Elect One Line 11x17_2024-04-29.pdf
PDF 13 MB Posted
- Attached to
- H261--TRIENNIAL ELECTRICAL TESTING
- Solicitation number
- 36C25926Q0348
About this file
This document comprises electrical one-line diagrams for a normal power system and essential electrical system serving a building facility in Aurora, Colorado. The diagrams illustrate the complete electrical distribution architecture including feeders, transformers, switchgear, and branch circuits across multiple buildings (North, South, East, and Center facilities) and areas including parking structures and visitor centers.
The normal power system diagrams depict incoming utility service through multiple transformer stations feeding various building loads. The essential electrical system diagrams show backup power distribution, likely connected to emergency generators, serving critical loads designated as essential. Both systems include detailed transformer and feeder schedules identifying equipment specifications, voltage ratings, and circuit configurations. The drawings incorporate flag notes addressing specific installation requirements, voltage specifications, and operational details. Key system components include primary and secondary distribution networks, step-down transformers at various voltage levels, and individual circuit protection and metering equipment. The electrical infrastructure is designed to serve the facility's operational and emergency power requirements with redundancy and sectionalizing capabilities to isolate loads as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25926Q0348 0006.docx | DOCX document | |
| VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate.docx | DOCX document | |
| 36C25926Q0348 0005.docx | DOCX document | |
| Revised Statement of Work - Electrical Testing - 05-20-2026.docx | DOCX document | |
| 480V Cutoff.pdf | ||
| Additional Questions and Answers - Electrical Testing.docx | DOCX document | |
| Revised Line Items - 05-20-2026.docx | DOCX document | |
| Conduct Campuswide Electrical Coordination Study.pdf | ||
| 36C25926Q0348 0004.docx | DOCX document | |
| 36C25926Q0348 0003.docx | DOCX document | |
| P09_SOW_Electrical Testing.docx | DOCX document | |
| 36C25926Q0348 0002.docx | DOCX document | |
| 36C25926Q0348 0001.docx | DOCX document | |
| 36C25926Q0348.docx | DOCX document | |
| Wage Determination 2015-5419.pdf | ||
| P09_SOW_Electrical Testing.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .