Attachment 7 - Tree-Removal Areas_28Sep26.pdf
PDF 2 MB Posted
- Attached to
- GOV Parking and Roadway paving, Camp Murray, WA
- Solicitation number
- W50S9E26BA002
- Issued by
-
Department of the Army National Guard
About this file
These are civil engineering construction drawings for a Tree Removal Area project at Camp Murray, dated 28 September 2026. The project involves site preparation and clearing work within defined boundaries near the American Lake shoreline, Quartermaster Road, 41st Division Way, and the Air Support Operations Center.
Key construction requirements include: installation of a 6-foot high chain link fence with tan-colored fabric around the entire site designed to withstand strong wind loads; demolition and removal of existing features as required; clearing and grubbing of existing topsoil within construction limits with stockpiling for use in planting specifications; and removal of existing trees as part of clearing operations. Critical environmental compliance mandates that clearing, grubbing, and tree removal cannot occur between February and August due to nesting and breeding of select bird species at the facility; if construction must occur during this period, pre-construction bird surveys must be conducted immediately preceding activities to identify active nests and implement necessary protection procedures in consultation with relevant agencies and the Contracting Officer. Additional requirements include verification of all existing utilities prior to demolition and construction, removal of temporary construction fencing upon project completion, repair of any damage to existing grade or pavement at contractor expense, sediment removal and ditch scarification prior to demolition, placement of plastic coverings over stockpile materials per Department of Ecology standards, and seeding of all exposed areas with temporary erosion control seed mix. The drawings show site layouts with coordinate references, topographic survey information, and erosion and sediment control details.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMERICAN
LAKE
SHORELINE
B-2
3 4 5 6 7
B-1
CAMPGROUND
B-3
COORDINATE
GENERAL NOTES
1. CONTRACTOR SHALL INSTALL A 6-FOOT HIGH
CHAIN LINK FENCE AROUND THE ENTIRE SITE.
THE FENCE SHALL HAVE ATTACHED
TAN-COLORED FABRIC, AND SHALL BE
APPROPRIATELY INSTALLED TO WITHSTAND
STRONG WIND LOADS.
2. REMOVE TEMPORARY CONSTRUCTION FENCE
AND SUPPORTS FROM THE PROJECT SITE AND
DISPOSE OF OFF BASE UPON COMPLETION OF
THE PROJECT. ANY DAMAGE/ALTERATION TO THE
EXISTING GRADE/PAVEMENT OR SITE D
STRUCTURES SHALL BE REPAIRED TO ITS
ORIGINAL CONDITION, OR BETTER, AT THE
CONTRACTOR'S EXPENSE.
3. CONTRACTOR SHALL VERIFY LOCATION OF ALL
EXISTING UTILITIES PRIOR TO DEMOLITION AND
CONSTRUCTION. UTILITIES SHOWN ARE BASED
ON AVAILABLE INFORMATION AT TIME OF
(3) TYP
1 REMOVAL WITH
GOVERNMENT
CAUTION: EXISTING
OVERHEAD POWER TO REMAIN
TOPOGRAPHIC SURVEY.
4. DEMOLISH AND REMOVE ALL EXISTING FEATURES
AS REQUIRED TO PERFORM THE PROPOSED
WORK.
5. CLEAR AND GRUB EXISTING TOPSOIL WITHIN THE
LIMITS OF CONSTRUCTION; STOCKPILE AND USE
IN ACCORDANCE WITH THE PLANTING
SPECIFICATIONS.
6. DUE TO NESTING AND BREEDING OF SELECT
BIRDS AT CAMP MURRAY, CLEARING, GRUBBING,
AND TREE REMOVAL SHALL NOT OCCUR
BETWEEN FEBRUARY AND AUGUST. IF
CONSTRUCTION MUST OCCUR DURING THIS TIME,
PRE-CONSTRUCTION BIRD SURVEYS SHALL BE
CONDUCTED IMMEDIATELY PRECEDING
CONSTRUCTION ACTIVITIES TO IDENTIFY ANY
ACTIVE NESTS IN THE VICINITY, AND IMPLEMENT
NECESSARY PROTECTION PROCEDURES
ESTABLISHED IN CONSULTATION WITH VARIOUS
AGENCIES AND THE CONTRACTING OFFICER. C
LOC LOC LOC
TP-06
TP-05
AB-01
TYP
LOC LOC LOC LOC
TP-04
111'-5"
KEY NOTES
*NOT ALL KEYNOTES ARE USED ON ALL SHEETS
1. REMOVE EXISTING TREE AS A PART OF
CLEARING AND GRUBBING
2. EXISTING FENCE TO REMAIN, PROTECT IN PLACE
3. MONITORING WELL TO REMAIN AND BE
ADJUSTED TO NEW GRADE. SEE KEY NOTE 14,
SHEET C101
4. REMOVE EXISTING BOLLARDS
B
TP-08
2 TP-03
(3) TYP
F I R E L A N E - N O P A R K I N G
N90°00'00"W 136.47'
AB-03
A
TP-09
BLDG 116
30 0
SCALE IN FEET
30 60
PROJECT MANAGER
CAMP MURRAY
TREE REMOVAL AREA
28 September 2026
0 1" 2" FILENAME
SCALE
10078627-00X101_GOV.DWG SHEET
1" = 30' Attachment-05c107/30/2026 ISSUED FOR GOVERNMENT REVIEW
ISSUE DATE DESCRIPTION
LO
C
44'-0"
82'-3" LO
'-9
/4
FF
II R
EE
L
L A A
N
EE
N
O P
P A A
R
KK
II N
G
'-8
FF
II R
EE
L
L A A
N
EE
N
O P
P A A
R
KK
II N
G
9'
-1
/4
'-0
N 0°
'0
0" E
.0
0'
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
COMMUNICATIONS
PROJECT NUMBER
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
1 2 3 4 5 6 7 8
GENERAL NOTES
AMERICAN
LAKE
SHORELINE
S
AIR SUPPORT
OPERATIONS CENTER
1. SEE SPECIFICATIONS AND LANDSCAPE PLANS FOR
SEED AREAS.
2. PLACE PLASTIC COVERING OVER STOCKPILE
MATERIALS PER THE DEPARTMENT OF ECOLOGY'S
STORMWATER MANAGEMENT MANUAL FOR
WESTERN WASHINGTON BMP C123 AND THE
SPECIFICATIONS.
3. ALL EXPOSED AREAS SHALL BE SEEDED WITH
TEMPORARY EROSION CONTROL SEED MIX PER
DEPARTMENT OF ECOLOGY'S STORMWATER
MANAGEMENT MANUAL FOR WESTERN D
WASHINGTON BMP C120, TABLE 11-4.1.2.
4. CONTRACTOR SHALL REMOVE SEDIMENT FROM
DITCHES AND SCARIFY PRIOR TO DEMOLITION.
5. SEE SHEETS X100 FOR CONSTRUCTION STAGING
AND LAYDOWN AREA AND NOTES.
LP
3 1
2 CB MH
LP
1 1
FH
KEY NOTES
*NOT ALL NOTES ARE USED ON ALL SHEETS
1. INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD. PLAN I-40.20-00 ON SHEET C505
2. INSTALL WATTLE INSTALLATION ON SLOPE PER
S WSDOT STD. PLAN 1-30.30-02 ON SHEET C505
3. INSTALL HIGH VISIBILITY FENCE PER WSDOT STD.
PLAN I-10.10-01 ON SHEET C505
4. INSTALL SILT FENCE PER PIERCE COUNTY
EROSION AND SEDIMENT CONTROL PLAN DETAIL
8.0 ON SHEET C504 C
5. INSTALL CONCRETE WASHOUT AREA PER DEPT.
4 OF ECOLOGY FIG. II-4.1.7b ON SHEET C504
6. INSTALL CHECK DAMS ON CHANNELS PER WSDOT
STD. PLAN 1-50.20-01 ON SHEET C505
6 TYP
B
41ST DIVISION WAY
A
BLDG 112
30 0
SCALE IN FEET
30 60
PROJECT MANAGER
CAMP MURRAY TREE REMOVAL AREA
28 September 2026
0 1" 2" FILENAME 10078627-00C113-B116.DWG SHEET
07/30/2026 ISSUED FOR GOVERNMENT REVIEW
ISSUE DATE DESCRIPTION
SF
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
COMMUNICATIONS
PROJECT NUMBER Attachment-05c2
| AMERICAN LAKE |
| AIR SUPPORT OPERATIONS CENTER |
| KEY NOTES |
| 41ST DIVISION WAY |
| CAMP MURRAY ASOG FACILITY |
| EROSION CONTROL PLAN |
| C113 |
| GOV Parking-TreeRemoval-Area.pdf |
| AMERICAN LAKE |
| 3 4 5 6 7 |
| GENERAL NOTES |
| KEY NOTES |
| B |
| A |
EXISTING CONDITIONS AND DEMOLITION PLAN