About this file

This is Form IA 3000, a Material Approval Submittal form used by the Department of the Interior Indian Affairs for contractors to submit materials for government approval. The form, revised September 29, 2020, allows contractors to document and obtain approval for articles, supplies, raw materials, equipment, parts, components, and end items to be incorporated into contract work.

The form requires contractors to list items for approval with specification sections, descriptions, model numbers, and manufacturer details. It includes sections for contractor certification, government review by the Contracting Officer and Project Engineer/COR, and final approval/disapproval decisions. The form must be prepared in 4 copies, submissions must be numbered consecutively by contract, and all attachments must be clearly tabbed and identified to correspond with item numbers. This form template is associated with a solicitation for Gym Floor Replacement at KCES under solicitation number 140A2325Q0065 for the Bureau of Indian Affairs and Indian Education.

View the file

Other files for this federal contract opportunity

Other files attached to GYM FLOOR REPLACEMENT KCES, newest first.
File Type Posted
Sol_140A2325Q0065_Amd_0002.pdf PDF
Drawings_0002.pdf PDF
B08_Questions_and_Answers_Log_0002.xlsx XLSX spreadsheet
Sol_140A2325Q0065_Amd_0001.pdf PDF
SF_24_Bid_Bond_4_Pages.pdf PDF
IA_Form_C113_Progress_Schedule_2_Pages.pdf PDF
IA_Form_C713_Progress_Report_1_Page.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
WD_AZ20250027_-_1-3-2025.pdf PDF
A04_SOWKCESGYMFloor.docx DOCX document
SF25_Performance_Bond_2_Pages.pdf PDF
SF25A_Payment_Bond_2_Pages.pdf PDF
Sol_140A2325Q0065.pdf PDF
B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
Health___Safety_Codes_4_Pages.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior, Indian Affairs Revised on Sept 29, 2020

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Contracting Officer)

For Evaluation and Action

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

TO: (Project Engineer or Contracting Officer Representative)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE

REVERSE

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

TO: (Contractor)

APPROVED

DISAPPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ________ DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

IA FORM 3000 PREVIOUS EDITION IS OBSOLETE.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

IA FORM 3000

Revised on Sept 29 2020:
TO Contracting Officer:
FROM Contractor:
DATE:
CONTRACT NUMBER:
SUBMITTAL:
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1:
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
ITEM NORow12:
SPECIFICATION SECTION PARA NODRAWING NORow12:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow12:
DATE_2:
TYPE OR PRINT NAME AND TITLE:
TO Contracting Officer_2:
For Evaluation and Action:
DATE_3:
TYPE OR PRINT NAME AND TITLE_2:
TO Project Engineer or Contracting Officer Representative:
DATE_4:
TYPE OR PRINT NAME AND TITLE_3:
TO Contractor:
DAYS OF DATE SHOWN BELOW:
DATE_5:
TYPE OR PRINT NAME AND TITLE_4:
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
COMMENTS Number to correspond with applicable Item Number on reverseRow2:
COMMENTS Number to correspond with applicable Item Number on reverseRow3:
COMMENTS Number to correspond with applicable Item Number on reverseRow4:
COMMENTS Number to correspond with applicable Item Number on reverseRow5:
COMMENTS Number to correspond with applicable Item Number on reverseRow6:
COMMENTS Number to correspond with applicable Item Number on reverseRow7:
COMMENTS Number to correspond with applicable Item Number on reverseRow8:
COMMENTS Number to correspond with applicable Item Number on reverseRow9:
COMMENTS Number to correspond with applicable Item Number on reverseRow10:
COMMENTS Number to correspond with applicable Item Number on reverseRow11:
COMMENTS Number to correspond with applicable Item Number on reverseRow12:
COMMENTS Number to correspond with applicable Item Number on reverseRow13:
COMMENTS Number to correspond with applicable Item Number on reverseRow14:
COMMENTS Number to correspond with applicable Item Number on reverseRow15:
COMMENTS Number to correspond with applicable Item Number on reverseRow16:
COMMENTS Number to correspond with applicable Item Number on reverseRow17:
COMMENTS Number to correspond with applicable Item Number on reverseRow18:
COMMENTS Number to correspond with applicable Item Number on reverseRow19:
COMMENTS Number to correspond with applicable Item Number on reverseRow20:
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Text37:
Check Box38: Off
Text38:
Text39:
Text40:
Text41:
Text42:
Text43:
Text44:
Text45:
Text46:
Text47:
Text48:
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box44: Off
Check Box45: Off

File details come from the government source that posted it. Updated .