essential to the technical requirements to meet the VA’s needs. The VA’s needs assessment identified the type of products and components listed below as a suitable solution. OEM part numbers/references, in the Specifications sections are used as a basis of design and are provided as a means to convey the minimum standard characteristics.
SALIENT PHYSICAL/FUNCTIONAL/PERFORMANCE CHARACTERISTICS:
EQUIPMENT:
Contractor must provide Brand Name or Equal products that meet or exceed the specifications in this table.
JSN
Manufacturer
Model
Item Description
Total Qty
F0535A
ULINE
460SCRT24363
3 Shelf SS Utility Cart
12
F0535B
New Age Industrial Corp
1176A
Cup/Glass Rack Dolly
4
K0810
Hamilton Beach
Hamilton Beach HBF510S
Blender, Heavy Duty, 1/2 Gal, CRS Bowl
1
k1280
Dinex
Dinex DXPTQC1T1D8
Compact Meal Delivery Cart
6
K1280A
Dinex
Dinex DXPTQ2T2DPT20
Cart, Tray Transport-20 Tray Capacity
4
K1610
True Manufacturing
TFP-48-18M-D-2
Refrigerated Sandwich Prep Table 48" Wide 18ea 1/6th Pan Model
1
K1610A
True Manufacturing
TFP-32-12M-D-2
Refrigerated Sandwich Prep Table 36"
1
K1850A
Foodservice Design Professionals
Custom
Two Compartment Sink
1
K1910A
Foodservice Design Professionals
Custom
Table, Work, Stainless Steel
1
K1910C
Foodservice Design Professionals
Custom
Table, Work, Stainless Steel
2
K1910E
Duke Manufacturing
Duke Manufacturing 314S-2448
Table, Work, Stainless Steel, 48in W x 24in D x 36in H
1
K2140
Dinex
DXPSBH2P
Dispenser, Plate, Mobile, Heated, 2 Stack
1
K2230
Dinex
DXPIDTS1C1622
Tray Dispenser
1
K2230A
Dinex
DXIBDRS270
Storage rack
4
K2620
Salvajor Company
P914
Disposal, Waste, Heavy Duty
2
K3100
Star Manufacturing
Star 736TCHSA
Flattop griddle - 36 IN
1
K3250
Berkel Equipment
M2000
Food Processor
1
K3420
EcoLab
EcoLab
Hose, Retractable, Wall Mounted
2
K3430
Traulsen
RHF-132WP
Cabinet, Heated, Holding Cabinet
1
K3640
Groen Unified Brands
162096
Kettle Boiler 2-2 1/2 gal - Manual Tilt, 2/3 Jacket, Direct Steam
1
K4550
Rational
ICP 6-Full/6-Full N/G
Combi Oven
1
K4550A
Groen Unified Brands
GSSP-BL-5GS Double
Dbl Convection Steamer - Gas
1
K4670
Panasonic Corporation of North America
NE-17523
Oven, Microwave, Heavy Duty
2
K4670A
Menumaster
MXP22TLT
Microwave, Heavy Duty
2
K4700
Vulcan
36S-6BN
Six Burner Range
1
K8200
Metro Shelving
MAX4-PR48VX3
Mobile Utensil Shelf
5
K8300
Hatco Corp
TQ-400
Toaster, Conveyor, 480 Slices-Hr, Electric
1
K8500
Cres Cor
207-UA-13A
PAN RACK
8
K9760
Insinger
SW12 Performer Pot and Pan Washer
Pot Pan Wash
1
M2055F
Advance Tabco
CR10-162M-X Mobile Aluminum Full Can Rack
Shelving, Storage, Can
1
R6100
Traulsen
RLT132WUT-FHS
Freezer, Food, Upright, CRS, 23-25 CUFT
1
R6100A
Traulsen
RLT232WUT-FHS
Freezer, Food, Upright, CRS, 50-52 CUFT
1
R7200
Traulsen
RHT132WUT-FHG
Hinged Glass Door Reach-In Refrigerators/Self-
Contained - 1DR
2
R7200A
Hatco Corp
ASU-10 S
Reach-In Refrigerator - 1DR - Air Curtain
6
U0065
T&S Brass
B-0610
Fill faucet
2
U0066
Foodservice Design Professionals
Dishtable 108" x30"
Soiled & Clean Dish Table
3
U0067
Hatco Corp
C-24
Booster heater
1
U0068
Foodservice Design Professionals
Custom
Sink, 3 Compartment w-Scrap Collect
1
U0069
Foodservice Design Professionals
Custom
Worktable - 48 in
1
U0072
Foodservice Design Professionals
Custom
Food Dish-Up Table
1
U0073
Randall Unified Brands
FX-1CSRE-290
Refrigerated equipment stand - 36 in
2
U0075
Foodservice Design Professionals
Custom
Worktable w-Sink
1
U7601
Aladdin Temp-Rite
HOD Advantage 14050 ADV650+
Heat On Demand Tray System
2
JSN
Manufacturer
Model
Item Description
Total Qty
F0535A
ULINE
460SCRT24363
3 Shelf SS Utility Cart
12
F0535B
New Age Industrial Corp
1176A
Cup/Glass Rack Dolly
4
K0810
Hamilton Beach
Hamilton Beach HBF510S
Blender, Heavy Duty, 1/2 Gal, CRS Bowl
1
k1280
Dinex
Dinex DXPTQC1T1D8
Compact Meal Delivery Cart
6
To ensure the proper installation, performance, and long-term functionality of the kitchen system, all equipment shall be sourced from the same manufacturer or authorized distributor where possible. Equipment consistency is essential to meet performance and safety requirements of the VA facility.
Consistent height, width, depth, utility connections, and materials across prep tables, sinks, hot food holding equipment, and refrigeration units ensure seamless installation, maximizes usable workspace, prevents misalignment with utilities, and minimizes safety hazards. Use of uniform equipment also simplifies maintenance, training, and warranty claims.
INSTALLATION: Installation schedule of equipment is to be coordinated with the VA COR. It is currently expected that the installation will occur after the VA accepts the completed facility. Installation means: Assemble as needed for equipment, place in locations shown on drawings (to be supplied upon award) and final connections to MEP and testing of functionality as needed. Field verification of layouts is required and placement within the room to be verified with the VA COR.
QUALITY
Conformance Standards
Refer to the section on Safety and Compliance in this SOW.
Rework
Rework is defined as replacing a product or performing the service again until the Purpose of this SOW is achieved in full. This involves less than Satisfactory Products or Service by the Contractor and as noted by the COR. Rework occurs at no additional cost to the Government. Payment will be withheld until all replacement products are received or services are performed to the Satisfactory level in accordance with this SOW and as documented by the COR.
DELIVERY:
Delivery and receipt of the proposed items are expected to be directed to the location identified in this SOW. Confirmation of delivery location will be provided by the VA COR post-award. Delivery must be coordinated with VA COR before any delivery attempts. Any item that has not been coordinated will be turned away and any additional charges will be the responsibility of the sender/transportation company.
Contractor is responsible for offloading the equipment from the truck and moving the equipment to the correct delivery location in space. Equipment, paperwork and warranty information must be handed to the receiving staff, as advised by the COR.
INSPECTION: Packaging/materials will be inspected upon delivery to the site. The VA will again inspect once notified that any given phase/room installation has been completed. If any damage is noted, the vendor will provide a timeline for replacement or repair to the VA COR. Any deficiency that could result in a delay to the completion of the installation must be remedied within 30 days. All other items are to be discussed with the VA COR and a bilateral agreement as to timeline for correction to be agreed upon by both parties.
The Government reserves the right to inspect and test services in accordance with this SOW and the Contract. The only individual authorized to officially accept services is the COR. While inspection of services may be delegated by the COR and a shared responsibility with departmental management staff, the COR is ultimately the only authorized individual to approve and accept services on behalf of the VA.
STANDARD BUSINESS HOURS AND FEDERAL HOLIDAYS
Hours: Normal duty hours are 8:00 a.m. through 5:00 p.m. CST, Monday through Friday, not including federal holidays. Whenever contact with a facility is required outside of normal duty hours, the Contractor shall coordinate these times with the designated COR.
New Year’s Day
January 1st
Martin Luther King’s Birthday
Third Monday in January
President’s Day
Last Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19th
Independence Day
July 4th
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veteran’s Day
November 11th
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25th
In addition to the days designated as holidays, the Government observes the following days:
- Any other day designated by Federal Statute
- Any other day designated by Executive Order
- Any other day designated by the President of the United States to be a Federal holiday.
SAFETY AND COMPLIANCE
The Contractor must perform services and ensure equipment functions in accordance with:
- local, state, and federal Occupational Safety and Health guidelines and legislation, to include Occupational Safety and Health Administration (OSHA), the American National Standards Institute (ANSI) safety guidelines.
- local, state, and federal guidelines and legislation, as well as VA Health Care System Directives and guidelines relating to chemicals and usage of chemicals, to include pesticides.
- local, state, and federal Fire and Safety legislation and guidelines, to include VA Health Care System directives and legislation on Fire and Safety, as well as the latest published edition of NFPA-99 (Health Care Facilities Code).
- local and state environmental laws as well as Environmental Protection Agency (EPA) regulations, Federal Insecticide, Fungicide and Rodenticide Act (FIFRA), involving pesticide use and other pest control procedures.
REGULATORY REQUIRMENTS: Environmental Protection Agency (EPA) 40 CFR.
-
- Food and Drug Administration (FDA) Quality System Regulation as stated in 21 CFR Part 820
- Department of Transportation (DOT) 49 CFR.
- Occupational Safety and Health Administration (OSHA)
- VHA DIRECTIVE 7708 Pollution Prevention Program
- VHA Directive 7707 Green Environmental Management Systems (GEMS)
Medical Center Policies
Each VA Medical Center has policies that are updated from time to time. The COR can provide more detailed information to the contractor of these upon commencement of the contract and throughout the term of the contract, as needed, especially policies regarding parking, possession of weapons, cell phone use and photography as well as smoking on VA property. Violations of such policies may result in individual fines or citation answerable in the United States (Federal) District Court.
Files
Show all 11
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| NX EQ Combi Oven | VA Strategic Acquisition Center Frederick | No set-aside | |
| H379 Mann-Grandstaff VA Medical Center Kitchen Equipment Regular Maintenance and Repairs | Veterans Integrated Service Network 20 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity