GYM floor replacement kces

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140A2325Q0065
Agency
Bureau of Indian Affairs and Indian Education Department of the Interior
Responses due
Set-aside
Indian Small Business Economic Enterprise

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1CA Maintenance Of Schools
Place of performance
100 Main Street Keams Canyon AZ 86034
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior's Bureau of Indian Affairs and Indian Education is seeking a contractor to replace the gym floor at Keams Canyon Elementary School in Keams Canyon, Arizona. The solicitation (No. 140A2325Q0065) requires a comprehensive floor replacement involving complete removal and installation of a new Bio-Channel Star floor system with specific performance standards, including game lines for basketball and volleyball courts. Proposals will be evaluated using Lowest Price Technically Acceptable criteria, with bids due by March 28, 2025, at 5:00 pm MDT. Potential offerors must submit proposals via email and are required to attend a mandatory site visit scheduled for February 21, 2025, at 10:00 am MST. Contractors must provide all labor, materials, design services, and construction work while complying with BIA/BIE standards and applicable codes, and use MFMA-certified installers.

The contract is exclusively set aside for Indian Small Business Economic Enterprise (ISBEE) participants, with an estimated contract value between $100,000 and $250,000. The project will be awarded as a firm-fixed-price construction contract with a strict 60-calendar-day performance period from the Notice to Proceed. Performance and payment bonds of 100% of the contract price are mandatory, along with a 20% bid bond. The place of performance is 100 Main St, Keams Canyon, AZ 86034, and contractors must adhere to Davis-Bacon wage rates and tribal taxes/TERO fees. Background screening will be required for all personnel working on-site, and the contractor must provide warranties and maintenance documentation for the new flooring system. The project involves installing a vapor barrier, shock-absorbing pad, subfloor assembly, and 25/32" thick Northern Hard Maple flooring with specific performance standards like DIN 18032 and ASTM F2772.

Notice text

GYM FLOOR REPLACEMENT KCES

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140A2325Q0065_Amd_0002.pdf PDF
B08_Questions_and_Answers_Log_0002.xlsx XLSX spreadsheet
Drawings_0002.pdf PDF
Sol_140A2325Q0065_Amd_0001.pdf PDF
IA_Form_3000_Material_Approval_Submittal_2_Pages.pdf PDF
A04_SOWKCESGYMFloor.docx DOCX document
SF25_Performance_Bond_2_Pages.pdf PDF
SF25A_Payment_Bond_2_Pages.pdf PDF
Sol_140A2325Q0065.pdf PDF
B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
Health___Safety_Codes_4_Pages.pdf PDF
SF_24_Bid_Bond_4_Pages.pdf PDF
IA_Form_C113_Progress_Schedule_2_Pages.pdf PDF
IA_Form_C713_Progress_Report_1_Page.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
WD_AZ20250027_-_1-3-2025.pdf PDF
Show all 16

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GYM floor replacement kces Award Award Notice
GYM floor replacement kces This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity