About this opportunity

The Washington Air National Guard, 194th Wing seeks construction of a government vehicle parking area and roadway surfaces at the new ASOG Complex, Building 140, Camp Murray, with bid opening on October 15 at 0900 PDT. This is a 100% small business set-aside firm fixed-price contract.

Place of performance is Camp Murray, WA. The scope includes asphalt paving, concrete curbing, retaining wall construction, covered parking installation, lighting, and security fence installation. The project is estimated between $5 million and $10 million under NAICS 238990. Prevailing wage rates apply per WD# WA20260111 (Revised May 18, 2026).

Contractor must commence work within ten calendar days of Notice to Proceed and complete within 360 calendar days; liquidated damages of $455 per calendar day apply for failure to meet the completion deadline. A qualified superintendent with minimum ten years construction experience and five years as superintendent on similar projects is required. The contractor must submit a Critical Path Method project schedule within seven calendar days of NTP, maintain daily contractor quality control reports, comply with USACE EM 385-1-1 safety standards, and provide a Site Safety and Health Officer on-site at all times.

Work is restricted to September 1 through November 30 for tree removal due to eagle and migratory bird activity; if work occurs during February through August, pre-construction bird surveys are required. The contractor must plant 25 Oregon White Oaks to mitigate timber removal. Work hours are Monday through Friday, 0700 to 1500 normal operations.

Award will be made to the responsible bidder with the lowest total evaluated price. Bid guarantee is required at 20 percent of bid price or $3 million, whichever is less. Performance and payment bonds are required at 100 percent of contract price. Bids must remain valid for 90 days post-opening. All offerors must be registered in SAM.gov. Bids must be submitted electronically through PIEE Solicitation Module or in person at Building 127; faxed and emailed bids are not accepted.

Three amendments have been issued: Amendment 0001 extended RFIs to September 27 and moved bid opening to October 15; Amendment 0002 extended the response due date and added Attachment 7 (Tree-Removal Areas) and Attachment 8 (Contractor Environmental Guide); Amendment 0003 updated Attachment 3 (Type B-3 Final Specifications) and clarified small business joint venture representation requirements. Pre-bid conference and first site visit were held September 10 at 0900 PST; a second site visit occurred September 17.

Notice text

8 versions

Update #8 · Latest ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation. Amendment 0003 is to update and correct some information to avoid confusion. See W50S9E26BA0002P00003 SF30 for list of changes. This update is to correct the closeout date and time for the solicitation module only, no other changes occured.

Update #7 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation. Amendment 0003 is to update and correct some information to avoid confusion. See W50S9E26BA0002P00003 SF30 for list of changes.

Update #6 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

There have been two amendments for this solicitation and updated documents posted, if you can't see the two amendments or the 8 attachment documents please let the Contracting Specialist know through the email provided.

Update #5 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local.  Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA. 

RFI's due out is extended to being due by the end of the day 27 Sep 2026, and Bid Openning is going to be moved to 15 Oct 2026 at 0900 local.  Ammendment to the Soliciation forthcoming to show those changes.

See Amendment W50S9E26BA0020001 in attachments for amended soliciation and W50S9E26BA0020001 SF30 for the changes.

See Amendment W50S9E26BA0020002 in attachments for amended soliciation and W50S9E26BA020002 SF 30 for the changes.

Update #4 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local.  Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA. 

RFI's due out is extended to being due by the end of the day 27 Sep 2026, and Bid Openning is going to be moved to 15 Oct 2026 at 0900 local.  Ammendment to the Soliciation forthcoming to show those changes.

See Amendment W50S9E26BA0020001 in attachments for amended soliciation and W50S9E26BA0020001 SF30 for the changes.

Update #3 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local.  Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA. 

RFI's due out is extended to being due by the end of the day 27 Sep 2026, and Bid Openning is going to be moved to 15 Oct 2026 at 0900 local.  Ammendment to the Soliciation forthcoming to show those changes.

Update #2 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local.  Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA. 

Update #1 ·

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.

Files

File Type Posted
Solicitation Amendment - W50S9E26BA0020003.pdf PDF
Attachment 3 - Type B-3 Final Specifications Rev Sep 2026.pdf PDF
Solicitation Amendment W50S9E26BA0020003 SF 30.pdf PDF
Attachment 2 - Type B-3 - Final GOV Parking and Armor Dr Draw.pdf PDF
Attachment 3 - Type B-3 - Final Specifications.pdf PDF
Attachment 8 - Contractor Environmental Guide-July2026.pdf PDF
Solicitation Amendment W50S9E26BA0020002 SF 30.pdf PDF
Attachment 5 - 05c Specifications.pdf PDF
Solicitation Amendment - W50S9E26BA0020002.pdf PDF
Attachment 6 - Example Bid Report Construct Parking and Roadway.xlsx XLSX spreadsheet
Attachment 4 - Type B-3 - Final Infantry Drive Drawings.pdf PDF
Attachment 7 - Tree-Removal Areas_28Sep26.pdf PDF
Attachment 1 - WA ANG Construction Solicitation SOW Construct Parking and Road 28 Sep 26.pdf PDF
Parking and Roadway site visit signin.pdf PDF
Solicitation Amendment W50S9E26BA0020001 SF 30.pdf PDF
Solicitation Amendment W50S9E26BA0020001.pdf PDF
Attachment 5 - 05c Specifications.pdf PDF
Attachment 6 - 07 Example Bid Report Construct Parking and Roadway.xlsx XLSX spreadsheet
Attachment 2 - GOV Parking and Armor Drive Drawings - 30-July-2026.pdf PDF
Attachment 3 - Camp Murray ASOG Site Improvements - Type B-3 - Specifications.pdf PDF
Attachment 4 - Construct Infantry Dr to B116 Drawings - 30-July-2026.pdf PDF
W50S9E26BA002 Solicitation.pdf PDF
Attachment 1 - 05 WA ANG Construction Solicitation SOW Construct Parking and Road.pdf PDF
Show all 23

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
194 wing construct parking and roadway Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity