Huddleston/21 road paving

Award Notice Posted

Solicitation number
AG-04KK-S-08-0014
Agency
Awarded
to Harney Rock & Paving CO.
Set-aside
HUBZone

Opportunity facts

Contract number
AG04KKC080010 Federal contract award
PSC
Not on record
Place of performance
1. From John Day, OR, travel west on U.S. Highway 26 for 18 miles, then turn south onto Forest Service Road 21, which is the beginning of the project. The patching sites are located at various intervals between milepost 2.0 and milepost 12.8 on the 21 road. 2. The project is located on the Prairie City Ranger District of the Malheur National Forest, about 20 miles south east of Prairie City, Oregon. It can be accessed by turning south from US Highway 26 in Prairie City onto Grant County Road 62, an continuing southeast on Road 62 for approximately 20 miles. The project site is located immediately adjacent to Road 62, with both of the parking lot approach roads intersecting Road 62. John Day, Oregon 97845, United States

Notice details come from SAM.gov. Updated .

Notice text

On each project the Contractor shall be responsible for providing all labor, tools, material and equipment necessary to perform all work in strict accordance with the specifications and drawings. Payment for the contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown.



1. This project consists of applying tack coat and Hot Mix Asphalt Concrete skin patches to portions and shoulders of Forest Service Road 21, and skin patches to full width of existing road at specified locations. Lengths, widths, and depths of patching varies at each location. Areas to be patched and paved will be staked on the ground by the Contracting Officer.



2. This project consists of hot mix asphalt (HMA) concrete paving of parking lot and two approach roads. The existing approach roads are HMA paved, and the parking lot is compacted crushed aggregate. The HMA paving for the approach roads will taper in depth from 0 where they join County Road 62 to a 3 depth at a point 50 to the west at the edge of the parking lot. The approach roads total 5000 square feet in area (approx. 0.12 acre). The HMA paving for the parking lot area will consist of a 3 inch thick compacted layer of asphalt concrete placed on the existing aggregate surface, which total 35,400 square feet (approx. 0.81 acre). Areas to be paved will be staked on the ground by the Contracting Officer.

Files

File Type Posted
amend_2_huddleston21.doc DOC document
preproposal_notes.doc DOC document
amend_1_huddleston21.doc DOC document
g. Huddleston Snow Park Paving Plan View Dwg.pdf PDF
m. Sf25.pdf PDF
j. Measure 1 Tank Truck.doc DOC document
n. Sf25a.pdf PDF
i. r6_fs_6300_52.doc DOC document
f. Huddleston Snow Park Paving Vicinity Map.pdf PDF
a. Contract Specifications.doc DOC document
l. sf24.pdf PDF
b. Malheur Road Rules.doc DOC document
AG-04KK-S-08-0014 BIDDERS PACKET.zip ZIP file
d. 21_road_Patching Detail Typical.pdf PDF
k. Measure 2 Communications.doc DOC document
c. 21 road skin patching vicinity map.pdf PDF
h. WD_huddleston21.doc DOC document
o. sf25b.pdf PDF
e. 21 Road work summary.doc DOC document
AG-04KK-S-08-0014.zip ZIP file
Show all 20

Notice history

Notice Type Posted
Huddleston/21 road paving Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors