k. Measure 2 Communications.doc

DOC document 23 KB Posted

Attached to
HUDDLESTON/21 ROAD PAVING
Solicitation number
AG-04KK-S-08-0014
Issued by

About this file

Fire Protection and Suppression--Measure 2

View the file

Other files

File Type Posted
amend_2_huddleston21.doc DOC document
preproposal_notes.doc DOC document
amend_1_huddleston21.doc DOC document
c. 21 road skin patching vicinity map.pdf PDF
d. 21_road_Patching Detail Typical.pdf PDF
n. Sf25a.pdf PDF
g. Huddleston Snow Park Paving Plan View Dwg.pdf PDF
m. Sf25.pdf PDF
o. sf25b.pdf PDF
h. WD_huddleston21.doc DOC document
e. 21 Road work summary.doc DOC document
j. Measure 1 Tank Truck.doc DOC document
AG-04KK-S-08-0014.zip ZIP file
a. Contract Specifications.doc DOC document
f. Huddleston Snow Park Paving Vicinity Map.pdf PDF
l. sf24.pdf PDF
i. r6_fs_6300_52.doc DOC document
AG-04KK-S-08-0014 BIDDERS PACKET.zip ZIP file
b. Malheur Road Rules.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Fire Precautionary Measure 2 - Communications The Contractor shall provide adequate two-way communication facilities to report a fire to Forest Service within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB's are not considered adequate two-way communications).

Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required.

File details come from the government source that posted it. Updated .