Green River Lake Upgrade Flooring in Visitor Center & Project Office
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR25Q0004
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238330 Flooring Contractors
- PSC
- 7220 Floor Coverings
- Place of performance
- Campbellsville, Kentucky 42718, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Louisville District is seeking a small business contractor to perform flooring upgrades at the Green River Lake Visitor Center and Project Office in Campbellsville, Kentucky. The project requires removing approximately 4,900 square feet of existing floor coverings and installing new flooring, including carpet tiles, vinyl plank flooring, and ceramic wood plank tile in specified areas. Contractors must repair subfloor surfaces and coordinate work with the Park Manager to minimize office disruption, with all personnel required to obtain necessary security clearances. The contract will be awarded on a lowest-price basis, with quotes due by January 15, 2025, at 11:00 AM EST, submitted electronically to Donavon.j.waterbury@usace.army.mil. A highly recommended site visit is scheduled for January 8, 2025, at 10:00 AM EST to allow potential bidders to assess the project requirements.
This solicitation is a total small business set-aside under NAICS code 238330 with a small business size standard of $19 million. The contract is a firm-fixed-price construction project with an estimated value between $25,000 and $100,000. Contractors must begin work within 10 days of the Notice to Proceed and complete all installations within 120 calendar days. The place of performance is located in Campbellsville, Kentucky, at the Green River Lake Visitor Center. Two optional items are included in the solicitation for potential removal of wood paneling and installation of drywall on the eastern and western elevations. Performance and payment bonds will be required within 10 calendar days of contract award, and payment will be processed via Electronic Funds Transfer.
Notice text
2 versions
Update #2 · Latest ·
The scope of work includes removal and disposal of existing carpeting throughout the Visitor Center & Project Office (approximately 4900 sq ft). Contractor to repair any cracks, pits, and prepare existing subfloor surfaces. Contractor to install specified floor coverings to specified areas herein, please see section 4 for floor covering specifications. All provided measurements are approximate and the contractor will be responsible for obtaining measurements during the site visit. The contractor’s work and responsibility will include all planning, programing, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State, and Local laws and regulations. Due to the nature of the office setting, flooring removal and installation will be coordinated with the Park Manager to minimize the disruption of the office staff. The contractor will be responsible for moving office furniture and equipment to facilitate the flooring installation. Computers, printers, phones, and other technology equipment will be the responsibility of the USACE employees to move. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Please see Exhibit A for Visitor Center & Project Office building plan.
* Amendment 1 posted on 1-13-2025. Amendment must be acknowledged.
Update #1 ·
The scope of work includes removal and disposal of existing carpeting throughout the Visitor Center & Project Office (approximately 4900 sq ft). Contractor to repair any cracks, pits, and prepare existing subfloor surfaces. Contractor to install specified floor coverings to specified areas herein, please see section 4 for floor covering specifications. All provided measurements are approximate and the contractor will be responsible for obtaining measurements during the site visit. The contractor’s work and responsibility will include all planning, programing, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State, and Local laws and regulations. Due to the nature of the office setting, flooring removal and installation will be coordinated with the Park Manager to minimize the disruption of the office staff. The contractor will be responsible for moving office furniture and equipment to facilitate the flooring installation. Computers, printers, phones, and other technology equipment will be the responsibility of the USACE employees to move. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Please see Exhibit A for Visitor Center & Project Office building plan.
Files
| File | Type | Posted |
|---|---|---|
| W912QR25Q0004 Amendment 1.pdf | ||
| W912QR25Q0004.docx | DOCX document | |
| W912QR25Q0004.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Green River Lake Upgrade Flooring in Visitor Center & Project Office | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Flooring Requirement Contract Solicitation | Air Mobility Command | Total Small Business | |
| Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC | Veterans Integrated Service Network 2 | No set-aside | |
| United states coast guard ketchikan alaska new carpet installation | — | No set-aside | |
| Or warm springs qtrs 4 paint/flooring | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity