Attachment 0007 Cost Price Workbook Final.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Improved Environmental Control Units (9K/18K/36K IECU’s)
Solicitation number
W911QY24R0007
Issued by

About this file

This document is a pricing workbook attachment related to a federal contract opportunity for Improved Environmental Control Units (IECUs). The contract includes four IECU variants: 9,000 BTU/hr, 18,000 BTU/hr single phase, 18,000 BTU/hr three-phase, and 36,000 BTU/hr three-phase.

The contract is structured as a hybrid, single award indefinite-delivery/indefinite-quantity (IDIQ) with firm-fixed-price (FFP), fixed-price economic price adjustment (FP-EPA), and cost reimbursable contract line items. The ordering period is 10 years. The workbook provides pricing details for the IECU units, production verification testing, first article testing, production, technical/engineering support, logistics support, and various data products. The workbook also includes pricing templates for shipping, travel, spare parts, and labor rates.

View the file

Other files

File Type Posted
B08 Solicitation W911QY-24-R-0007 Amendment 0007 04SEPT2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0007 Conformed 04SEPT2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0006 Conformed 30AUG2024.pdf PDF
B08 SAM updated Solicitation Amendment 0006 30Aug2024.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0005 Conformed.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0005 28AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0004 27AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0003 20AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0003 Conformed 20AUG.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG.pdf PDF
CDRLs A001 - 043 IECU Amnd 0002 Aug 16.zip ZIP file
B08 Att 0003 Integrated Product Support SOW Final.pdf PDF
B08 Att 0005 Spare Parts for Contract Award.pdf PDF
B08 Solicitation Att 0009 Past Performance Assessment Questionnaire.pdf PDF
B08 Solicitation Att 0006 Small Business Subcontracting Worksheet.xlsx XLSX spreadsheet
B08 Solicitation W911QY-24-R-0007 Amendment 0002 15AUG.pdf PDF
CDRLs A001 - 043 IECU Amnd 0002.zip ZIP file
B08 Solicitation W911QY-24-R-0007 Amendment 0002 Conformed 15AUG.pdf PDF
B08 Soliciatation W911QY24R0007 IECU (1).pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0001Conformed.pdf PDF
B08 Solicitation W911QY-24-R-0007 Amendment 0001.pdf PDF
Exhibit A CDRLs.zip ZIP file
Att 0009 Past Performance Assessment Questionnaire.pdf PDF
Attachment 0003 Integrated Product Support SOW Final.pdf PDF
B08 Soliciatation W911QY24R0007 IECU.pdf PDF
Attachment 0002 Interface Standard MIL-STD-1408D (2 Apr 2009) Final.pdf PDF
Attachment 0010 Cable Assembly Drawings Final.pdf PDF
Attachment 0006 Small Business Subcontracting Goals Worksheet.xlsx XLSX spreadsheet
Attachment 0007 Cost Price Workbook Final.xlsx XLSX spreadsheet
Attachment 0008 Past Performance Information Final.pdf PDF
Attachment 0004 List of Acronyms Final.pdf PDF
Attachment 0009 Past Performance Assessment Questionnaire Final.docx DOCX document
Exhibit A CDRLs.zip ZIP file
Attachment 0001 Performance Purchase Description.pdf PDF
Attachment 0005 Spare parts pricing Final.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Evaluated Price

See other tabs for data entry - Amounts will flow automatically. DO NOT change any formulas, formatting, or move any cells
System Support Package$0.00
PVT Units$0.00
Conduct PVT$0.00
FAT Units$0.00
Conduct FAT$0.00
Conduct PCA$0.00
9K Production$0.00
18K-1 Production$0.00
18K-3 Production$0.00
36 K Production$0.00
CDRLs$0.00Data License Rights not included
TOTAL EVALUATED PRICE$0.00

Base CLINs

Base CLINsFill in YELLOW cells with prices for one unit (quantity information is provided to help you provide a unit price)
DO NOT CHANGE any formulas, formatting, or move any cells
ContractYearDescriptionQty$
CLINSECTIONCDRL
Group 1. Preparation
SubGroup 1a. 9K
0001C.8n/apFY25System Support Package (SSP, 9K)1
0002C.9.1n/apFY25Fabricate Production Verification Test (PVT) Units (9K)8
0003C.9.5n/apFY25Conduct PVT (9K)1
0004C.10.1n/apFY25Fabricate First Article Test (FAT) Units (9K)8
0005C.10.5n/apFY25Conduct FAT (9K)1
0006C.10.8n/apFY25Conduct Physical Configuration Audit (PCA, 9K)1
SubGroup 1a. 18K-1
0007C.8n/apFY25System Support Package (SSP, 18K-1)1
0008C.9.1n/apFY25Fabricate Production Verification Test (PVT) Units (18K-1)8
0009C.9.5n/apFY25Conduct PVT (18K1)1
0010C.10.1n/apFY25Fabricate First Article Test (FAT) Units (18K-1)8
0011C.10.5n/apFY25Conduct FAT (18K-1)1
0012C.10.8n/apFY25Conduct Physical Configuration Audit (PCA, 18K-1)1
SubGroup 1a. 18K-3
0013C.8n/apFY25System Support Package (SSP, 18K-3)1
0014C.9.1n/apFY25Fabricate Production Verification Test (PVT) Units (18K-3)8
0015C.9.5n/apFY25Conduct PVT (18K-3)1
0016C.10.1n/apFY25Fabricate First Article Test (FAT) Units (18K-3)8
0017C.10.5n/apFY25Conduct FAT (18K-3)1
0018C.10.8n/apFY25Conduct Physical Configuration Audit (PCA, 18K-3)1
SubGroup 1a. 36K
0019C.8n/apFY25System Support Package (SSP, 36K)1
0020C.9.1n/apFY25Fabricate Production Verification Test (PVT) Units (36K)8
0021C.9.5n/apFY25Conduct PVT (36K)1
0022C.10.1n/apFY25Fabricate First Article Test (FAT) Units (36K)8
0023C.10.5n/apFY25Conduct FAT (36K)1
0024C.10.8n/apFY25Conduct Physical Configuration Audit (PCA, 36K)1

Group 2. Production

SubGroup 2d. Technical & Engineering Support
0028C.12n/apFY25Contractor Technical and Engineering Support1NSPPriced separately on each order
0028C.12n/apFY26Contractor Technical and Engineering Support1NSPPriced separately on each order
0028C.12n/apFY27Contractor Technical and Engineering Support1NSPPriced separately on each order
0028C.12n/apFY28Contractor Technical and Engineering Support1NSPPriced separately on each order
0028C.12n/apFY29Contractor Technical and Engineering Support1NSPPriced separately on each order
SubGroup 2e. Logistics Support
0029C.13n/apFY25Contractor Logisitics Support1NSPPriced separately on each order
0029C.13n/apFY26Contractor Logisitics Support1NSPPriced separately on each order
0029C.13n/apFY27Contractor Logisitics Support1NSPPriced separately on each order
0029C.13n/apFY28Contractor Logisitics Support1NSPPriced separately on each order
0029C.13n/apFY29Contractor Logisitics Support1NSPPriced separately on each order

Group 3. Data Products

0034/2009C.SS.4.1A001FY25Safety Assessment Report (SAR)4
0034/2009C.6.2.2A002FY25Concept Design Review (CoDR)4
0034/2009C.6.2.3A003FY25Preliminary Design Review (PDR)4
0034/2009C.6.2.4A004FY25Critical Design Review (CDR)4
0034/2009C.9.7A005FY25Production Verification Test (PVT) Report (PVTR)4
0034/2009C.10.7A006FY25First Article Test (FAT) Report (FATR)4
0034/2009C.21.1A007FY25Technical Data Package (TDP), Level 34
0034/2009C.21.2A008FY25Data License Agreement (DLA)4
0034/2009C.10.8A009FY25Physical Configuration Audit (PCA) Plan and Report4
0034/2009C.22A010FY25Failure Modes, Effects, and Criticality Analysis (FMECA)4
0034/2009IPSSOWA011FY25Fault Tree Analysis (FTA)4
0034/2009IPSSOWA012FY25Maintenance Task Analysis (MTA)4
0034/2009IPSSOWA013FY25Level of Repair Analysis (LORA)4
0034/2009IPSSOWA014FY25Maintenance Allocation Chart (MAC)4
0034/2009IPSSOWA015FY25Provisioning Parts List (PPL)4
0034/2009IPSSOWA016FY25Engineering Data for Provisioning (EDFP)4
0034/2009IPSSOWA017FY25Technical Manual (TM) Validation Plan and Report (TMVPR)4
0034/2009IPSSOWA018FY25TM Operation and Maintenance, including Repair Parts and Special Tools List (-12&P TM)4
0034/2009IPSSOWA019FY25Interactive Multi-Media Instruction (IMI)4
0034/2009IPSSOWA020FY25Conduct of Training (CoT, OPNET)4
0034/2009IPSSOWA021FY25Program of Instruction (PoI, OPNET)4
0034/2009IPSSOWA022FY25Instructional Performance Requirements Document (IPRD, OPNET)4
0034/2009IPSSOWA023FY25Lesson Plan/Student Handouts/Visual Aids (LP-SG-VA, OPNET)4
0034/2009IPSSOWA024FY25Lesson Plan/Student Handouts/Visual Aids (LP-SG-VA, FLMNET)4
0034/2009IPSSOWA025FY25Logistics Management Information (LMI), Preservation & Packaging4
0034/2009IPSSOWA026FY25Program of Instruction (PoI, FLMNET)4
0034/2009IPSSOWA027FY25Instructional Performance Requirements Document (IPRD, FLMNET)4
0034/2009IPSSOWA028FY25Conduct of Training (CoT, FLMNET)4
0034/2009IPSSOWA029FY25Parts Screening Data (PSD)4
0034/2009IPSSOWA030FY25Proposed Spare Parts List (PSPL)4
0034/2009IPSSOWA031FY25Modification Work Order (MWO)4
0034/2009IPSSOWA032FY25MWO Plan & Report (MWOP)4
0034/2009IPSSOWA033Y1-5Monthly Status Report/Integrated Master Schedule (MSR)60
0034/2009IPSSOWA034FY25Production Verification Test (PVT) Plan4
0034/2009IPSSOWA035FY25First Article Test (FAT) Plan4
0034/2009IPSSOWA036FY25Care of Supplies in Storage Plan (COSIS)4
0034/2009IPSSOWA037FY25Contractor Quality Assurance Plan (CQAP)4
0034/2009IPSSOWA038FY25Production Acceptance Test and Inspection Plan (PATIP)1NSP
0034/2009IPSSOWA039FY25Configuration Control Documents (CCD)1NSP
0034/2009IPSSOWA040FY25System Support Package Component List (SSPCL)4
0034/2009IPSSOWA041FY25TM Quality Assurance Plan (TMQAP)1
0034/2009IPSSOWA042FY25Arsenal Utilization Report (AUR)4
0034/2009IPSSOWA043FY25Special Packaging Instruction (SPI)4

Cost CLINs

Cost CLINsThe Government has provided values for Shipping and Travel as these are COST CLINs
OPTION
ContractYearDescription$ContractYearDescription$
CLINSECTIONCDRLCLINSECTIONCDRL
ShippingShipping
0025C.14n/apFY25Shipping$50,0002000C.14n/apFY30Shipping$50,000
0025C.14n/apFY26Shipping$50,0002000C.14n/apFY31Shipping$50,000
0025C.14n/apFY27Shipping$100,0002000C.14n/apFY32Shipping$100,000
0025C.14n/apFY28Shipping$100,0002000C.14n/apFY33Shipping$100,000
0025C.14n/apFY29Shipping$100,0002000C.14n/apFY34Shipping$100,000
TravelTravel
0026C.13n/apFY25Contractor Travel$50,0002001C.13n/apFY30Contractor Travel$50,000
0026C.13n/apFY26Contractor Travel$75,0002001C.13n/apFY31Contractor Travel$75,000
0026C.13n/apFY27Contractor Travel$75,0002001C.13n/apFY32Contractor Travel$75,000
0026C.13n/apFY28Contractor Travel$75,0002001C.13n/apFY33Contractor Travel$75,000
0026C.13n/apFY29Contractor Travel$75,0002001C.13n/apFY34Contractor Travel$75,000

Spare Parts Attachment 0005

Fill in YELLOW cells with price for one unit
CLIN 0027FY25FY26FY27FY28FY29
Item NameIECUPart NumberNSNUOMUnit priceUnit priceUnit priceUnit priceUnit price
Cable Assembly, IECU 5000, Power - Straight9KA1-48493D-16150-01-702-6823Each
Cable Assembly, IECU 5000, Power - Angle9KA1-48493D-26150-01-702-6823
Cable Assembly, IECU 5100, Power - Straight18K-1A1-48494D-16150-01-702-7081
Cable Assembly, IECU 5100, Power - Angle18K-1A1-48494D-26150-01-702-7081
Cable Assembly, IECU 5200, Power - Straight18K-3A1-48495D-16150-01-702-7050
Cable Assembly, IECU 5200, Power - Angle18K-3A1-48495D-26150-01-702-7050
Cable Assembly, IECU 5300 or 5500, Power - Straight36KA1-48496D-16150-01-702-7097
Cable Assembly, IECU 5300 or 5500, Power - Angle36KA1-48496D-26150-01-702-7097
CLIN 2002FY30FY31FY32FY33FY34
Item NameIECUPart NumberNSNUOMUnit priceUnit priceUnit priceUnit priceUnit price
Cable Assembly, IECU 5000, Power - Straight9KA1-48493D-16150-01-702-6823Each
Cable Assembly, IECU 5000, Power - Angle9KA1-48493D-26150-01-702-6823
Cable Assembly, IECU 5100, Power - Straight18K-1A1-48494D-16150-01-702-7081
Cable Assembly, IECU 5100, Power - Angle18K-1A1-48494D-26150-01-702-7081
Cable Assembly, IECU 5200, Power - Straight18K-3A1-48495D-16150-01-702-7050
Cable Assembly, IECU 5200, Power - Angle18K-3A1-48495D-26150-01-702-7050
Cable Assembly, IECU 5300 or 5500, Power - Straight36KA1-48496D-16150-01-702-7097
Cable Assembly, IECU 5300 or 5500, Power - Angle36KA1-48496D-26150-01-702-7097

Labor Rates

Direct Labor RatesPropose labor categories selected from the following source:
2018 SOC Manual (Entire Manual) (bls.gov)
https://www.bls.gov/soc/
Provide fully burdened hourly labor rates (including profit) to meet scope of work for CLIN 0028/2003 and CLIN 0029/2004.
Provide the basis for the proposed labor rates included, identifying any escalation rates and the profit rate (see Basis for Labor Rates tab).
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 10
Labor CategoryLabor HoursLabor RateLabor RateLabor RateLabor RateLabor RateLabor RateLabor RateLabor RateLabor RateLabor RateLabor Rate

https://www.bls.gov/soc/2018/soc_2018_manual.pdfhttps://usg01.safelinks.protection.office365.us/?url=https%3A%2F%2Fwww.bls.gov%2Fsoc%2F&data=05%7C02%7Cjoann.mattos.civ%40army.mil%7Cccd4d0e3ace4472d2f2308dcbd57db75%7Cfae6d70f954b481192b60530d6f84c43%7C0%7C0%7C638593432260463785%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=ZWrzNvEpIycKsYpUm043SxenypDaJ13rrlJhHlwH4bc%3D&reserved=0 Basis for Labor Rates

Basis of Labor Rates CLIN 0028/2003 and CLIN 0029/2004
Provide basis for direct labor rate:
.
Provide your fringe rate and basis:
Provide your labor overhead rate and basis:
Provide your G&A rate and basis:
Identify the profit rate and basis.
Identify any escalation applied and the basis for the escalation.

Unit Production

Unit ProductionFill in YELLOW cells with per unit price indexed to quantity
DO NOT CHANGE any formulas, formatting, or move any cells
ContractYearDescriptionPer Unit Based on Quantity
CLINSECTIONCDRL12-1011-2526-5051-100101-200201-500+
0030 / 2005C.11.1n/apFY25IECU - 9 kBTU/hr, 115 VAC, single-phase, Y1
0031 / 2006C.11.1n/apFY25IECU - 18 kBTU/hr, 230 VAC, single-phase, Y1
0032 / 2007C.11.1n/apFY25IECU - 18 kBTU/hr, 208 VAC, 3-phase, Y1
0033 / 2008C.11.1n/apFY25IECU - 36 kBTU/hr, 208 VAC, 3-phase, Y1
0030 / 2005C.11.1n/apFY26IECU - 9 kBTU/hr, 115 VAC, single-phase, Y2
0031 / 2006C.11.1n/apFY26IECU - 18 kBTU/hr, 230 VAC, single-phase, Y2
0032 / 2007C.11.1n/apFY26IECU - 18 kBTU/hr, 208 VAC, 3-phase, Y2
0033 / 2008C.11.1n/apFY26IECU - 36 kBTU/hr, 208 VAC, 3-phase, Y2