e. 21 Road work summary.doc
DOC document 166 KB Posted
- Attached to
- HUDDLESTON/21 ROAD PAVING
- Solicitation number
- AG-04KK-S-08-0014
About this file
21 Road Work Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amend_2_huddleston21.doc | DOC document | |
| preproposal_notes.doc | DOC document | |
| amend_1_huddleston21.doc | DOC document | |
| k. Measure 2 Communications.doc | DOC document | |
| c. 21 road skin patching vicinity map.pdf | ||
| d. 21_road_Patching Detail Typical.pdf | ||
| n. Sf25a.pdf | ||
| g. Huddleston Snow Park Paving Plan View Dwg.pdf | ||
| m. Sf25.pdf | ||
| o. sf25b.pdf | ||
| h. WD_huddleston21.doc | DOC document | |
| j. Measure 1 Tank Truck.doc | DOC document | |
| AG-04KK-S-08-0014.zip | ZIP file | |
| a. Contract Specifications.doc | DOC document | |
| f. Huddleston Snow Park Paving Vicinity Map.pdf | ||
| l. sf24.pdf | ||
| i. r6_fs_6300_52.doc | DOC document | |
| AG-04KK-S-08-0014 BIDDERS PACKET.zip | ZIP file | |
| b. Malheur Road Rules.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Notes for the 21 Road
Mile Post shown are full depth. Tapers will be 10 feet on each end for 2” depths and 25 feet for 4” depths.
Areas will be staked on the ground by the Contracting Officer.
Road 21 Work Summary
Mile Post Description
Begin project road 21.
Junction road Hwy. 395.
2.01 Place skin patch 10’ X 910’ X 3” depth Lt.
2.25 Place skin patch 9’ X 75’ X 2” depth Lt.
2.50 Place skin patch 6’ X 50’ X 2” depth Lt.
4.85 Place skin patch 10’ X 225’ X 2” depth Rt.
6.05 Place skin patch 3’ X 30’ X 4” depth Rt.
7.15 Place skin patch 10’ X 50’ X 3” depth Rt.
7.20 Place skin patch 6’ X 150’ X 3” depth Lt.
7.45 Place skin patch 22’ X 325’ X 3” depth.
7.61 Place skin patch 4’ X 60’ X 3” depth.
8.67 Place skin patch 10’ X 50’ X 2” depth Lt.
8.88 Place skin patch 26’ X 175’ X 2” depth.
11.10 Place skin patch 22’ X 100’ X 2” depth.
13.4 End of project.
File details come from the government source that posted it. Updated .