Improved Environmental Control Units (9K/18K/36K IECU’s)
Closed Solicitation Posted
- Solicitation number
- W911QY24R0007
- Agency
-
ACC Aberdeen Proving Ground
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- PSC
- 4120 Air Conditioning Equipment
- Place of performance
- Natick, Massachusetts 01760, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground is seeking proposals for the development, procurement, and fielding of a new generation of small Improved Environmental Control Units (IECUs) to replace legacy Environmental Control Units (ECUs). The solicitation is for a hybrid, single-award indefinite-delivery/indefinite-quantity (IDIQ) contract with firm-fixed-price, fixed-price economic price adjustment, and cost reimbursable contract line items. The contract will cover four IECU variants in 9,000 BTU/hr, 18,000 BTU/hr, and 36,000 BTU/hr capacities. Proposals will be evaluated on technical, management, pricing, past performance, and small business participation factors. The proposal due date is September 19, 2024.
This is a full and open competition with no set-aside designations. The anticipated ordering period is 10 years total, with a minimum contract value of $1,000 and a maximum of $450,000,000. The place of performance is Natick, MA. The North American Industry Classification System (NAICS) code is 333415 for Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.
Notice text
12 versions
Update #12 · Latest ·
9/04/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0007 04SEPT2024 s being is being updated to add answer to question #95 in section M.
9/03/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024 is being posted. No new changes since 8/30/2024.
8/30/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add answer to question #94 in section M, which directs to updates in Section C.
8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M.
8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M.
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #11 ·
9/03/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024 is being posted. No new changes since 8/30/2024.
8/30/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add answer to question #94 in section M, which directs to updates in Section C.
8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M.
8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M.
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #10 ·
8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0006 30AUG2024 is being updated to add answer to question #94 in section M, which directs to updates in Section C.
8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M.
8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M.
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #9 ·
8/28/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed 28AUG" is being updated to correct a typo in the answer to question #92 in section M.
8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 27AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M.
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #8 ·
8/27/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0004 Conformed 20AUG" is being updated to add questions and answers (Q&A) 92 & 93 to section M.
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #7 ·
8/20/2024 B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG" is being updated for the proposal's due date extension to 19 SEPT 2024 10:00AM.
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #6 ·
8/18/2024 "B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG" is being updated.
8/16/2024 Attachment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #5 ·
8/16/2024 Attacment 0007 is being added as it was inadvertantly left off initial amendment.
CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #4 ·
8/16/2024 CDRLs are being updated to reflect proper CLIN reference. Nothing else within CDRLs has changed. Use "CDRLs A001 - 043 IECU Amnd 0002 Aug 16."
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #3 ·
8/15/2024: See Amendment 0002 to Solicitation answering questions asked and providing updated documents. Please note the brief extension for proposal submission. Questions are no longer being accepted unless they prove to be critical to proposal submission and in the interest of the Government.
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #2 ·
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
*An amendment is forthcoming to: (1) provide answers to questions asked; (2) change the 10-year total performance to now be a 5-year base and a 5-year ordering period IAW with DFARS 217.204 (e)(i); and, (3) provide extension to the proposal submission date accordingly.
Update #1 ·
The 9K/18K/36K IECU Program represents a comprehensive effort to develop, procure, and field a new generation of small IECUs to replace legacy Environmental Control Units (ECUs) currently in use, which are heavy, inefficient and utilize ozone depleting refrigerants.
For this acquisition, based upon program priorities and available funding, four basic “Horizontal Compact” IECU variants will be produced as follows: 1) 9,000 BTUH, 115 volt, single phase, 50/60 Hertz; 2) 18,000 BTUH, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-BTUH, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-BTUH, 208 volt, 3 phase, 50/60 Hertz.
The Government plans to award a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) contract
with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA) and a small percentage of cost
reimbursable CLINs, of which any combination will constitute a delivery order. The anticipated ordering period will
be a total of ten (10) years.
Files
Show all 36
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Environmental control | Construction and Equipment | No set-aside | |
| Army Enterprise HVAC Modernization and Lifecycle Sustainment Maintenance | MICC Fort Sam Houston | No set-aside | |
| BPA - Air Conditioning and Warm Air Heating PSC 4120, 4130 | Naval Sea Systems Command | Total Small Business | |
| Cooler unit, air | Naval Supply Systems Command | No set-aside | |
| Compressor unit, REF, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity