Attachment 0007 Cost Price Workbook Final.xlsx
XLSX spreadsheet 39 KB Posted
- Solicitation number
- W911QY24R0007
About this file
This document is a pricing workbook attachment related to a federal contract opportunity for Improved Environmental Control Units (IECUs). The contract includes four IECU variants: 9,000 BTU/hr, 18,000 BTU/hr single phase, 18,000 BTU/hr three-phase, and 36,000 BTU/hr three-phase.
The contract is structured as a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA), and cost reimbursable contract line items. The ordering period is 10 years. The workbook provides pricing details for the IECU units, production verification testing, first article testing, production, technical/engineering support, logistics support, and various data products. The workbook also includes pricing templates for shipping, travel, spare parts, and labor rates.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Evaluated Price
| See other tabs for data entry - Amounts will flow automatically. DO NOT change any formulas, formatting, or move any cells | ||
| System Support Package | $0.00 | |
| PVT Units | $0.00 | |
| Conduct PVT | $0.00 | |
| FAT Units | $0.00 | |
| Conduct FAT | $0.00 | |
| Conduct PCA | $0.00 | |
| 9K Production | $0.00 | |
| 18K-1 Production | $0.00 | |
| 18K-3 Production | $0.00 | |
| 36 K Production | $0.00 | |
| CDRLs | $0.00 | Data License Rights not included |
| TOTAL EVALUATED PRICE | $0.00 |
Base CLINs
| Base CLINs | Fill in YELLOW cells with prices for one unit (quantity information is provided to help you provide a unit price) | |||||
| DO NOT CHANGE any formulas, formatting, or move any cells | ||||||
| Contract | Year | Description | Qty | $ | ||
| CLIN | SECTION | CDRL | ||||
| Group 1. Preparation |
| SubGroup 1a. 9K | |||||
| 0001 | C.8 | n/ap | FY25 | System Support Package (SSP, 9K) | 1 |
| 0002 | C.9.1 | n/ap | FY25 | Fabricate Production Verification Test (PVT) Units (9K) | 8 |
| 0003 | C.9.5 | n/ap | FY25 | Conduct PVT (9K) | 1 |
| 0004 | C.10.1 | n/ap | FY25 | Fabricate First Article Test (FAT) Units (9K) | 8 |
| 0005 | C.10.5 | n/ap | FY25 | Conduct FAT (9K) | 1 |
| 0006 | C.10.8 | n/ap | FY25 | Conduct Physical Configuration Audit (PCA, 9K) | 1 |
| SubGroup 1a. 18K-1 | |||||
| 0007 | C.8 | n/ap | FY25 | System Support Package (SSP, 18K-1) | 1 |
| 0008 | C.9.1 | n/ap | FY25 | Fabricate Production Verification Test (PVT) Units (18K-1) | 8 |
| 0009 | C.9.5 | n/ap | FY25 | Conduct PVT (18K1) | 1 |
| 0010 | C.10.1 | n/ap | FY25 | Fabricate First Article Test (FAT) Units (18K-1) | 8 |
| 0011 | C.10.5 | n/ap | FY25 | Conduct FAT (18K-1) | 1 |
| 0012 | C.10.8 | n/ap | FY25 | Conduct Physical Configuration Audit (PCA, 18K-1) | 1 |
| SubGroup 1a. 18K-3 | |||||
| 0013 | C.8 | n/ap | FY25 | System Support Package (SSP, 18K-3) | 1 |
| 0014 | C.9.1 | n/ap | FY25 | Fabricate Production Verification Test (PVT) Units (18K-3) | 8 |
| 0015 | C.9.5 | n/ap | FY25 | Conduct PVT (18K-3) | 1 |
| 0016 | C.10.1 | n/ap | FY25 | Fabricate First Article Test (FAT) Units (18K-3) | 8 |
| 0017 | C.10.5 | n/ap | FY25 | Conduct FAT (18K-3) | 1 |
| 0018 | C.10.8 | n/ap | FY25 | Conduct Physical Configuration Audit (PCA, 18K-3) | 1 |
| SubGroup 1a. 36K | |||||
| 0019 | C.8 | n/ap | FY25 | System Support Package (SSP, 36K) | 1 |
| 0020 | C.9.1 | n/ap | FY25 | Fabricate Production Verification Test (PVT) Units (36K) | 8 |
| 0021 | C.9.5 | n/ap | FY25 | Conduct PVT (36K) | 1 |
| 0022 | C.10.1 | n/ap | FY25 | Fabricate First Article Test (FAT) Units (36K) | 8 |
| 0023 | C.10.5 | n/ap | FY25 | Conduct FAT (36K) | 1 |
| 0024 | C.10.8 | n/ap | FY25 | Conduct Physical Configuration Audit (PCA, 36K) | 1 |
Group 2. Production
| SubGroup 2d. Technical & Engineering Support | |||||||
| 0028 | C.12 | n/ap | FY25 | Contractor Technical and Engineering Support | 1 | NSP | Priced separately on each order |
| 0028 | C.12 | n/ap | FY26 | Contractor Technical and Engineering Support | 1 | NSP | Priced separately on each order |
| 0028 | C.12 | n/ap | FY27 | Contractor Technical and Engineering Support | 1 | NSP | Priced separately on each order |
| 0028 | C.12 | n/ap | FY28 | Contractor Technical and Engineering Support | 1 | NSP | Priced separately on each order |
| 0028 | C.12 | n/ap | FY29 | Contractor Technical and Engineering Support | 1 | NSP | Priced separately on each order |
| SubGroup 2e. Logistics Support | |||||||
| 0029 | C.13 | n/ap | FY25 | Contractor Logisitics Support | 1 | NSP | Priced separately on each order |
| 0029 | C.13 | n/ap | FY26 | Contractor Logisitics Support | 1 | NSP | Priced separately on each order |
| 0029 | C.13 | n/ap | FY27 | Contractor Logisitics Support | 1 | NSP | Priced separately on each order |
| 0029 | C.13 | n/ap | FY28 | Contractor Logisitics Support | 1 | NSP | Priced separately on each order |
| 0029 | C.13 | n/ap | FY29 | Contractor Logisitics Support | 1 | NSP | Priced separately on each order |
Group 3. Data Products
| 0034/2009 | C.SS.4.1 | A001 | FY25 | Safety Assessment Report (SAR) | 4 | |
| 0034/2009 | C.6.2.2 | A002 | FY25 | Concept Design Review (CoDR) | 4 | |
| 0034/2009 | C.6.2.3 | A003 | FY25 | Preliminary Design Review (PDR) | 4 | |
| 0034/2009 | C.6.2.4 | A004 | FY25 | Critical Design Review (CDR) | 4 | |
| 0034/2009 | C.9.7 | A005 | FY25 | Production Verification Test (PVT) Report (PVTR) | 4 | |
| 0034/2009 | C.10.7 | A006 | FY25 | First Article Test (FAT) Report (FATR) | 4 | |
| 0034/2009 | C.21.1 | A007 | FY25 | Technical Data Package (TDP), Level 3 | 4 | |
| 0034/2009 | C.21.2 | A008 | FY25 | Data License Agreement (DLA) | 4 | |
| 0034/2009 | C.10.8 | A009 | FY25 | Physical Configuration Audit (PCA) Plan and Report | 4 | |
| 0034/2009 | C.22 | A010 | FY25 | Failure Modes, Effects, and Criticality Analysis (FMECA) | 4 | |
| 0034/2009 | IPSSOW | A011 | FY25 | Fault Tree Analysis (FTA) | 4 | |
| 0034/2009 | IPSSOW | A012 | FY25 | Maintenance Task Analysis (MTA) | 4 | |
| 0034/2009 | IPSSOW | A013 | FY25 | Level of Repair Analysis (LORA) | 4 | |
| 0034/2009 | IPSSOW | A014 | FY25 | Maintenance Allocation Chart (MAC) | 4 | |
| 0034/2009 | IPSSOW | A015 | FY25 | Provisioning Parts List (PPL) | 4 | |
| 0034/2009 | IPSSOW | A016 | FY25 | Engineering Data for Provisioning (EDFP) | 4 | |
| 0034/2009 | IPSSOW | A017 | FY25 | Technical Manual (TM) Validation Plan and Report (TMVPR) | 4 | |
| 0034/2009 | IPSSOW | A018 | FY25 | TM Operation and Maintenance, including Repair Parts and Special Tools List (-12&P TM) | 4 | |
| 0034/2009 | IPSSOW | A019 | FY25 | Interactive Multi-Media Instruction (IMI) | 4 | |
| 0034/2009 | IPSSOW | A020 | FY25 | Conduct of Training (CoT, OPNET) | 4 | |
| 0034/2009 | IPSSOW | A021 | FY25 | Program of Instruction (PoI, OPNET) | 4 | |
| 0034/2009 | IPSSOW | A022 | FY25 | Instructional Performance Requirements Document (IPRD, OPNET) | 4 | |
| 0034/2009 | IPSSOW | A023 | FY25 | Lesson Plan/Student Handouts/Visual Aids (LP-SG-VA, OPNET) | 4 | |
| 0034/2009 | IPSSOW | A024 | FY25 | Lesson Plan/Student Handouts/Visual Aids (LP-SG-VA, FLMNET) | 4 | |
| 0034/2009 | IPSSOW | A025 | FY25 | Logistics Management Information (LMI), Preservation & Packaging | 4 | |
| 0034/2009 | IPSSOW | A026 | FY25 | Program of Instruction (PoI, FLMNET) | 4 | |
| 0034/2009 | IPSSOW | A027 | FY25 | Instructional Performance Requirements Document (IPRD, FLMNET) | 4 | |
| 0034/2009 | IPSSOW | A028 | FY25 | Conduct of Training (CoT, FLMNET) | 4 | |
| 0034/2009 | IPSSOW | A029 | FY25 | Parts Screening Data (PSD) | 4 | |
| 0034/2009 | IPSSOW | A030 | FY25 | Proposed Spare Parts List (PSPL) | 4 | |
| 0034/2009 | IPSSOW | A031 | FY25 | Modification Work Order (MWO) | 4 | |
| 0034/2009 | IPSSOW | A032 | FY25 | MWO Plan & Report (MWOP) | 4 | |
| 0034/2009 | IPSSOW | A033 | Y1-5 | Monthly Status Report/Integrated Master Schedule (MSR) | 60 | |
| 0034/2009 | IPSSOW | A034 | FY25 | Production Verification Test (PVT) Plan | 4 | |
| 0034/2009 | IPSSOW | A035 | FY25 | First Article Test (FAT) Plan | 4 | |
| 0034/2009 | IPSSOW | A036 | FY25 | Care of Supplies in Storage Plan (COSIS) | 4 | |
| 0034/2009 | IPSSOW | A037 | FY25 | Contractor Quality Assurance Plan (CQAP) | 4 | |
| 0034/2009 | IPSSOW | A038 | FY25 | Production Acceptance Test and Inspection Plan (PATIP) | 1 | NSP |
| 0034/2009 | IPSSOW | A039 | FY25 | Configuration Control Documents (CCD) | 1 | NSP |
| 0034/2009 | IPSSOW | A040 | FY25 | System Support Package Component List (SSPCL) | 4 | |
| 0034/2009 | IPSSOW | A041 | FY25 | TM Quality Assurance Plan (TMQAP) | 1 | |
| 0034/2009 | IPSSOW | A042 | FY25 | Arsenal Utilization Report (AUR) | 4 | |
| 0034/2009 | IPSSOW | A043 | FY25 | Special Packaging Instruction (SPI) | 4 |
Cost CLINs
| Cost CLINs | The Government has provided values for Shipping and Travel as these are COST CLINs | ||||||||||
| OPTION | |||||||||||
| Contract | Year | Description | $ | Contract | Year | Description | $ | ||||
| CLIN | SECTION | CDRL | CLIN | SECTION | CDRL | ||||||
| Shipping | Shipping | ||||||||||
| 0025 | C.14 | n/ap | FY25 | Shipping | $50,000 | 2000 | C.14 | n/ap | FY30 | Shipping | $50,000 |
| 0025 | C.14 | n/ap | FY26 | Shipping | $50,000 | 2000 | C.14 | n/ap | FY31 | Shipping | $50,000 |
| 0025 | C.14 | n/ap | FY27 | Shipping | $100,000 | 2000 | C.14 | n/ap | FY32 | Shipping | $100,000 |
| 0025 | C.14 | n/ap | FY28 | Shipping | $100,000 | 2000 | C.14 | n/ap | FY33 | Shipping | $100,000 |
| 0025 | C.14 | n/ap | FY29 | Shipping | $100,000 | 2000 | C.14 | n/ap | FY34 | Shipping | $100,000 |
| Travel | Travel | ||||||||||
| 0026 | C.13 | n/ap | FY25 | Contractor Travel | $50,000 | 2001 | C.13 | n/ap | FY30 | Contractor Travel | $50,000 |
| 0026 | C.13 | n/ap | FY26 | Contractor Travel | $75,000 | 2001 | C.13 | n/ap | FY31 | Contractor Travel | $75,000 |
| 0026 | C.13 | n/ap | FY27 | Contractor Travel | $75,000 | 2001 | C.13 | n/ap | FY32 | Contractor Travel | $75,000 |
| 0026 | C.13 | n/ap | FY28 | Contractor Travel | $75,000 | 2001 | C.13 | n/ap | FY33 | Contractor Travel | $75,000 |
| 0026 | C.13 | n/ap | FY29 | Contractor Travel | $75,000 | 2001 | C.13 | n/ap | FY34 | Contractor Travel | $75,000 |
Spare Parts Attachment 0005
| Fill in YELLOW cells with price for one unit | |||||||||
| CLIN 0027 | FY25 | FY26 | FY27 | FY28 | FY29 | ||||
| Item Name | IECU | Part Number | NSN | UOM | Unit price | Unit price | Unit price | Unit price | Unit price |
| Cable Assembly, IECU 5000, Power - Straight | 9K | A1-48493D-1 | 6150-01-702-6823 | Each | |||||
| Cable Assembly, IECU 5000, Power - Angle | 9K | A1-48493D-2 | 6150-01-702-6823 | ||||||
| Cable Assembly, IECU 5100, Power - Straight | 18K-1 | A1-48494D-1 | 6150-01-702-7081 | ||||||
| Cable Assembly, IECU 5100, Power - Angle | 18K-1 | A1-48494D-2 | 6150-01-702-7081 | ||||||
| Cable Assembly, IECU 5200, Power - Straight | 18K-3 | A1-48495D-1 | 6150-01-702-7050 | ||||||
| Cable Assembly, IECU 5200, Power - Angle | 18K-3 | A1-48495D-2 | 6150-01-702-7050 | ||||||
| Cable Assembly, IECU 5300 or 5500, Power - Straight | 36K | A1-48496D-1 | 6150-01-702-7097 | ||||||
| Cable Assembly, IECU 5300 or 5500, Power - Angle | 36K | A1-48496D-2 | 6150-01-702-7097 | ||||||
| CLIN 2002 | FY30 | FY31 | FY32 | FY33 | FY34 | ||||
| Item Name | IECU | Part Number | NSN | UOM | Unit price | Unit price | Unit price | Unit price | Unit price |
| Cable Assembly, IECU 5000, Power - Straight | 9K | A1-48493D-1 | 6150-01-702-6823 | Each | |||||
| Cable Assembly, IECU 5000, Power - Angle | 9K | A1-48493D-2 | 6150-01-702-6823 | ||||||
| Cable Assembly, IECU 5100, Power - Straight | 18K-1 | A1-48494D-1 | 6150-01-702-7081 | ||||||
| Cable Assembly, IECU 5100, Power - Angle | 18K-1 | A1-48494D-2 | 6150-01-702-7081 | ||||||
| Cable Assembly, IECU 5200, Power - Straight | 18K-3 | A1-48495D-1 | 6150-01-702-7050 | ||||||
| Cable Assembly, IECU 5200, Power - Angle | 18K-3 | A1-48495D-2 | 6150-01-702-7050 | ||||||
| Cable Assembly, IECU 5300 or 5500, Power - Straight | 36K | A1-48496D-1 | 6150-01-702-7097 | ||||||
| Cable Assembly, IECU 5300 or 5500, Power - Angle | 36K | A1-48496D-2 | 6150-01-702-7097 |
Labor Rates
| Direct Labor Rates | Propose labor categories selected from the following source: | |||||||||||
| 2018 SOC Manual (Entire Manual) (bls.gov) | ||||||||||||
| https://www.bls.gov/soc/ | ||||||||||||
| Provide fully burdened hourly labor rates (including profit) to meet scope of work for CLIN 0028/2003 and CLIN 0029/2004. | ||||||||||||
| Provide the basis for the proposed labor rates included, identifying any escalation rates and the profit rate (see Basis for Labor Rates tab). | ||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Year 10 | ||
| Labor Category | Labor Hours | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate | Labor Rate |
https://www.bls.gov/soc/2018/soc_2018_manual.pdfhttps://usg01.safelinks.protection.office365.us/?url=https%3A%2F%2Fwww.bls.gov%2Fsoc%2F&data=05%7C02%7Cjoann.mattos.civ%40army.mil%7Cccd4d0e3ace4472d2f2308dcbd57db75%7Cfae6d70f954b481192b60530d6f84c43%7C0%7C0%7C638593432260463785%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=ZWrzNvEpIycKsYpUm043SxenypDaJ13rrlJhHlwH4bc%3D&reserved=0 Basis for Labor Rates
| Basis of Labor Rates CLIN 0028/2003 and CLIN 0029/2004 |
| Provide basis for direct labor rate: |
| . |
| Provide your fringe rate and basis: |
| Provide your labor overhead rate and basis: |
| Provide your G&A rate and basis: |
| Identify the profit rate and basis. |
| Identify any escalation applied and the basis for the escalation. |
Unit Production
| Unit Production | Fill in YELLOW cells with per unit price indexed to quantity | ||||||||||
| DO NOT CHANGE any formulas, formatting, or move any cells | |||||||||||
| Contract | Year | Description | Per Unit Based on Quantity | ||||||||
| CLIN | SECTION | CDRL | 1 | 2-10 | 11-25 | 26-50 | 51-100 | 101-200 | 201-500+ | ||
| 0030 / 2005 | C.11.1 | n/ap | FY25 | IECU - 9 kBTU/hr, 115 VAC, single-phase, Y1 | |||||||
| 0031 / 2006 | C.11.1 | n/ap | FY25 | IECU - 18 kBTU/hr, 230 VAC, single-phase, Y1 | |||||||
| 0032 / 2007 | C.11.1 | n/ap | FY25 | IECU - 18 kBTU/hr, 208 VAC, 3-phase, Y1 | |||||||
| 0033 / 2008 | C.11.1 | n/ap | FY25 | IECU - 36 kBTU/hr, 208 VAC, 3-phase, Y1 | |||||||
| 0030 / 2005 | C.11.1 | n/ap | FY26 | IECU - 9 kBTU/hr, 115 VAC, single-phase, Y2 | |||||||
| 0031 / 2006 | C.11.1 | n/ap | FY26 | IECU - 18 kBTU/hr, 230 VAC, single-phase, Y2 | |||||||
| 0032 / 2007 | C.11.1 | n/ap | FY26 | IECU - 18 kBTU/hr, 208 VAC, 3-phase, Y2 | |||||||
| 0033 / 2008 | C.11.1 | n/ap | FY26 | IECU - 36 kBTU/hr, 208 VAC, 3-phase, Y2 |
File details come from the government source that posted it. Updated .