amend_2_huddleston21.doc

DOC document 63 KB Posted

Attached to
HUDDLESTON/21 ROAD PAVING
Solicitation number
AG-04KK-S-08-0014
Issued by

About this file

Amendment No. 002 Changes in some clauses and Due Date is extended to 07-10-2008 4 30pm pst.

View the file

Other files

File Type Posted
preproposal_notes.doc DOC document
amend_1_huddleston21.doc DOC document
k. Measure 2 Communications.doc DOC document
c. 21 road skin patching vicinity map.pdf PDF
d. 21_road_Patching Detail Typical.pdf PDF
n. Sf25a.pdf PDF
g. Huddleston Snow Park Paving Plan View Dwg.pdf PDF
m. Sf25.pdf PDF
o. sf25b.pdf PDF
h. WD_huddleston21.doc DOC document
e. 21 Road work summary.doc DOC document
j. Measure 1 Tank Truck.doc DOC document
AG-04KK-S-08-0014.zip ZIP file
a. Contract Specifications.doc DOC document
f. Huddleston Snow Park Paving Vicinity Map.pdf PDF
l. sf24.pdf PDF
i. r6_fs_6300_52.doc DOC document
AG-04KK-S-08-0014 BIDDERS PACKET.zip ZIP file
b. Malheur Road Rules.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-04KK-S-08-0014

Amendment #2

1. CONTRACT ID CODE
PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
2
06/30/2008
164879
6. ISSUED BY
CODE
04KK
7. ADMINISTERED BY (If other than Item 6)
CODE
04KK

Malheur National Forest 431 Patterson Bridge Road

P.O. Box 909

John Day, OR 97845

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-04KK-S-08-0014

9B. DATED (SEE ITEM 11)

06/02/2008

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
X
is extended,

is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this amendment is to delete in its entirety clause 52.236-1 Perfomance of Work by the Contractor (APR 1984)– located on page 16 of the solicitation.

Add Clause 52.219-14 Limitations on Subcontracting – See attached

The due date for offerers has been extended to July 10, 2008, 4:30pm pst. Please submit offerers to the: Malheur National Forest 431 Patterson Bridge Road

P.O. Box 909

John Day, OR 97845

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Gary Dillavou – Contracting Officer

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
/s/ Gary Dillavou
06/06/08

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

52.219-14 Limitations on Subcontracting.

As prescribed in 19.508(e) or 19.811-3(e), insert the following clause:

Limitations on Subcontracting (Dec 1996)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

(End of clause)

File details come from the government source that posted it. Updated .