H261--triennial electrical testing
Closed Solicitation Posted
- Solicitation number
- 36C25926Q0348
- Agency
-
Veterans Integrated Service Network 19
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 541350 Building Inspection Services
- Place of performance
- Department of Veterans Affairs Eastern Colorado Health Care System Aurora CO 80045, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Integrated Service Network 19 seeks triennial switchgear and battery testing certification services for the Eastern Colorado Healthcare System, with quotes due May 29, 2026 at 10:00 AM MT. This procurement is 100% set-aside for service-disabled veteran-owned small businesses (SDVOSBs), and SDVOSB certification must be verified in the SBA Small Business Certification database at quote submission and award.
Place of performance is 1700 N. Wheeling Street, Aurora, Colorado 80045, at the Rocky Mountain Regional VA Medical Center. Work must be completed within one year of contract award during normal business hours (7:00 AM to 3:30 PM, Monday–Friday), with after-hours availability (6:00 PM to 6:00 AM) for live equipment shutdowns. The contractor must be located within a 100-mile radius of Aurora.
The scope encompasses triennial testing, maintenance, preventive maintenance, certification, and repair of 14 line items covering 553 units of electrical equipment: generator paralleling switchgear and automatic throw-over systems, 67 automatic and manual transfer switches, 32 switchgear and switchboard assemblies, 90 medium voltage vacuum circuit breakers, 31 dry-type transformers, 3 oil-filled transformers, 262 low voltage circuit breakers at 480 VAC, 69 protective relays, 2 GE Multilin 750 relay devices, 107 metering and instrumentation units, 320 lead-acid and nickel-cadmium UPS battery systems, 40 electrical vault inspections, and one protective relay calibration study. Testing must comply with NFPA-110 (2025), NFPA-70 (2023), NFPA 70B (2026), NFPA 70E (2024), NFPA 99 (2024), 29 CFR 1910, and VHA Directive 1028. Contractor must hold NETA certification and provide technicians with OSHA 10-hour (technicians) and OSHA 30-hour (on-site competent persons) training and minimum 10 years of relevant experience in electrical power distribution systems.
NAICS code is 541350, Building Inspection Services; PSC is H261. Evaluation prioritizes technical capability over price, followed by past performance. Offerors must submit four volumes: technical capability, pricing, up to three past performance examples from the preceding five years, and a completed VAAR 852.219-75 certification regarding subcontracting limitations. Federal clause 52.222-90, Addressing DEI Discrimination by Federal Contractors (April 2026), applies; all quoters must confirm receipt of this amendment in their proposals. A non-mandatory site visit occurred April 23, 2026. Quotes must be submitted via email only to Noaa.Lanotte@va.gov, with a 4 MB file limit. The government reserves the right to award solely on initial quotes received and to make no award.
Notice text
7 versions
Update #7 · Latest ·
The purpose of this amendment is to:
Provide attachment VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate ;
All other terms and conditions remain unchanged.
Update #6 ·
The purpose of this amendment is to:
Provide responses to additional questions that were asked. Please see attachment Additional Questions and Answers Electrical Testing
Provide revised line items and statement of work based on responses to the additional questions. Please see attachments Revised Line Items 05-20-2026 and Revised Statement of Work Electrical Testing 05-20-2026 . All quoters must use the revised line items when submitting quotes.
Extend the due date for quotes until 10:00am MT on 05/29/2026. All quotes must be submitted to Noaa.Lanotte@va.gov.
All other terms and conditions remain unchanged.
Update #5 ·
The purpose of this amendment is to:
Provide attachments that were omitted from RFQ Amendment 0002. Please see attachments;
Extend the due date for quotes until 2:00pm MT on 05/21. All quotes must be submitted to Noaa.Lanotte@va.gov;
All other terms and conditions remain unchanged.
Update #4 ·
The purpose of this Amendment 0003 is to:
1. Updated the POC (Point of Contact) for all submissions. This POC is Noaa Lanotte |
noaa.lanotte@va.gov.
Update #3 ·
The purpose of this Amendment is to:
Add clause 52.222-90, Addressing DEI Discrimination by Federal Contractors (APR 2026). Please confirm receipt of this amendment in your proposal submission.
Add CLIN 0013 and 0014 for Electrical Vault Inspections and Protective Relay Calibration Study.
Extend vendor response due date from 05/08 @12PM to 05/19 @4PM. This extension is to give vendors time to review the below end-user responses to questions.
Provide responses to the questions that were asked.
All vendors are required to provide confirmation of this Amendment 0002 with their proposal.
Below are the questions that were asked followed by the end-user responses. If further clarification on any of the responses is needed, please contact me at Thaddeus.gray@va.gov.
52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026)
(a) Definitions. As used in this clause
Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.
Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.
(b) In connection with the performance of work under this contract, the Contractor agrees as follows:
(1) The Contractor will not engage in any racially discriminatory DEI activities;
(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;
(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;
(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and
(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.
(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).
(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
End of Clause
Line
Description
Quantity
Unit of
Unit Price ($)
Total Price
Items
Measure
($)
0001
Generator Paralleling Switchgear and Control; PSG & ATO
Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
1
EA
0002
Automatic & Manual Transfer Switches (ATS/MTS) Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
67
EA
0003
Switchgear and Switchboard Assemblies
Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
32
EA
0004
Medium Voltage Vacuum Circuit Breakers Triennial testing, full maintenance, preventive
maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
90
EA
0005
Substation Transformers (Dry Type)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
31
EA
0006
Transformers (Oil Filled Type) Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
3
EA
0007
Low Voltage Circuit Breakers (480 VAC)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
231
EA
0008
Protective Relay Calibration Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
69
EA
0009
GE Multilin 750 Triennial testing, full
maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
2
EA
0010
Metering and Instrumentation Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
107
EA
0011
Engineering Appraisal On completion of the inspection, testing, maintenance and/ or
calibration of the equipment, the customer shall be submitted one (1) copy of the final report.
PoP is 07/01/2026 06/30/2027
1
EA
0012
Batteries: lead-acid and Ni-Cd powered UPS systems Triennial testing, full maintenance, preventive maintenance, certification and repair services
PoP is 07/01/2026 06/30/2027
320
EA
0013
Electrical Vault Inspections
PoP is 07/01/2026 06/30/2027
1
EA
0014
Protective Relay Calibration Study.
PoP is 07/01/2026 06/30/2027
1
EA
Grand Total ($)
RFQ 36C25926Q0348 Vendor Question Responses
Q1: Can you confirm whether all testing and services are to be performed in accordance with ANSI/NETA MTS and VHA Directive 1028?
A1: Yes they are.
Q2: Can you clarify whether utility coordination (including any required utility personnel or outage scheduling) is to be included in our scope, or if it will be handled by the facility/owner.
A2: Yes, the utility coordination is to be included in contractors scope.
Q3: Can you confirm whether infrared (IR) thermographic scanning is required as part of this solicitation.
A3: All the electrical vaults and the utility connections are required to be IR scanned.
Q4: Can you clarify whether the required LOAD TEST of the transfer switch (ATS/MTS) is intended to be: A real load transfer test using facility load, or a load bank test requiring supplemental equipment.
A4: A real load transfer test using facility load.
Q5: Can you confirm whether primary current injection testing is required, or secondary injection testing is acceptable for this project scope.
A5: Primary current injection testing is required.
Q6: Can you provide the name, year, awarded value, and awarded contractor for the most recent bid performed at this site? Please confirm whether the scope of work for that contract is identical to the scope for the current 2026 bid.
A5: The end-user is unsure of the previous contract information.
Q7: Can you provide the most current Single-Line Diagram (SLD) for this site?
A6: See attached
Q8: Could you provide the latest electrical test report?
A8: No, report is not available.
Q9: In Statement of Work 2.0.3 - Switchgear and Switchboard Assemblies; doesn t specify if any electrical testing is required for this item, or only cleaning and inspection of the cubicles?
A9: Cleaning and inspection is expected for 2.0.3.
Q10: In Statement of Work 2.0.7 - Low Voltage Circuit Breakers; it is unclear what type of test is required for the circuit breakers (primary or secondary injection). The section requests in the first topic "verify trip settings by secondary injection," and in the third to last topic it states that "The circuit breakers equipped with series or solid-state overcurrent trip devices shall be high current tested." Please clarify.
A10: Primary current injection testing is required.
Q11: Can all circuit breakers be tested by secondary injection?
A11: No, all 480v breaker tested by primary injection.
Q12: In item 2.0.8 - Protective Relay Calibration (Solid State/Digital as applicable); please provide the relay models.
A12: See attached.
Q13: In line item 0010 - Metering and Instrumentation, this item covers (3) types of devices: Meters, CTs and PTs. A total of (107) devices are listed, but the quantity of each type is not specified. Please specify the quantity of Meters, CTs and PTs.
A13:
Meters 31 in substations, 67 in ATS
PT 10 in PSG/ATO, 31 Substations
CTs 67 sets from ATS, 31 sets from Substations
Q14: In the Statement of Work, section 3.5.1 - Inspection of electrical vaults requires the inspection of electrical vaults. Please specify the quantity.
A14: 40 different vaults.
Q15: In the Statement of Work, section 3.5.2 - Protective Relay Calibration Study, please clarify further what needs to be done, or provide the latest Protective Relay Calibration Study to be used as a reference.
A15: Pervaded Protective Relay Calibration Study.
Q16: In the Statement of Work, it states that a Journeyman lineman is required. This isn't typically required along with NETA Certification. Electricians are journeymen whereas most in our field are Test Technicians or Engineers. Are you requiring a Journeyman or Technician/Engineer?
A16: We want personnel that are certified and trained doing each aspect of the contract
Q17: In the Statement of Work, it states that Contractor must be located within a 100-mile radius of Aurora Rocky Mountain Regional VA Medical Center. Is this a pass or fail requirement?
A17: Radius requirement removed. SOW will be updated.
Q18: In the Statement of Work, it states that Contractors shall be a member of NETA, have technical training, and demonstrate track records of working experience in maintenance, inspection, testing, and/or calibration of Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of ten (10) continuous years. The requirement is most commonly 5 years. Is this truly 10 years and if so, it will greatly reduce the qualified companies to participate?
A18: 5 years is fine if every NETA requirement is met CO to verify. SOW will be updated.
Q19: Vendor request any available electrical drawings, wiring diagrams, single-line diagrams, and/or as-built documentation associated with the project scope.
A19: See attached.
Q20: Can the VA confirm the anticipated period of performance (POP)?
A20: The Current PoP is 07/01/2026 06/30/2027
Q21: Will the contractor be escorted by VA personnel at all times?
A21: Yes, any time they are not in a public area of the campus unless they have a badge.
Q22: Can the VA provide one-line diagrams for all the equipment within the scope?
A22: See attached.
Q23: Can the VA provide a list of the relay types and quantities that are required to be tested?
A23:
MV relays
GE G60 Relays 5 in ATO
GE Multilin 350 relay 81 throughout the campus
GE Multilin 750 relay 2 in ATO
GE Multilin MIB relay 4 2 in PSG & 2 in ATO
Eaton Digitrip 3000 relays 4 in Building A (CBS)
Q24: Will all testing be required to occur at night?
A24: No only if the testing has an impact on normal operations, (normal substations)
Q25: Can the contractor work 8-hour, 10-hour and/or 12-hour shifts?
A25: Normal working hours for us are 0600 to 1530
If the government is working after hours on a Monday, the contractor can do a 12-hour shift. If the government is working after hours all week then the contractor can do a 10-hours shifts.
Q26: Scope item 2.01, says contractor is to provide 16 hours of labor for ABB Service Tech support. Please confirm that the VA will be responsible for coordinating and paying for the ABB labor?
A26: No contractor is responsible for coordinating and paying for this
Q27: Can the VA provide the previous test reports for reference?
A27: No
Q28: What is their time-frame for completing all testing?
A28: 1 year.
Q29: What is their schedule for each buildings equipment?
A29: Upon notice to proceed the vendor will submit a proposed schedule to be approved by VA personnel
Q30: Are they wanting everything done during weekdays and nights or will there be weekend/holiday work?
A30: Weekdays/nights, no Holidays, only exception is for the testing on the ATO/Utility switchgear will need to be done on a weekend
Q31: Do they have all of the required lifting equipment for all breakers, etc?
A31: Yes.
Q32: Will the VA be supplying temporary power to buildings if house power is not available for testing?
A32: If normal power is not available, the VA will be supplying power to the emergency substation and the emergency source of the ATS. ATS s are powering life safety, critical and equipment circuits.
Q33: One sheet says there are 231 and another says 262 LVCB s that need to be tested. Can we assume the combined synopsis/solicitation notice is more accurate?
A33: 262 LVCB.
Q34: They want secondary injection performed. What are the trip units that we will be
testing?
A34: Primary current injection testing is required
Q35: Specs say, The circuit breakers equipped with series or solid-state overcurrent trip devices shall be high current tested to verify calibration of the trip devices how many of these are there and what is their amperage rating, so we know how big of a test set to get?
A35:
16 Eaton MDN-608, they range from 3200A to 200A
246 GE WPS s range from 4000A to 100A
Q36: Specs say, The circuit breakers equipped with GE solid-state overcurrent trip devices shall be tested with their respective factory test sets how many of these are there?
A36: 262 LVCB
Q37: Are all the dry type substation transformers rate 1500kVA? Could you provide nameplate ratings for the oil filled type transformers?
A37:
Dry up to 2500kVA
1 - 150KVA Oil
2 - 300KVA Oil
Q38: Where should we include prices for the electrical vault inspections or protective relay calibration study?
A38: A line item will be added for the electrical vault inspections or protective relay calibration study.
Q39: How long can we take for the outage of a given piece of equipment?
A39: It all depends on the type of equipment and the impact of the outage
Q40: Will we be able to run two shifts daily?
A40: NO
Q41: How long before the beginning of a shift can we access the equipment rooms?
A41: Building L as early as you want if you are badged. Otherwise, you can t until you are escorted by VA staff.
Q42: Will we be able to secure any equipment on site?
A42: Yes.
Q43: What is the timeframe for this project? Is there a hard stop date?
A43: The Period of Performance is 07/01/2026 06/30/2027.
Q44: In the case of an emergency, what is the typical restoration time?
A44: The restoration time is Dependent on the Impacted area the equipment it serves
Q45: What is the contingency plan if a piece of equipment is unable to be brought back online?
A45: We have some spare breakers we can replace the breaker with, ATS s have a built-in bypass switch.
Q46: Are there any limitations or restrictions associated with operating the facility on emergency power during these conditions, including:
Maximum allowable run duration
Fuel availability or refueling constraints
Environmental or emissions restrictions
Operational limitations related to patient care or critical systems
A46: No limitations or restrictions on any.
Q47: Are there any specific systems or areas that cannot be supported on generator power during testing outages?
A47: Yes the Fisher House (building R or #16).
Q48: Will the VA be able to provide temporary testing power (minimum 100A, 480V) within approximately 100 feet of switchboards/switchgear where primary injection testing may be required?
A48: The Government will supply temp power for testing in three locations thought out the campus. We do have flat bed carts and vehicles we can use to transport the breakers/switches to the testing equipment location.
Q49: Are there designated tie-in points or preferred locations for connecting test equipment?
A49: The Government is planning on having 3 locations where temp power will be available for testing equipment.
Q50: If adequate facility power is not available, will the contractor be required to provide a portable generator to support primary injection testing? If so, are there any site restrictions related to:
Generator placement
Emissions or runtime limitations
Fuel storage and handling within the facility
A50: No the contractor will not be required to provide portable generators.
Update #2 ·
The purpose of this Amendment 0001 is to:
Extend the Response Date and Time from 04/28/2026 @12pm to 05/08/2026 @12pm. The extension is to allow the questions that the vendors asked to be answered.
A second Amendment will be posted once the questions are answered along with any additional attachments that may have been requested or provided by the Government.
Update #1 ·
Request for Quote (RFQ) #: 36C25926Q0348
Triennial Switchgear and Battery Testing Certification for Eastern Colorado Healthcare System (ECHCS).
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. The Government reserves the right to make no award from this solicitation.
A Site Visit will be held for this requirement. The Site Visit is highly recommended, but not mandatory.
When: 9:00 AM MT, Thursday, April 23rd, 2026
Where: 1700 N. Wheeling St., Aurora, CO 80045
Parking Visitor North (PVN)
Once parked, please proceed to Level 1 and go through the main doors. Meeting location is the coffee shop, Patriot Brew on the right-hand side.
Point of Contact: Thaddeus Gray| thaddeus.gray@va.gov | 240-278-7051
Please give notice if you are interested so that we are aware of all parties attending.
* The deadline for all questions is 4:00pm MT, Apr 24th, 2026.
All questions must be submitted in writing no later than the question cut-off date marked above. All questions will be answered officially through an amendment to the solicitation.
** Quotes are to be provided to thaddeus.gray@va.gov no later than 12:00pm MT, Apr 28th, 2026.
Quotes shall not be hand carried. Faxed quotes shall not be accepted. Emailed quotes are the only method of submitted quotes (4MB email limit). The Government reserves the right to make the award solely on initial Quotes received. Offerors bear the burden of ensuring that all portions of the offer (and any authorized amendments) reach the designated office before the deadline specified in the solicitation. This RFQ shall be completed in its entirety, and signed and dated, failure shall not be considered for award.
This is a Request for Quote (RFQ), and the solicitation number is 36C25926Q0348. The government anticipates awarding a firm-fixed price contract resulting from this solicitation.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01 effective March 13, 2026.
The North American Industrial Classification System (NAICS) code for this procurement is 541350 Building Inspection Services with a business size standard of $11.5 Million. This solicitation is 100% set-aside for service-disabled veteran owned small businesses (SDVOSB).
List of Line Items;
Line Items
Description
Quantity
Unit of Measure
Unit Price ($)
Total Price
($)
0001
Generator Paralleling Switchgear and Control; PSG & ATO
Triennial testing, full maintenance, preventive maintenance, certification and repair services
1
EA
0002
Automatic & Manual Transfer Switches (ATS/MTS)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
67
EA
0003
Switchgear and Switchboard Assemblies
Triennial testing, full maintenance, preventive maintenance, certification and repair services
32
EA
0004
Medium Voltage Vacuum Circuit Breakers
Triennial testing, full maintenance, preventive maintenance, certification and repair services
90
EA
0005
Substation Transformers (Dry Type)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
31
EA
0006
Transformers (Oil Filled Type)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
3
EA
0007
Low Voltage Circuit Breakers (480 VAC)
Triennial testing, full maintenance, preventive maintenance, certification and repair services
231
EA
0008
Protective Relay Calibration
Triennial testing, full maintenance, preventive maintenance, certification and repair services
69
EA
0009
GE Multilin 750
Triennial testing, full maintenance, preventive maintenance, certification and repair services
2
EA
0010
Metering and Instrumentation
Triennial testing, full maintenance, preventive maintenance, certification and repair services
107
EA
0011
Engineering Appraisal
On completion of the inspection, testing, maintenance and/ or calibration of the equipment, the customer shall be submitted one (1) copy of the final report.
1
EA
0012
Batteries: lead-acid and Ni-Cd powered UPS systems
Triennial testing, full maintenance, preventive maintenance, certification and repair services
320
EA
Grand Total ($)
Description of Requirements for the items/Services to be acquired: The requirement is for Triennial Switchgear and Battery Testing Certification, please reference attached Statement of Work (SOW).
Delivery and acceptance are to be F.O.B Destination (RFO 52.247-34) at the VA Eastern Colorado Health Care System (ECHCS), located at:
Eastern Colorado VA Healthcare System
Rocky Mountain Regional VAMC
1700 N. Wheeling St. Aurora CO 80045
52.212-1, Instructions to Offerors-Commercial Items applies to this acquisition
Any award made as a result of this solicitation will be made on an All or Nothing Basis.
State if quoted items are available and priced through offerors existing Government-wide Acquisition Contract (GWAC), GSA Multiple Award Schedule (MAS) contract, or VA-wide Acquisition Contract.
If the acquisition is set-aside for SDVOSBs/VOSBs, their socioeconomic status must be verified and visible in the SBA Small Business Certification (SBS): https://search.certifications.sba.gov/ at the time of quote submission AND award, or will be considered non-responsive, and will NOT be considered for award.
Offerors are warned against contacting any VA personnel other than the Contracting Officer and Contract Specialist prior to placement of any award made resulting from this RFQ. If such contact occurs and found to be prejudicial to competing contactors, the offeror making such contact may be excluded from award considerations.
All proprietary information shall be clearly and properly marked. If the Offeror submits annexes, documentation, attachments or the like, not specifically required by this solicitation, such will count against the Offeror s page limitations unless otherwise indicated in the specific volume instructions below.
All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the quote and provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each quote.
ADDENDUM to RFO 52.212-1 INSTRUCTIONS TO OFFERORS COMMERCIAL
Submission of quote shall include the following volumes: (I) Technical capability or quality offered to meet the Government requirement; (II) Price; (III) Past Performance; and (IV) Completion of VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.
Volume I - Technical capability or quality to meet the Government requirement.
The offeror shall submit its quote demonstrating how it meets the requirements of the Statement of Work (SOW) and solicitation. Offeror shall include bond coverage, insurance certification, and company s authorized personnel list, as needed.
Volume II Price
Price - The offeror shall complete the pricing schedule provided in Section (v) above: Price/Cost Schedule. The offeror shall price the base and all option year line items.
Volume III Past Performance
Offerors shall provide up to three (3) recent and relevant past efforts (as defined below) to demonstrate their ability to perform the proposed work. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted. If not providing CPARS evaluation past performance references must include contract numbers, amount of contract award, point of contact with email address, telephone numbers and other relevant information, and a description of product/work performed under the contract. To be relevant, the effort must be similar in nature of work, size, magnitude, complexity, and scope of this procurement. To be recent past performance is defined as not more than five years from the RFQ release date of this solicitation.
Volume IV VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.
The offeror shall complete the provision VAAR 852-219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.
Offeror must list any/all subcontractors (and their size standard IAW NAICS 541350) if they will be utilized for this requirement AND what they will be performing. How is your firm going to comply with Limitations on Subcontracting requirements? If no subcontractors will be used, please state No Subcontractors will be used for this requirement in the response.
(End of Addendum to 52.212-1)
52.212-2, Evaluation--Commercial Items applies to this acquisition.
ADDENDUM to RFO 52.212-2 EVALUATION COMMERCIAL ITEMS:
The Government will award a contract resulting from this solicitation to the offeror responsible whose offer conforming to the solicitation will be most advantageous to the Government considering price and other factors.
The following factors shall be used to evaluate quotations:
Factor I. Technical capability or quality offered to meet the Government requirement
Factor II. Price
Factor III. Past Performance
Evaluation Approach. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government will use comparative analysis. The following factors will be used to evaluate offers:
Factor I. Technical capability or quality offered to meet the Government requirement: The quotation will be evaluated to the extent to which it can meet and/or exceed the Government s requirements as outlined in the solicitation and based on the information requested in the instructions to quoters section of the solicitation. Technical capability factor is more important than the Price factor.
Factor II. Price: The Government will evaluate the price by adding the total of all line-item prices, including all options. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offers that do not meet or exceed the technical capability or quality of the service offered to the Government requirement, as stated in Factor 1, shall not be selected regardless of price.
Factor III. Past Performance: The Government will evaluate on how well the offeror identified performance relates to the requirement procured under the SOW for this procurement to determine relevancy. How well the offeror performed on identified contracts shall be used to assess performance confidence. The Past Performance factor is less important than the Price factor.
The Government may use other methods to evaluate past performance, including but not limited to review of
Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and
Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other
databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and as
appropriate, the Defense Contract Management Agency (DCMA) Acquisition Information Repository,
accessible through the Defense Technical Information Center website.
In the case of an offeror without a record of relevant past performance or for whom information on past
performance is not available, the offeror may not be evaluated favorably or unfavorably on past
performance.
If offeror does not provide all volumes as outlined in RFO 52.212-1 Instructions, the offer may be considered nonresponsive.
The Government will evaluate offers for award purposes by evaluating the offerors submissions volumes; Volume I - Technical Capability, Volume II - Price and Volume III - Past Performance. The Government will view the Technical Capability factor as more important than the Price factor. The Past Performance factor will be viewed as significantly less important than the Price factor.
(End of Addendum to 52.212-2)
52.212-4, Contract Terms and Conditions--Commercial Items applies to this acquisition Any inconsistencies in this solicitation or contract shall be resolved by giving precedence IAW 52.212-4(r). By submitting a quote, the offeror understands that quotes will not be referenced in 1449 and clauses incorporated in the solicitation will dictate the contract. All offerors shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under the contract IAW RFO 52.212-4(q). The Government reserves the right to deny requests for clause changes that are not included in this solicitation should the request be inconsistent with the RFO or VAAR.
The following RFO clauses are incorporated by reference:
Applicable (X)
Number
Title
Source
X
52.203-6 with Alt I
Restrictions on Subcontractor Sales to the Government
Statute
X
52.203-13
Contractor Code of Business Ethics and Conduct
Statute
X
52.203-17
Contractor Employee Whistleblower Rights
Statute
X
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
Statute
X
52.204-9
Personal Identity Verification of Contractor Personnel
Other
X
52.204-13
System for Award Management Maintenance
Statute
52.204-91
Contractor identification
Other
X
52.209-6
Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
Statute
X
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
Statute
X
52.209-10
Prohibition on Contracting with Inverted Domestic Corporations
Statute
52.219-4
Notice of Price Evaluation Preference for HUBZone Small Business Concerns
Statute
X
52.219-6
Notice of Total Small Business Set-Aside
Statute
52.219-6 with Alt I
Notice of Total Small Business Set-Aside, with Alternate I
Statute
X
52.219-8
Utilization of Small Business Concerns
Statute
52.219-9
Small Business Subcontracting Plan
Statute
52.219-9 with Alt I
Small Business Subcontracting Plan, with Alternate I
Statute
52.219-9 with Alt II
Small Business Subcontracting Plan, with Alternate II
Statute
52.219-9 with Alt III
Small Business Subcontracting Plan, with Alternate III
Statute
52.219-9 with Alt IV
Small Business Subcontracting Plan, with Alternate IV
Statute
X
52.219-14
Limitations on Subcontracting
Statute
52.219-16
Liquidated Damages Subcontracting Plan
Statute
52.219-33
Nonmanufacturer Rule
Statute
X
52.222-3
Convict Labor
EO
X
52.222-19
Child Labor Cooperation with Authorities and Remedies
EO
X
52.222-35
Equal Opportunity for Veterans
Statute
52.222-35 with Alt I
Equal Opportunity for Veterans, with Alternate I
Statute
X
52.222-36
Equal Opportunity for Workers with Disabilities
Statute
52.222-36 with Alt I
Equal Opportunity for Workers with Disabilities, with Alternate I
Statute
X
52.222-37
Employment Reports on Veterans
Statute
X
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
EO
X
52.222-41
Service Contract Labor Standards
Statute
X
52.222-42
Statement of Equivalent Rates for Federal Hires
Employee Class Monetary Wage-Fringe Benefits
Master Electrician ___________GS-13__________
_____________ __________________________
Statute
X
52.222-43
Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts)
Statute
52.222-44
Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment
Statute
X
52.222-50
Combating Trafficking in Persons
Statute
52.222-50 with Alt I
Combating Trafficking in Persons, with its Alternate I
Statute
52.222-51
Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Requirements
Other
52.222-53
Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services Requirements
Other
X
52.222-54
Employment Eligibility Verification
EO
X
52.222-62
Paid Sick Leave Under Executive Order 13706
EO
52.223-9
Estimate of Percentage of Recovered Material Content for EPA-Designated Items
Statute
52.223-9 with Alt I
Estimate of Percentage of Recovered Material Content for EPA-Designated Items, with Alternate I
Statute
52.223-11
Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons
Statute
52.223-12
Maintenance
Statute
52.223-20
Aerosols
Statute
52.223-21
Foams
Statute
X
52.223-23
Sustainable Products and Services
Statute
52.224-3
Privacy Training
Statute
52.224-3 with Alt I
Privacy Training, with Alternate I
Statute
52.225-1
Buy American-Supplies
Statute
52.225-1 with Alt I
Buy American-Supplies, with Alternate I
Statute
52.225-3
Buy American-Free Trade Agreements-Israeli Trade Act
Statute
52.225-3 with Alt II
Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate II
Statute
52.225-3 with Alt III
Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate III
Statute
52.225-3 with Alt IV
Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate IV
Statute
52.225-5
Trade Agreements
Statute
52.225-19
Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States
Other
52.225-26
Contractors Performing Private Security Functions Outside the United States
Statute
52.226-4
Notice of Disaster or Emergency Area Set-Aside
Statute
52.226-5
Restrictions on Subcontracting Outside Disaster or Emergency Area
Statute
X
52.226-8
Encouraging Contractor Policies to Ban Text Messaging While Driving
EO
52.229-12
Tax on Certain Foreign Procurements
Statute
52.232-29
Terms for Financing of Commercial Products and Commercial Services
Statute
52.232-30
Installment Payments of Commercial Products and Commercial Services
Statute
X
52.232-33
Payment by Electronic Funds Transfer System for Award Management
Statute
52.232-34
Payment by Electronic Funds Transfer Other than System for Award Management
Statute
52.232-36
Payment by Third Party
Statute
X
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
Statute
52.232-90
Fast Payment Procedure
Statute
X
52.233-3
Protest After Award
Statute
X
52.233-4
Applicable Law for Breach of Contract Claim
Statute
X
52.240-91
Security Prohibitions and Exclusions
Statute
52.240-91 with Alt I
Security Prohibitions and Exclusions, with Alternate I
Statute
52.240-92
Security Requirements
Other
52.240-92 with Alt II
Security Requirements with Alternate II
Other
52.240-93
 Basic Safeguarding of Covered Contractor Information Systems
Â
X
52.244-6
Subcontracts for Commercial Products and Commercial Services
Statute
52.247-64
Preference for Privately Owned U.S.-Flag Commercial Vessels
Statute
52.247-64 with Alt I
Preference for Privately Owned U.S.-Flag Commercial Vessels, with Alternate I
Statute
52.247-64 with Alt II
Preference for Privately Owned U.S.-Flag Commercial Vessels, with Alternate II
Statute
Additional contract requirements or terms and conditions:
852.252-70, Provisions and Clauses Applicable to VA Acquisition of Commercial Items:
VAAR Clauses are incorporated by reference as follows:
VAAR 852.203-70
Commercial Advertising (MAY 2018)
VAAR 852.219-73
VA Notice of Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses. (JAN 2023) (DEVIATION)
VAAR 852.232-72
Electronic Submission of Payment Requests (NOV 2018)
VAAR 852.246-71
Rejected Goods (OCT 2018)
VAAR 852.222-71
Compliance with Executive Order 13899. (DEVIATION) (APR 2025)
VAAR Provisions are incorporated as follows:
VAAR 852.233-70
Protest Content/Alternative Dispute Resolution (OCT 2018)
VAAR 852.233-71
Alternate Protest Procedure (OCT 2018)
RFO 52.252-1 Solicitation Provisions Incorporated by Reference
The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer. Copies of these provisions or clauses are available on the Internet at the web sites provided in the provision at RFO 52.252-1, Solicitation Provisions Incorporated by Reference. Copies may also be obtained from the contracting officer.
https://www.acquisition.gov/far-overhaul
https://www.acquisition.gov/vaar
The following RFO provisions are to be incorporated by reference:
Applicable (X)
Number
Title
Source
X
52.203-11
Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions
Statute
X
52.203-18
Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation
Statute
X
52.204-7
System for Award Management Registration
Statute
52.204-7 with Alt I
System for Award Management Registration, with Alternate I
Statute
X
52.204-90
Offeror Identification
Statute
52.207-6
Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts)
Statute
52.209-12
Certification Regarding Tax Matters
Statute
52.219-2
Equal Low Bids
Statute
52.222-18
Certification Regarding Knowledge of Child Labor for Listed End Products
E.O.
52.222-48
Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment Certification
Other
52.222-52
Exemption from Application of the Service Contract Labor Standards for Certain Services-Certification
Other
52.222-56
Certification Regarding Trafficking in Persons Compliance Plan
Statute
52.223-4
Recovered Material Certification
Statute
52.225-2
Buy American Certificate
Statute
52.225-4
Buy American-Free Trade Agreements-Israeli Trade Act Certificate
Statute
52.225-6
Trade Agreements-Certificate
Statute
52.225-20
Prohibition on Conducting Restricted Business Operations in Sudan-Certification
Statute
52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications
Statute
52.226-3
Disaster or Emergency Area Representation
Statute
52.229-11
Tax on Certain Foreign Procurements Notice and Representation
Statute
X
52.240-90
Security Prohibitions and Exclusions Representations and Certifications
Statute
The Defense Priorities and Allocations System (DPAS) does not apply.
Date and Time offers are due to thaddeus.gray@va,gov by 12:00pm MT, April 28th, 2026.
Name and email of the individual to contact for information regarding the solicitation:
Thaddeus F. Gray
thaddeus.gray@va.gov
Files
| File | Type | Posted |
|---|---|---|
| VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate.docx | DOCX document | |
| 36C25926Q0348 0006.docx | DOCX document | |
| Additional Questions and Answers - Electrical Testing.docx | DOCX document | |
| Revised Statement of Work - Electrical Testing - 05-20-2026.docx | DOCX document | |
| Revised Line Items - 05-20-2026.docx | DOCX document | |
| 36C25926Q0348 0005.docx | DOCX document | |
| 480V Cutoff.pdf | ||
| 36C25926Q0348 0004.docx | DOCX document | |
| Elect One Line 11x17_2024-04-29.pdf | ||
| Conduct Campuswide Electrical Coordination Study.pdf | ||
| 36C25926Q0348 0003.docx | DOCX document | |
| 36C25926Q0348 0002.docx | DOCX document | |
| P09_SOW_Electrical Testing.docx | DOCX document | |
| 36C25926Q0348 0001.docx | DOCX document | |
| 36C25926Q0348.docx | DOCX document | |
| P09_SOW_Electrical Testing.pdf | ||
| Wage Determination 2015-5419.pdf |
Show all 17
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland | Veterans Integrated Service Network 10 | Total Small Business | |
| J061--triennial electrical maintenance FY26 amendment #3 q&a response, scope update, drawings and panel lists new deadline: 10/27/26 POP start date: 12/01/2026 | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| 36-Month Electrical Distribution Testing | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business | |
| 657A5-26-111, Triennial Electrical Testing | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business Sole Source | |
| J030--Generator-ATS Maintenance (VA-27-00002745) | National Acquisition Center | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity