Attachment 2 - Type B-3 - Final GOV Parking and Armor Dr Draw.pdf

PDF 21 MB Posted

Attached to
GOV Parking and Roadway paving, Camp Murray, WA
Solicitation number
W50S9E26BA002
Issued by

About this file

This is a set of Contract Drawings for ASOG Complex Site Improvements at Camp Murray ANGB, Washington, issued for construction in September 2026. The project encompasses two primary construction components: Government Parking Expansion and Armor Drive construction.

The drawings include comprehensive civil, structural, architectural, electrical, mechanical, fire protection, and communications design packages. Civil work consists of site improvements including parking lot expansion with approximately 102-168 linear feet of roadway (Armor Drive) featuring asphalt pavement, concrete curb and gutter, storm and sanitary drainage systems, utilities coordination, erosion control measures, and landscape plantings. Structural work includes three parking shelter structures with steel framing, metal deck roofing, concrete slab-on-grade foundations, and associated column base details. Electrical design provides site lighting, power distribution, grounding systems, underground conduit banks, handholes, receptacles, and controls. The project requires coordination with existing utilities, protection of existing trees and monitoring wells, site fencing installation, and compliance with 200-foot shoreline buffers and 50-foot fence buffer lines. Construction phasing must accommodate nesting and breeding periods (February-August) with pre-construction bird surveys required if work occurs during this window. The contractor is responsible for all utilities connections, permits, fees, and coordination with government and utility companies. Project control points, site survey data, and detailed specifications are provided across multiple drawing sheets with site-specific coordinates based on Camp Murray vertical benchmarks and Washington State Plane Coordinate System South Zone.

View the file

Other files

File Type Posted
Solicitation Amendment - W50S9E26BA0020003.pdf PDF
Attachment 3 - Type B-3 Final Specifications Rev Sep 2026.pdf PDF
Solicitation Amendment W50S9E26BA0020003 SF 30.pdf PDF
Attachment 3 - Type B-3 - Final Specifications.pdf PDF
Attachment 8 - Contractor Environmental Guide-July2026.pdf PDF
Solicitation Amendment W50S9E26BA0020002 SF 30.pdf PDF
Attachment 5 - 05c Specifications.pdf PDF
Solicitation Amendment - W50S9E26BA0020002.pdf PDF
Attachment 6 - Example Bid Report Construct Parking and Roadway.xlsx XLSX spreadsheet
Attachment 4 - Type B-3 - Final Infantry Drive Drawings.pdf PDF
Attachment 7 - Tree-Removal Areas_28Sep26.pdf PDF
Attachment 1 - WA ANG Construction Solicitation SOW Construct Parking and Road 28 Sep 26.pdf PDF
Parking and Roadway site visit signin.pdf PDF
Solicitation Amendment W50S9E26BA0020001 SF 30.pdf PDF
Solicitation Amendment W50S9E26BA0020001.pdf PDF
Attachment 2 - GOV Parking and Armor Drive Drawings - 30-July-2026.pdf PDF
Attachment 5 - 05c Specifications.pdf PDF
Attachment 6 - 07 Example Bid Report Construct Parking and Roadway.xlsx XLSX spreadsheet
Attachment 3 - Camp Murray ASOG Site Improvements - Type B-3 - Specifications.pdf PDF
Attachment 4 - Construct Infantry Dr to B116 Drawings - 30-July-2026.pdf PDF
W50S9E26BA002 Solicitation.pdf PDF
Attachment 1 - 05 WA ANG Construction Solicitation SOW Construct Parking and Road.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .