J056--Refurbish D wing Elevators

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24626B0019
Agency
Veterans Integrated Service Network 6 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238290 Other Building Equipment Contractors
PSC
J056 Maint/Repair/Rebuild Of Equipment- Construction And Building Materials
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 6 is soliciting sealed bids for the modernization and refurbishment of two existing hydraulic elevators (P-5 and P-6) at the Fayetteville VA Medical Center in North Carolina under Solicitation Number 36C24626B0019. The scope of work encompasses complete demolition of legacy systems, installation of non-proprietary modernization components (including microprocessor controllers such as BoD Smartrise or equivalent, hydraulic packages, and door equipment), machine-room and pit code upgrades, cab and hoistway door refurbishments, and full commissioning and turnover while maintaining hospital operations and life-safety. Contractors must be currently licensed elevator contractors with a minimum of five years of successful commercial elevator installation experience, employ certified mechanics, and comply with ASME A17.1 (2022), NFPA 70 (NEC 2023), IBC 2021, IMC 2024, IPC 2024, OSHA standards, and VA directives. The contract will be awarded as Firm-Fixed-Price based on sealed bid evaluation, with sealed bids due by March 23, 2026 at 2:00 PM EDT, a mandatory pre-bid site visit scheduled for February 18, 2026 at 10:00 AM EDT, and questions due to Contracting Officer Angelo Harris by February 26, 2026 at 2:00 PM EDT.

This solicitation is designated as a Total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-away with no current incumbents identified in the documents. The estimated contract value ranges between $1,000,000 and $5,000,000, with a required bid guarantee of 20 percent of the bid price. The project timeline spans approximately 445 days across 11 phases, with detailed requirements for Infection Control Risk Assessment (ICRA) compliance, separate Site Safety and Health Officer staffing, and acceptance testing by a qualified elevator inspector. Bidders must furnish performance and payment bonds upon award and comply with SDVOSB limitations on subcontracting (maximum 85 percent for general construction work). The work will be performed at the Fayetteville VA Medical Center located at 2300 Ramsey Street, Fayetteville, NC 28301, serving critical hospital departments including the Emergency Room, Imaging, Laboratory, ICU, and Operating Rooms.

Notice text

Refurbish D wing Elevators

Fayetteville VA Medical Center

Project No. 565-24-105

2

Scope of Work

Refurbish D wing Elevators

Fayetteville VA Medical Center

Fayetteville, NC

Project No. 565-24-105

CONSTRUCTION SCOPE OF WORK

Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary for modernization, refurbishment, installation, commissioning, and turnover of two existing D-Wing elevators P-5 and P-6 (hydraulic; 4,000 lb; 125 fpm; B/1/2 stops; duplex selective collective) serving the Emergency Room, Imaging, Laboratory, ICU, and Operating Rooms while maintaining hospital operations and life-safety. Work includes demolition of legacy systems, installation of non-proprietary modernization components, machine-room and pit code upgrades, cab and hoistway door refurbishments, ICRA-conforming phasing and barriers, commissioning, training, and full closeout. The finished elevators shall operate reliably and be executed in accordance with the final issued-for-construction documents, specifications, and applicable current VA, federal, state, and local codes and standards.

This project does require a site safety and health officer (SSHO) separate from the site superintendent.

Contractor shall furnish, install, test, and commission work in full compliance with:

ASME A17.1 (2022) Safety Code for Elevators and Escalators; acceptance test by QEI.

NFPA 70 (NEC 2023), IBC 2021, IMC 2024, IPC 2024 and applicable NFPA provisions.

OSHA (including asbestos and confined space standards, 29 CFR 1910/1926 as applicable).

VA directives, design manuals, and Master Specifications (PG-18-1); comply with VA safety signage, ICRA guidance, and VA Elevator design guidance.

Base bid shall include all items listed on the drawings and in the specifications.

Submit a detailed baseline schedule for VA approval, reflecting all phases of work, milestones, inspections, and commissioning activities.

Infection Control Risk Assessment (ICRA) & work restrictions:

Mechanical room: ICRA Class III.

Elevator lobbies (active work): ICRA Class III; predominantly night work; plastic barriers removed each morning and reinstated nightly.

Elevator shafts: ICRA Class II with one car kept active during the other car s work scope.

Provide negative air, HEPA filtration, dust-tight barriers, sticky mats, and debris management per approved ICRA plan. Schedule noisy/vibration work off-hours. Maintain egress, fire-life safety, and hospital security at all times.

Phasing & sequencing (contractor to detail means/methods):

Phase 1 (60 days): Engineer/vendor submittals for long-lead equipment.

Phase 2 (120 days): Material acquisition; establish ICRA barriers.

Phase 3 (14 days): Demolish old equipment; begin pit work/sump base.

Phase 4 (21 days): Paint half the mechanical room floor at P-5; 7-day cure; route/rough-in sump discharge to mech room; defer mech room wall paint to Phase 10.

Phase 5 (60 days): Install P-5 modernization equipment (incl. lobby call stations).

Phase 6 (30 days): Paint P-5 pit walls/floor; test and turnover P-5.

Phase 7 (7 days): Re-set ICRA barriers; prep P-6 for work (COR inspection/approval).

Phase 8 (28 days): Demolish P-6 equipment; pit work and floor paint with 7-day cure.

Phase 9 (45 days): Install P-6 modernization equipment.

Phase 10 (30 days): Paint mechanical room walls and pits; test and turnover P-6; complete BMS/EMCS connections and testing.

Phase 11 (30 days): Project closeout, O&M/Training; commissioning completed.

Total of 445 days.

Protect adjacent finishes; cap/terminate abandoned utilities; manage, containerize, and dispose of waste per VA environmental procedures (recycle where practicable).

If ACM is confirmed, perform abatement under the approved plan before disturbance.

Controls & operation:

Replace relay logic with a microprocessor controller (BoD Smartrise or equivalent), providing: simplex/duplex operation as required, emergency power capability, onboard diagnostics, landing control system, FF Service Phases 1 & 2, independent service, hoistway access, car-top operation, timed lighting/fan control, and emergency-power pre-transfer signal integration (two-wire from building switchgear).

Hydraulic package:

Replace/upgrade hydraulic machines and associated components (BoD EECO or equivalent): dry tanks, (Maxton/EECO or equivalent) control valves, motors, pumps, pit shut-off valves, and new Victaulic gaskets, complete with new wiring.

Door equipment:

Replace hall door equipment, car door operators, and car door equipment (BoD GAL or equivalent). Provide new hoistway doors with stainless steel skins; polish/renew existing stainless hall frames.

Fixtures & signaling:

Replace hall pushbuttons, main COP, auxiliary COP, combination hall direction/car position indicators, and emergency power jewel; integrate jewel pre-transfer signal (two-wire from switchgear to controller). (BoD Innovation for fixtures.)

Cab interiors:

New cab interiors, new flooring, new covers for the existing stainless side lighting (retain system, replace covers), new car doors; polish interior stainless steel. Elevators P-5/P-6 to match the new car scheme already deployed in D-Wing.

Machine Room:

Dedicated 110V car-light disconnect; car lights on a dedicated circuit (panel AB-2 has spares).

Illumination: provide 200 lux measured at floor.

GFCI outlet on a dedicated source.

Environmental: Provide exhaust/heat to maintain 45 90°F, 95% RH.

Sprinklers/detectors: If sprinklers present, install heat detector within 2' of each head and a smoke detector within 2' of each heat detector per NFPA 72 coordination.

Pits:

Lighting: provide 100 lux.

GFCI outlet on a dedicated circuit.

Sump pump: Install new sump pump at 3,000 gph capacity with single dedicated receptacle and discharge tank/piping per drawings. Paint pit walls to finished floor level with epoxy.

Elevator recall & FA interfaces:

Provide addressable devices and relay logic for primary/secondary recall and flashing hat function; integrate with the building s addressable system in accordance with current code.

Architectural & lobby scope:

Clean, prep, and finish existing stainless elevator jambs to receive new coating.

Vestibules (B, 1, 2): remove corner guards/bumper rails/base; prep and install new corner guards, bumper rails, base, and paint to Level 4 finish; match D-Wing standards.

Machine room walls: epoxy paint per phasing (Phase 10).

Mechanical scope:

Demo existing terminal unit/duct as indicated; install new constant-volume terminal unit and ductwork; coordinate clearances, access, and EMCS points.

Plumbing/sanitary scope:

Cap existing sump pit and add the new sump and discharge tank/piping per drawings; coordinate penetrations and firestopping.

Electrical/communications scope:

Provide all new elevator power/control wiring in conduit; no exposed cabling.

Coordinate normal/emergency power feeds, car-light circuit, GFCIs, FA interfaces, EMCS tie-ins, and signaling. Provide panel schedules and as-built risers.

Testing, commissioning, training:

Pre-functional checklists and functional testing for each elevator; integrate controls, FA/recall, emergency power, door protection, and ride quality.

Conduct A17.1-2022 Acceptance Test witnessed by licensed QEI; Contractor to schedule, provide load, and correct deficiencies.

Coordinate with VA-hired CxA for plan review, point-to-point verification, performance testing, and issue resolution through turnover.

Provide staff training (operator and maintenance) and furnish all manuals/tools.

Deliverables & closeout:

As-builts: Revit/CAD + PDF; record risers and device addresses.

O&M manuals: indexed, bound hard copies + editable digital (Word/Excel) and PDFs.

Warranties: per spec; include controller, drives, hydraulics, doors/operators, fixtures.

Spare parts/special tools: per manufacturer requirements.

Punch list: Correct all items within 15 working days of issuance; provide re-inspection; achieve COR acceptance.

Attachments

Files attached to this notice, newest first
File Type Posted
Specs.pdf PDF
565-24-105 Refurbish D Wing Elevators Stamped Drawings.pdf PDF
36C24626B0019 0001.docx DOCX document
36C24626B0019.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
J056--Refurbish D wing Elevators Construction Award Award Notice
J056--Refurbish D wing Elevators This notice · Latest solicitation Solicitation
J056--Refurbish D wing Elevators Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity