About this opportunity

The Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground is seeking proposals for the development, procurement, and fielding of a new generation of small Improved Environmental Control Units (IECUs) to replace legacy Environmental Control Units (ECUs). The solicitation is for a hybrid, single-award indefinite-delivery/indefinite-quantity (IDIQ) contract with firm-fixed-price, fixed-price economic price adjustment, and cost reimbursable contract line items. The contract will cover four IECU variants in 9,000 BTU/hr, 18,000 BTU/hr, and 36,000 BTU/hr capacities. Proposals will be evaluated on technical, management, pricing, past performance, and small business participation factors. The proposal due date is September 19, 2024.

This is a full and open competition with no set-aside designations. The anticipated ordering period is 10 years total, with a minimum contract value of $1,000 and a maximum of $450,000,000. The place of performance is Natick, MA. The North American Industry Classification System (NAICS) code is 333415 for Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.

Notice text

12 versions

Update #12 · Latest ·

9/04/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0007 04SEPT2024 s being is being updated to add  answer to question #95 in section M.

9/03/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024 is being posted. No new changes since 8/30/2024.

8/30/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add  answer to question #94 in section M, which directs to updates in Section C.  

8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M. 

8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M. 

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #11 ·

9/03/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024 is being posted. No new changes since 8/30/2024.

8/30/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add  answer to question #94 in section M, which directs to updates in Section C.  

8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M. 

8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M. 

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #10 ·

8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add  answer to question #94 in section M, which directs to updates in Section C.  

8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M. 

8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M. 

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #9 ·

8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M. 

8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M. 

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #8 ·

8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 20AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M. 

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #7 ·

8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #6 ·

8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.

8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #5 ·

8/16/2024 Attacment 0007 is being added as it was inadvertantly left off initial amendment. 

CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #4 ·

8/16/2024 CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #3 ·

8/15/2024:  See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government. 

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #2 ·

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

*An amendment is forthcoming to:  (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly. 

Update #1 ·

The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.

For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.

The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.

Files

File Type Posted
B08 Solicitation W911QY-24-R-0007 Amendment 0007 Conformed 04SEPT2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0007 04SEPT2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024.pdf PDF
B08 SAM updated Solicitation Amendment 0006 30Aug2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0005 28AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0004 27AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0003 20AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG.pdf PDF
Attachment 0007 Cost Price Workbook Final.xlsx XLSX spreadsheet
CDRLs A001 - 043 IECU Amnd 0002 Aug 16.zip ZIP file
CDRLs A001 - 043 IECU Amnd 0002.zip ZIP file
B08 Solicitation Att 0006 Small Business Subcontracting Worksheet.xlsx XLSX spreadsheet
B08 Solicitation Att 0009 Past Performance Assessment Questionnaire.pdf PDF
B08 Att 0005 Spare Parts for Contract Award.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0002 15AUG.pdf PDF
B08 Att 0003 Integrated Product Support SOW Final.pdf PDF
B08 Soliciatation W911QY24R0007 IECU (1).pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0001Conformed.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0001.pdf PDF
Exhibit A CDRLs.zip ZIP file
Att 0009 Past Performance Assessment Questionnaire.pdf PDF
Attachment 0003 Integrated Product Support SOW Final.pdf PDF
Attachment 0009 Past Performance Assessment Questionnaire Final.docx DOCX document
Attachment 0004 List of Acronyms Final.pdf PDF
Exhibit A CDRLs.zip ZIP file
B08 Soliciatation W911QY24R0007 IECU.pdf PDF
Attachment 0010 Cable Assembly Drawings Final.pdf PDF
Attachment 0002 Interface Standard MIL-STD-1408D (2 Apr 2009) Final.pdf PDF
Attachment 0006 Small Business Subcontracting Goals Worksheet.xlsx XLSX spreadsheet
Attachment 0001 Performance Purchase Description.pdf PDF
Attachment 0005 Spare parts pricing Final.xlsx XLSX spreadsheet
Attachment 0008 Past Performance Information Final.pdf PDF
Attachment 0007 Cost Price Workbook Final.xlsx XLSX spreadsheet
Show all 36

Similar open opportunities

Opportunity Agency Set-aside Responses due
Environmental control NAICS 333415 Construction and Equipment No set-aside
Army Enterprise HVAC Modernization and Lifecycle Sustainment Maintenance MICC Fort Sam Houston No set-aside
BPA - Air Conditioning and Warm Air Heating PSC 4120, 4130 Indian Head, Maryland 20640, United States · NAICS 333415 Naval Sea Systems Command Total Small Business
Cooler unit, air NAICS 333415 Naval Supply Systems Command No set-aside
Compressor unit, REF, in repair/modification of NAICS 333415 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity